RQ-C-4864 (AFW) Flashcards
Auxiliary Feedwater
What are the preferred suction sources for AFW listed in order
1) Affected Unit CST
2) Unaffected Unit CST
3) Affected Unit hotwell
4) ESW
What happens in the AFW system as a result of a flow conservation signal
- DCRs close (SG blowdown terminated)
- AFW test valves close
- AFW FMOs open
Unit 1 was operating at 100% power with the East MDAFP OOS. 15 minutes ago a reactor trip was initiated due to a large steam break on SG 12. Given the following conditions:
The steam break has finished blowing down.
The SGSVs (MRV-210 & 240) for SG 11 and 14 closed as expected.
The SGSVs (MRV-220 & 230) for SG 12 and 13 failed to close.
Bus T11A is de-energized due to a fault experienced on the trip.
What is the only AFW supply (pump) that can be aligned to feed SGs 11 & 14?
- U2 East MDAFP via crosstie (TDAFP no available due to SG 12 & 13 blowing down as a result of steam line break).