BOOK 100 HIGH RISE MANUAL CHAPTER 14 DEMOBILIZATION / OVERHAUL / RE-ENTRY Flashcards
1
Q
After a knockdown has been declared, the primary goals for an Incident Commander are:
- Develop Cause Determination
- Develop a _______Plan
- Develop an ________plan
- Develop a ____/_____ Plan
A
Demobilization
Overhaul
Re-entry/re-housing
2
Q
Due to the magnitude of most high-rise fires and the associated dollar loss, this function is normally performed, as per Department policy, by an
A
A unit
3
Q
The Incident Commander will determine if overhaul should be done while wearing
A
SCBA
4
Q
For incidents requiring large-scale evacuation of a building, the Re-Entry/Re-Housing Unit Leader position should be established. This position reports to the
A
EVACUATION GROUP SUPERVISOR