LOT 202.37 EAB/CR HVAC Flashcards
- LOT 202.37 EAB/CR HVAC*
- *
What will close the EAB HVAC tornado damper?
- *3 psid**
- Closes in 0.25 sec*
- LOT 202.37 EAB/CR HVAC*
- *
Which AHUs in the EAB/CR HVAC are cooled by Essential Chilled Water?
- *EAB AHUs**
- *Penetration Space Emergency AHU**
- Pen Space*
- *CRE AHUs**
Controlled from CP022 or transfer switch panels
- LOT 202.37 EAB/CR HVAC*
- *
Where are the EAB HVAC AHUs physically located?
- Train A:*
- *EAB 21’ NE Corner**
- Train B:*
- *EAB 45’ NE Corner**
- Train C:*
- *EAB 72’ NE Corner**
- LOT 202.37 EAB/CR HVAC*
- *
How are the EAB HVAC supply and exhaust fans interlocked?
Exhaust fan will autostart if Supply fan started
Ensures EAB pressure higher than MAB pressure.
- Note:*
- CR HVAC fans have the same autostart feature. (Supply will start if return started)*
- LOT 202.37 EAB/CR HVAC*
- *
When would you use the EAB isolation switches?
Fire lasting longer than 30 mins
Located in stairwell on 21’, 35’, and 60’ elevations.
- LOT 202.37 EAB/CR HVAC*
- *
What components in the EAB/CR HVAC system start on a MODE I, II, or III on the ESF DG Sequencer OR on a High Rad?
- MODE I, II, III or High Rad:*
- *CR HVAC Cleanup**
- *CR HVAC Supply**
- *CR HVAC Return**
- MODE I, III, or High Rad: (No MODE II)*
- *CR HVAC Makeup**
- MODE I, II, or III:*
- *EAB AHUs**
- *Battery Room Exhaust Fan**
- *Penetration Space Emergency AHU**
- Pen Space*
- LOT 202.37 EAB/CR HVAC*
- *
What components in the EAB/CR HVAC system are cooled by TSC Chilled Water?
- *Penetration Space Normal AHU (1)**
- Pen Space*
- *Computer Room AHU (1)**
- LOT 202.37 EAB/CR HVAC*
- *
What pressure is the CRE maintained at?
+ 0.125 “ H2O
Maintained by having 2 supply fans running (2000 cfm) and 1 Kitchen/Toilet Exhaust fan running (1000 cfm)
- LOT 202.37 EAB/CR HVAC*
- *
During a DBA, what must control room personnel dose be limited to IAW 10CFR50?
≤ 5 Rem Whole Body
- LOT 202.37 EAB/CR HVAC*
- *
How much air flow is present in the following sections of the CR HVAC system?
- Supply Fan Discharge
- Recirculation Flow
- Cleanup Flow
- Makeup Flow
- Supply Fan Discharge:*
- *17400 cfm**
- Recirculation Flow:*
- *16400 cfm**
- Cleanup Flow:*
- *6000 cfm**
- 1000 cfm (Fan) + 5000 cfm (Recirc Flow)*
- Makeup Flow:*
- *1000 cfm**
- Maintained by discharge damper*
- LOT 202.37 EAB/CR HVAC*
- *
What areas are located in the CRE?
- *Control Room**
- *SM Room**
- *Relay Room**
- *Computer Room**
- *Kitchen / Men’s Toilet**
- *Women’s Toilet**
- *4 offices on 35’**
- *HVAC Rooms (10’ / 35’ / 60’)**
- LOT 202.37 EAB/CR HVAC*
- *
What is the required D/P across the CR HVAC Makeup and Cleanup filters?
- Cleanup:*
- *< 6.0” H2O**
- Makeup:*
- *< 6.1” H2O**
Note:
Located on CP022
- LOT 202.37 EAB/CR HVAC*
- *
Where are the CR HVAC components physically located?
- Train A:*
- *10’ EAB**
- Train B:*
- *35’ EAB**
- Train C:*
- *60’ EAB**
- Makeup AHUs:*
- *86’ EAB roof in key-carded room**
- Note:*
- All CR HVAC can be operated on CP022 but NOT RSR. (Do not need CR HVAC if MCR evacuated)*
- LOT 202.37 EAB/CR HVAC*
- *
What is the CR HVAC system response following an SI or High Rad?
- *Makeup Supply Damper Opens**
- *Makeup Fan Starts**
- *Makeup Discharge Damper Modulates to maintain 1000 cfm**
- FCV-9584/9585/9586*
- *Cleanup Fan Starts**
- *Supply Fan Starts**
- *Return Fan Starts**
- *Return Damper Opens**
- FV-9675/9676/9677*
- *Kitchen / Toilet exhaust fan Stops**
For an SI:
- EAB AHUs Start
- Battery Room Exhaust Fan Starts
- MAB HVAC Emergency AHU Starts
- Note:*
- Can be done manually on CP022*
- LOT 202.37 EAB/CR HVAC*
- *
What is the CR HVAC system response for a LOOP on Train C?
- *Makeup Supply Damper Opens**
- *Supply Fan Starts**
- *Return Fan Starts**
- *Cleanup Fan Starts**
- *Return Damper Opens**
- FV-9677*
Kitchen/Toilet Exhaust fan stays running because dampers powered by A/B.
- Note:*
- LOOP on A/B looks the same except Kitchen/Toilet fan secures b/c fan inlet dampers shut.*