AP-7 (Degraded condensor) Flashcards
AP-7
What are the different sections of Degraded Condenser?
A - loss of condenser vacuum
B - Condenser fouling
C - Traveling screen problem
What is the maximum condenser pressure allowed before the turbine will trip (AP-7, attch 2)
- full load - 10.2 “ hg abs
- 600 Mw - 7.2 “ hg abs
In AP-7, section A (loss vaccum), what are the Rx trip criteria?
- Pressure above limit (attch 2) and > P-9
- no CWP
- abnormal CWP amps (if only one pump on)
AP-7 (degraded condenser)
In section B (condenser fouling), what are the conditions that warrent ramping the unit to remove affected CWP from service?
- any D/P > 10 psid and rising rapidly
- all four D/P > 10 psid or approaching, with no change in ocean conditions
- any D/P approaching 13 psid
if dealing with a degraded condensor condition, what is the “caution” asscociated with securing a CWP?
the backflow from shutdown of an affected CWP could cause a large rise in loading on the screens of the CWPs still in service. Screens fro the least affected pumps should be in high speed prior to the CWP shutdown.
AP-7 (section C)
While in traveling screen problems what parameters will direct you to Trip Rx?
Screen d/p > 70 “
CWP amps not normal
additional conditions / actions
- Pwr > 25%
- trip CWP
- close MSIV’s
- adjust 10% stm dmps-> current P s/g