4 - Electrics Flashcards

1
Q
  1. (DSC-24-10) In normal electrical configuration, how is DC ESS bus supplied;

(a) From TR 1 via DC bus 1 and DC Bat Bus
(b) From ESS TR.
(c) From TR 2.
(d) From Batt 2.

A

(a) From TR 1 via DC bus 1 and DC Bat Bus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. (DSC-24-10) What happens in case of total loss of main generators;

(a) The Rat is automatically extended and powers the yellow system which drives the emergency generator.

(b) The Rat is automatically extended and powers the blue system which drives the emergency generator.

(c) The Rat has to be manually extended.

(d) The Rat is extended and mechanically connected to the emergency generator.

A

(b) The Rat is automatically extended and powers the blue system which drives the emergency generator.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. (DSC-24-10) the electrical power system consists of

(a) A three phase 115/200 volt 400 hertz constant frequency AC system and a 28 DC system

(b) A three phase 180/220 volt 400 hertz constant frequency system and a 28 volt DC system

(c) A three phase 115/220 volt 400 hertz constant frequency system and a 28 volt DC system
(d) A three phase 115/200 volt 400 hertz constant frequency DC system and a 28 volt AC system

A

(a) A three phase 115/200 volt 400 hertz constant frequency AC system and a 28 DC system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. (DSC-24-10) Dc Bat bus can be supplied by;

(a) DC Bus 1 or batteries.
(b) DC Bus 1, DC Bus 2 or batteries.
(c) DC Bus 2 or batteries.
(d) DC Bus 1 only.

A

(b) DC Bus 1, DC Bus 2 or batteries.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. (DSC-24-20/30) AC Bus tie contactors enable the electrical system;

(a) To be connected in parallel.
(b) To be supplied by any generator or external power.
(c) To be supplied by apu gen or external power only
(d) To be tied to external dc power.

A

(b) To be supplied by any generator or external power.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. (DSC-24-20/30) What happens during the emergency gen. test;

(a) The ram air turbine is extended.

(b) The blue system is pressurised and the emergency generator comes on line.

(c) The green system is pressurised and the emergency generator comes on line, supplied by hot bus 2.

(d) The emergency generator comes on line and the yellow system is pressurised.

A

(b) The blue system is pressurised and the emergency generator comes on line.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. (PRO-NOR-SOP-04) Normal minimum battery voltage before apu start is ;

(a) 22v.
(b) 25.5v.
(c) 27.5v.
(d) No Minimum.

A

(b) 25.5v.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  1. (DSC-24-20/30) When disconnecting the IDG the button should be pressed;

(a) For no more than 3 secs.
(b) For longer than 3 secs.
(c) Until the fault light goes out.
(d) For no more than 5secs.

A

(a) For no more than 3 secs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. (DSC-24-20/30) On the emergency electrical power panel, a fault light illuminates under the ‘ RAT and Emer.Gen.’ label. What does it mean ;

(a) Rat is not extended.

(b) Emergency generator is not supplying when AC bus 1 and 2 are not powered or Dc Bat bus is not powered.

(c) Emergency generator is supplying but AC Ess bus is not powered.

(d) Emergency generator is not supplying when AC Bus 1 and 2 are not powered.

A

(d) Emergency generator is not supplying when AC Bus 1 and 2 are not powered

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  1. (DSC-24-20/30) What happens when the Gen 1 line Pb. is set to off;

(a) AC Bus one and 2 are not powered and emergency generator is automatically connected.

(b) AC Bus 1 is powered by the gen. 2 because the gen 1 is deactivated.

(c) AC Bus 1 is powered by the gen.2 because the gen.1 line contactor is opened.

(d) AC Bus 1 is not powered because the gen. 1 line contactor is opened and transfer contactor is not closed.

A

(c) AC Bus 1 is powered by the gen.2 because the gen.1 line contactor is opened.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

11 (DSC-24-20/30) Where can the battery voltage be checked;

(a) On the ECAM elec page only
(b) On the elec overhead panel and the ECAM elec page
(c) On the elec overhead panel and the ECAM E/WD
(d) On the elec overhead panel only

A

(b) On the elec overhead panel and the ECAM elec page

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. (DSC-24-10) AC essential bus is normally supplied by;

(a) AC Bus 1.
(b) AC Bus 2.
(c) Static inverter.
(d) Emer. gen.

A

(a) AC Bus 1.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  1. (DSC-24-10) In flight on batteries only, the AC Ess Shed bus and DC Ess Shed bus are lost;

(a) Yes.
(b) No.
(c) Only A/C Ess Shed Bus is lost.
(d) Only D/C Ess Shed Bus is lost.

A

(a) Yes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  1. (DSC-24-10)The static inverter works;

(a) Always.
(b) When A/C speed is > 50kts and on batteries only.
(c) When one main generator fails.
(d) Only when gen. 2 fails.

A

(b) When A/C speed is > 50kts and on batteries only.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  1. (DSC-24-20/30) On ground what happens if the RAT and Emer. Gen. Man On Pb. Is pressed

(a) The Rat is extended.
(b) The emergency generator is activated.
(c) Nothing.
(d) The blue hydraulic system is pressurised and this causes the RAT to extend and rotate.

A

(a) The Rat is extended.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  1. (DSC-24-10)The static inverter transforms the DC voltage from the battery bus into;

(a) Single phase 115v - 400 Hz. A/C current.
(b) Three phase 115/200v - 400hz. A/C current.
(c) 28v D/C current.
(d) 25.5v D/C current.

A

(a) Single phase 115v - 400 Hz. A/C current.

17
Q
  1. (DSC-24-10) In flight in case of loss of all main generators, emergency generator not yet running (batteries only), the static inverter supplies ;

(a) A/C Ess bus and Engine Ignition A
(b) Eng Ignition & A/C Ess Bus & A/C Ess Shed Bus
(c) Eng Ignition Only.
(d) Hot bus 1.

A

(a) A/C Ess bus and Engine Ignition A

18
Q
  1. (DSC-24-20/30) The external power has priority over the Apu. gen.;

(a) Yes.
(b) No.
(c) Only in flight.
(d) No, Apu. gen. has priority over external power always.

A

(a) Yes.

19
Q
  1. (DSC-24-10) Gen 1 and Gen 2 when operating have priority over the Apu gen;
    (a) Yes.
    (b) No.
    (c) Only in flight.
    (d) Only on the ground.
A

(a) Yes

20
Q
  1. (DSC-24-10) With Apu gen. available, if one main generator fails, the failed generator is replaced by;

(a) The Apu.
(b) The other computer.
(c) Bus tie takes place and the remaining main generator supplies both channels.
(d) The RAT.

A

(a) The Apu.

21
Q
  1. (DSC-24-10) If a TR fails;

(a) The other TR automatically replaces the faulty one & the Ess TR supplies the DC Ess Bus.

(b) The Static inverter replaces the faulty TR.

(c) The DC Bus on the faulty side is lost.

(d) The Emergency generator supplies DC power on the faulty side.

A

(a) The other TR automatically replaces the faulty one & the Ess TR supplies the DC Ess Bus.

22
Q
  1. (DSC-24-10) In flight in case of loss of all main generators, emergency generator not running, the DC Ess Bus is supplied by;

(a) Hot bus 2.
(b) Ess TR.
(c) Both.
(d) Hot Bus 1.

A

(a) Hot bus 2.

23
Q
  1. (DSC-24-10) In flight in case of loss of all main generators, emergency generator running , the DC Ess Bus is supplied by the;

(a) Hot bus.
(b) Ess TR.
(c) Both.
(d) DC Bat bus.

A

(b) Ess TR.

24
Q
  1. (DSC-24-10) The IDG regulates the …….. of the generator;

(a) Speed.
(b) Voltage.
(c) Frequency.
(d) GLC (generator line contactor)

A

(a) Speed.

25
Q
  1. (DSC-24-20/30) When switched to ALTN the AC Ess Feed p/b causes the AC Ess Bus to be;

(a) Supplied from AC bus 1
(b) Supplied from AC bus 2
(c) Supplied from DC bus 1
(d) Supplied from DC bus 2

A

(b) Supplied from AC bus 2

26
Q
  1. (DSC-24-10) If AC bus 1 fails the AC Ess bus is supplied by;

(a) Emer Gen.
(b) AC Bus 2.
(c) Static inverter.
(d) The RAT.

A

(b) AC Bus 2.

27
Q
  1. (DSC-24-10) In case of total electrical loss the AC Ess bus is supplied by;

(a) Static inverter.
(b) Emer Gen.
(c) Both.
(d) TR 1.

A

(a) Static inverter.

28
Q
  1. (DSC-24-10) In Emergency configuration, AC Ess shed bus is automatically shed;

(a) If the RAT stalls or aircraft is on ground with speed<100kts

(b) When the landing gear is down.

(c) When in emergency configuration

(d) When AC Bus 1 is lost

A

(a) If the RAT stalls or aircraft is on ground with speed<100kts

29
Q
  1. (DSC-24-10) If one main generator fails in flight (and the APU generator is not being used)

(a) Part of the galley load is automatically shed

(b) All galley load is automatically shed once the APU generator becomes
available.

(c) All galleys are shed.

(d) Galleys are not shed.

A

(a) Part of the galley load is automatically shed

30
Q
  1. (DSC-24-20/30) Can you reconnect the IDG in flight;

(a) Yes.
(b) No.
(c) No. 1 idg only.
(d) No. 2 idg only.

A

(b) No.

31
Q
  1. (DSC-24-20/30) When Gen. 1 or Gen. 2 is selected to off;

(a) The Generator field is de-energised and the line contactor is open.
(b) The Generator is still energised and line contactor is open.
(c) Cannot select off in flight.
(d) Can only be reset on ground.

A

(a) The Generator field is de-energised and the line contactor is open.

32
Q
  1. (DSC-24-20/30) When the EXT Pwr Pb green avail is illuminated;

(a) The external power is connected to the a/c.
(b) The A/C network is supplied.
(c) Ground services are supplied.
(d) D/C network supplied.

A

(a) The external power is connected to the a/c.

33
Q
  1. (DSC-24-10) Emergency generation, the D/C bat bus is automatically connected to the batteries:

(a) below ‘s’ speed
(b) below green dot speed
(c) below 50kts
(d) below 100 kts

A

(d) below 100 kts

34
Q
  1. (PRO-NOR-SOP-04) When you want to check battery voltage, you must set the Bat Pb to:

(a) Auto position.
(b) Off position.
(c) Norm position.
(d) On position.

A

(b) Off position.

35
Q
  1. (DSC-24-20/30) The Bat fault light illuminates when;

(a) Battery voltage < 25v.
(b) Battery Pb switch is at off in flight.
(c) Charging current increases at an abnormal rate.
(d) Charging current is low.

A

(c) Charging current increases at an abnormal rate.

36
Q
  1. (DSC-24-10) In certain cases the static inverter is supplied by;

(a) Hot bus 1 and Hot bus 2.
(b) Hot bus 1.
(c) D/C Bat bus.
(d) A/C Ess bus.

A

(b) Hot bus 1.