BAC Flashcards
The purpose of the Boric Acid Reclamation sub-system is…
…to store and process, for re-use and/or for volume reduction, relatively clean borated water from various plant sources.
The only portions of the system requiring heat tracing to preclude boric acid precipitation are…
The boric acid batching tank and refueling water tank concentrator (BAC) concentrate discharge line to the solid radwaste system.
A BAC steam vapor release to __(1)__ and requires a __(2)__ due to __(3)__
(1) the plant vent
(2) a Radioactive Effluents Discharge Permit
(3) Steam vapor contains tritium as part of the water molecule
When in the normal position, either of the following signals will stop the holdup pump:
Lo-lo holdup tank level (28”)
High boric acid concentrator flash tank level.
Other holdup tank pump starts.
Diversion of letdown flow CH-500 to the pre-holdup ion exchanger when the holdup tank contents are being re-purified (CH-V686 open).
Electrical protection or loss of control power.
The BAC HUT alarm set points are…
hi-hi level alarm at 42’
high level alarm at 17’
low level alarm at 4’
low-low level alarm at 28” (HUT pump trip)
The BAC CONC TRBL alarms in the control room…
…with no time delay.