Feedwater Heaters Flashcards
Whater are Turbine/Gen load limits with D heaters out of service?
1 string - 95%
2 strings - 95%
3 strings - 100%
Whater are Turbine/Gen load limits with C out of service?
1 string - 680MWe
Whater are Turbine/Gen load limits with B out of service?
1 string - 450MWe
Whater are Turbine/Gen load limits with a single LP String out of service?
450MWe
Whater are Turbine/Gen load limits with a single string of ALL Heaters (HP and LP) out of service?
450MWe
Whater are Turbine/Gen load limits with a single D and C FWH out of service?
680MWe
Whater are Turbine/Gen load limits with a singe D, C, and B FWH out of service?
620MWe
Whater are Turbine/Gen load limits with a single C and B FWH OOS?
620MWe
Whater are Turbine/Gen load limits with a single D and B FWH out of service?
620MWe
What is the general rule of thumb for operating with multiple heaters out of service?
Any simultaneous combilation of multiple heaters out of servic should be limited to the lowest (limiting value)
What effect does removal of heaters have on Rx power?
Positive reactibity addition would occur due to FWH temp drop
How is the Extraction Valve “SLOWLY” opened?
Placing valve in PTS prevents further travel