What is the SDG loading sequence

A

EP UV sensed - Wait 150 seconds
MDS Opens
SDGs start
First SDG to speed closes its breaker
Second SDG synchronizes to first
Breaker to EP closes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What loads are the alternate offsite power source (EP) rated to carry

A

One train of ESF equipment in one unit
One train of safe shutdown equipment in the other unit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What loads are the SDGs rated to carry

A

1 train of RCS inventory control (ESF loads) in a single unit