AP-20 (cond tube leak) Flashcards
1
Q
AP-20 (cond tube leak)
What are the Rx trip criteria while in AP-20?
A
Cond CatCon > 1.0 micro S/ cm (not in procedure if less)
and
FCV-230 open
OR
FW Cat Con > 0.25 micro S/ cm
OR
Cond CatCon > 200 micro S/ cm (after ramp -> 20%)
2
Q
What are the symtoms/ entry conditions for AP-20 (cond tube leak)?
A
- Chemistry reports OOS
- polisher reports indication of salt leak
- abnormal conductivity on PPC
3
Q
Per AP-20 (cond tube leak) att. 4.1, what are the ramp rates and correlating conductivities?
A
Cond CatCon ramp rate final pwr
1-4 5 mw/min 50%
4-15 5 mw/min 50%
15-150 25 mw/min 50%
150-200 50 mw/min s/d
200-…. 100 mw/min s/d