During step 4 of ECA-0.0 (Establishing AFW > 240K), the STA tells the US that a transition to FR-H.1 is necessary due to a valid RED PATH in Heat Sink. The US verifies that there is a valid RED PATH for Heat Sink. What should the crew do?
Status trees should be monitored for information only
The primary reason Seal Return valves are isolated in ECA-0.0 is to:
Prevent steam binding of the Charging Pumps
The cooldown and depressurization at 100ºF/hr in ECA-0.0 is performed in order to:
Minimize RCS inventory loss through the RCP seals, which maximizes time until core uncovery.
During the cooldown at 100ºF/hr in ECA-0.0, 2 of the 4 SG levels drop below 13%. Should the cooldown be stopped to recover SG level?
No. One intact SG is required to be above 13% minimum level.
During step 9 of ECA-0.0, the US puts down ECA-0.0 and starts directing SUP-012 to restore power. The STA tells the US that he should continue with ECA-0.0 while SUP-012 is performed. Is the STA correct?
YES! The STA is correct. The US needs to continue directing steps in ECA-0.0 in order to start the cooldown as soon as possible.