Aeronautical Information Publication Flashcards
Testing and run-ups of aircraft engines must, as far as possible, be avoided during the period of -
2000 and 0400
To comply with nouse abatement procedure 1, an aircraft should take-off and climb to 800ft AGL at what speed?
Climb at V2 + 10 knots
To comply with noise abatement procedure 1, from 800ft to 3000ft AGL an aircraft shall climb at what speed?
Climb at V2 + 10 to 20 knots
To comply with noise abatement procedure 1, from 800ft to 3000ft AGL an aircraft shall climb and maintain what configuration?
Maintain with flaps/slats in take-off configuration
To comply with noise abatement procedure 1, all aircraft at or below FL100 will fly a maximum speed of?
250 knots
To comply with nouse abatement procedure 2, an aircraft should take-off and climb to 800ft AGL at what speed?
V2 + 10 to 20 knots
Before selecting a new SSR code, the transponder should be set to?
Standby
All aerodrome within ? shall comply to the transition altitude of an aerodrome with such transition altitude.
25nm
The transition altitude for aircraft beyond 25nm of an aerodrome with a listed transition altitude, is?
2 000ft
No transition level shall be more than ? above the transition altitude within 25nm of an ATSU
1 000ft
The transition level for aircraft flying 25nm away from any of the aerodromes with:
A listed transition level, or other transition regulations. will be?
3 000ft AGL
An obstruction on an aerodrome chart, height above sea level is indicated?
At the top of the symbol
An obstruction on an aerodrome chart, height above ground level is indicated?
At the bottom
A VOR/DME is indicated by?
A VOR symbol within a square
In class F -
Advisory service will be provided