Specific Threat BUILDING SOG Flashcards
What is a Specific Threat with PTI?
A verbal bomb threat made in-person by a suspect, reported by air carrier personnel
What qualifies as a Specific Bomb Threat to a building?
A threat with at least one element of specificity such as building name and location
What is Signal 55A?
A specific bomb threat with PTI
What is Signal 55?
A bomb has exploded
What defines a Non-specific Bomb Threat?
A threat that fails to meet the criteria of a specific bomb threat
What is considered a Suspicious Object or Luggage?
Unidentified, unattended item that causes concern
What ARFF units respond to a specific threat to a building?
An Engine or Tower, a Rescue, and District-8
How far must ARFF units stage from the target building?
At least 1,200 feet, as assigned by D-8
Who decides if ARFF can operate within the 1200 ft safe zone?
District-8 (D-8)
Who establishes Unified Command in building bomb threats?
Airfield or Landside Operations and OPD
What is ARFF’s role during building bomb threats?
Support and rescue
Can ARFF approach the target building freely?
No, only if directed by D-8
What happens if a device detonates during a building bomb threat?
ARFF assists OPD in ensuring safety and mitigating the situation