1
Q

On a turbine trip/load rejection what are the steam dump controls based on

A
  • Auctioneered High Tavg
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which group(s) stagger open instead of opening all together? ***

A
  • Group 1 only
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which steam dump groups are allowed to operate when the turbine trip controller is activated?

A
  • Groups I and II
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Which steam dump groups are allowed to operate when the load rejection controller is activated?

A
  • Groups I, II, and III
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What signals does the turbine trip ctrlr use to open steam dumps?

A
  • Auctioneered High Tavg - Tno-load
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What signals does the load rejection ctrlr use to open steam dumps?

A
  • Auctioneered High Tavg - Tref
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

*** A Unit 2 reactor trip occurred from 90% power. The following plant conditions exist:

• Reactor trip breakers: OPEN
• Main turbine stop valve (C): OPEN
• Condenser vacuum: 21.4 in. Hg.
• RCS Tavg: 561°F
• Auto Stop Oil Pressure: 400 psig

Assuming all other equipment operated as designed and no operator actions are taken, the Steam Dump system is:

A. armed and dumping steam to the condenser with group 1 trip open solenoid bistables energized and group 2 modulating.

B. armed and dumping steam to the condenser with groups 1 and 2 trip open solenoid bistables energized.

C. armed but not dumping steam to the condenser because of a blocking signal.

D. not armed and not dumping steam to the condenser.

A

A. armed and dumping steam to the condenser with group 1 trip open solenoid bistables energized and group 2 modulating.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the trip open signals for Turbine Trip bistables for steam dumps? ***

A
  • 10°F Group I
  • 20°F Group II
    (Direct 20# air to the trip/open valves)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the trip open signals for Load Rejection bistables for steam dumps?

A
  • 9°F Group I
  • 13°F Group II
  • 17°F Group III
    (Direct 20# air to the trip/open valves)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Load Rejection control will maintain temperature within ___ between Auctioneered High Tavg and Tref with no rod motion. ***

A
  • 5°F
How well did you know this?
1
Not at all
2
3
4
5
Perfectly