Why did England Street require an EPA
Council RFI asking about invert levels and to clarify discrepancies between survey and architectural plans and requested a overland flow path report
KA engaged civil engineer
They gave feedback on issues raised in RFI, including discrepancies between plans, and how levels indicated may require a pump for both stormwater and wastewater (addition of basement)
Site CCTV done and discovered that soakhole exists for stormwater
Stormwater engineer recommended a connection to public system due to additional coverage added to property
Stormwater engineer to provide a proposal for draiange (draiange plan) and the completed OLFP assessment
Because of the new infrastructure for the stormwater connection, this required an EPA (Engineering Plan approval).
The EPA required CCTV/physical inspection of the road stormwater systems to understand the levels