Trench Rescue - trenches with vertical walls greater than _ feet (_ meters) require appropriate slopping and/or shoring prior to entry.
4’/1.2m
Trench Rescue - What is “an excavation where the depth exceeds the width?”
Trench
Trench Rescue - at least _ technical rescue level trained FF’(s) must be included in the response to any given technical emergency
1
Trench Rescue - Minimum trench rescue response assignment that will be dispatched includes what trucks?
- P114, S114, P109, SV101, TR101, one additional apparatus, DC
Trench Rescue - additional apparatus shall stage at least _ m back from the trench?
90m
Trench Rescue - a minimum of _ practical trench scenarios per year will be run for each trench rescue team?
1
*2 trench rescue STI’s per shift minimum