At what pressure will the PORV (PCV-655A) lift when COMS is armed?
- 70 - 200 ˚F:*
- *515 psig**
- 220 - 380 ˚F:*
- *730 psig**
Uses Auct Low WR TH / PT-403
- Note:*
- Normal PORV setpoint is ≈ 2335 psig. (Master pressure controller 87.5%)*

- LOT 201.14 PZR Pressure & Level*
- *
How many RCPs are required for PZR Spray?
- *RCP 1A ONLY**
- *OR**
- *RCP 1D ONLY**
- *OR**
- *RCPs 1B AND 1C**
- LOT 201.14 PZR Pressure & Level*
- *
At what pressure will the PORV (PCV-656A) lift when COMS is armed?
- 70 - 200 ˚F:*
- *475 psig**
- 220 - 380 ˚F:*
- *660 psig**
Uses Auct Low WR TC / PT-404
- Note:*
- Normal PORV setpoint is 2335 psig. (B/U pressure channel)*

- LOT 201.14 PZR Pressure & Level*
- *
What Tavg is used to calculate PZR program level?
Auctioneered High Tavg
Compares selected controlling channel level (LT-465 or LT-467) to program level to determine demand to FCV-0205.
- LOT 201.14 PZR Pressure & Level*
- *
Which PZR level instruments are displayed on CP004?
- Hot Calibrated:*
- *LT-465 / LT-466 / LT-467**
- LT-468 only in ICS / QDPS*
- Cold Calibrated:*
- *LT-675**
- Calibrated to 140 ˚F*
Switch allows operator to select Cold Calibrated Level or Program Level.

- LOT 201.14 PZR Pressure & Level*
- *
What controls the opening of the PZR Spray Valves? (PCV-655B / PCV-655C)
- *Master Pressure Controller**
- Driven off controlling channel*

- Note:*
- Only odd numbered channels can be selected as the “controlling channel” to input to the master pressure controller. (455/457)*
- LOT 201.14 PZR Pressure & Level*
- *
Which PZR Pressure instrument does not tie into P-11?
PT-458
P-11: PZR Pressure ≥ 1985 psig [2/3]
- LOT 201.14 PZR Pressure & Level*
- *
What is the basis for the size of the PZR?
- Enough Water:*
- *Keep Heaters covered during step load increase of 10%**
- Enough Steam:*
- *Accomodate 50% load reduction w/o reaching PZR LVL - High (92%)**
- w/ Rods and Steam Dumps*
- *After PZR LVL - High (92%) Rx trip, will not lift safety valves**
- After Rx Trip AND Turbine Trip:*
- *No SI**
- *PZR will not empty**
- LOT 201.14 PZR Pressure & Level*
- *
What is the effect of indicated PZR level for the following conditions?
- Reference Leg Break
- Diaphragm Failure
- Reference Leg Heating
- Reference Leg Break:*
- *Less Mass → D/P ↓ → Lind↑**
- Diaphragm Failure:*
- *D/P ↓ → Lind↑**
- Reference Leg Heating:*
- *Less Mass → D/P ↓ → Lind↑**
- w/o compensation*
- LOT 201.14 PZR Pressure & Level*
- *
What is the bypass flow for the PZR spray valves?
2 gpm
Minimizes thermal shock when spray valve opens.
Note:
Each PZR spray valve provides 525 gpm
- LOT 201.14 PZR Pressure & Level*
- *
What controls the opening of the PORVS? (PCV-655A / PCV-656A)
- PCV-655A:*
- *Master Pressure Controller**
- 87.5% (≈ 2335 psig)*
- PCV-656A:*
- *Backup PZR Pressure Channel**
- 2335 psig*
- Note:*
- Only odd numbered channels can be selected as the “controlling channel” to input to the master pressure controller. (455/457)
- Only even numbered channels can be selected for backup control, and they only input to PCV-656A (456/458)
- Switch on CP004

- LOT 201.14 PZR Pressure & Level*
- *
At what pressure will the PZR PORV auto open signal blocked?
2185 psig
- PCV-655A (PT-458)
- PCV-656A (PT-457)
Tailpipe temperature for PORVs and Safeties on CP004. (PORV: TI-676 / Safeties: TI-677 - 679)
- LOT 201.14 PZR Pressure & Level*
- *
What are the important PZR Master pressure controller setpoints?
- PCV-655A:*
- *87.5%: Opens**
- *75%: Closes**
- Spray Valves:*
- *72%: Full Open**
- *40.5%: Start to Open**
- Control Heaters:*
- *34.5%: Zero Power**
- 22%: NOP*
- *15.5%: Full Power**
- B/U Heaters:*
- *14.5%: Turn Off**
- *9.5%: Turn On**

- LOT 201.14 PZR Pressure & Level*
- *
How many PZR heaters are there and what is the KW rating / heater?
117 Heaters
- *17.95 KW / Heater**
- 2101 KW Total*
LCO 3.4.3 PZR
Applicable MODES 1-3
- Requires 2 groups (A/B) w/ 175 KW each

- LOT 201.14 PZR Pressure & Level*
- *
What PZR Level deviation will automatically turn on PZR B/U Heaters?
- *+ 5% Level Deviation**
- Controlling Channel Level (LT-465/467) > 5% above Program Level*
Done to preheat PZR insurge.
- Note:*
- Charging flow at +5% Level Deviation: 50 gpm
- Charging flow at -5% Level Deviation: 300 gpm

- LOT 201.14 PZR Pressure & Level*
- *
When is COMS required to be armed?
≤ 350 ˚F
- PCV-655A (Auct Low WR TH / PT-403)
- PCV-656A (Auct Low WR TC / PT-404)
COMS controller completely independent of master pressure controller.
- Note:*
- Manually armed on CP004*
- LOT 201.14 PZR Pressure & Level*
- *
What is the PZR Program Level for 0% RTP and 100% RTP?
- 0% RTP (567 ˚F):*
- *25%**
- 100% RTP (593 ˚F):*
- *57%**
At actual 100% RTP (592 ˚F) PZR Level will be 55.7%.

- LOT 201.14 PZR Pressure & Level*
- *
While operating in MODE 1, what is your PZR Pressure DNB limit?
2200 psig

LCO 3.2.5 DNB Parameters
Applicable: MODE 1
- LOT 201.14 PZR Pressure & Level*
- *
At what PZR level will the heaters trip off?
- *17% [1/2]**
- LT-465/467 OR LT-466/467*

Backup heaters will turn back on if in auto once PZR LVL > 17%. [2/2]
- Note:*