MT6316 CHAPTER VIII Flashcards
What is necessary to ensure accurate, reliable and timely testing?
Equipment Management
Benefits of Good Equipment Management include?
- high level of laboratory performance
- reduces variation in test results and improves the technologist’s confidence in the accuracy of testing results
- lower repair costs
- lengthens instrument life
- reduces interruption of services due to breakdowns and failures
- increases safety for workers
- greater customer satisfaction
Program Considerations for Equipment Management?
- Selection and purchasing
- Installation
- Calibration and performance evaluation
- Maintenance
- Troubleshooting
- Service and repair
- Retiring and disposing of equipment
Criteria to consider in Selecting equipment?
- matched against the service the laboratory provides
- performance characteristics of the instrument
- sufficiently accurate and reproducible to suit the needs of the testing to be done
- facility requirements
- cost
- reagent availability
- staff operation
- instruction availability
- equipment retailer
- warranties
- safety issues
Things to consider in acquiring equipment?
- purchasing or leasing
- factor in repair costs
- manufacturer should provide all of the necessary information to operate and maintain equipment
- savings that could be negotiated if the laboratory needs more than one piece of equipment
LEASE OR RENTAL PLANS: periodic payments are made without purchase option
RENTAL
LEASE OR RENTAL PLANS: the equipment is returned
RENTAL
LEASE OR RENTAL PLANS: agreed or metered
RENTAL
LEASE OR RENTAL PLANS: periodic payments are made
LEASE
In lease plans, how far apart are the periodic payments?
3-5 years
LEASE OR RENTAL PLANS: purchased for longer periods at reduced rate.
LEASE
In acquiring equipment, is it best to ask about what before purchasing?
- wiring diagrams, computer software information, a list of parts needed, and an operator’s manual are provided
- the manufacturer will install the equipment and train staff (covering travel expenses as necessary) as part of the purchase price
- the warranty includes a trial period to verify that the instrument performs as expected
- the manufacturer’s maintenance can be included in the contract and, whether maintenance is provided on a regular basis
Acquisition of new equipment justifications?
Replacement
Increased workload
Cost reduction
New and / or improved methodology
equipment can not be repaired or excessive cost of repair results in unacceptable delays
Replacement
volume increase justifies either automation or additional personnel
Increased workload
reduction of operational expenses state primarily in terms of personnel and supplies
Cost of reduction
better patient care
New and / or improved methodology
Priority of needs in equipment management?
1.Essential
2.Necessary
3.Desirable
4.Others
Needed immediately to maintain quality patient care
Essential priority
As “essential” but greater leeway with regard to time of acquisition
Necessary priority
Means of reducing cost
Desirable priority
Means of improving general working condition
Others priority
Act of verifying is all physical requirements have ben met
Installing equipment
Consideration in installing equipment?
vendor’s responsibilities for installation should be confirmed in writing prior to beginning the installation process
What should be developed in installing the equipment?
checklist of the expected performance specifications, so that performance can be quickly verified as soon as the equipment is installed
In getting the equipment ready for use, assign responsibility for?
performing the maintenance and operation programs.
What is assigned to perform the maintenance and operation programs? (Getting equipment ready for use)
Responsibility
Develop a _________ for recording the use of parts and supplies.
system
What should be implemented in the process of getting the equipment ready for use?
a written plan for calibration, performance verification, and proper operation of the equipment.
What should be scheduled in the readying of equipment for use?
scheduled maintenance program that includes daily, weekly and monthly maintenance tasks.
In getting the equipment ready for use, provide what to a all operators?
training
Who should be the only ones authorized as operators?
only personnel who have been trained specifically to properly use the equipment
Follow the manufacturer’s directions carefully when performing the?
initial calibration of the instrument.
Calibrate the instrument ________, when ____________.
with each test run
first putting it into service
Determine ____________, based on its stability and the manufacturer’s recommendation.
how often the instrument will need to be recalibrated
Prior to testing patient specimens, it is important to evaluate the performance of _____________ to ensure it is working correctly with respect to _______________.
new equipment
accuracy and precision.
____________ using __________________ need to be evaluated for the ability to detect ________________ and to determine ______________________.
Test methods
kits or laboratory instruments
disease (sensitivity, specificity, positive and negative predictive value)
normal and reportable ranges.
One of the pressing issues that DOH is regulating in relation to the COVID-19 crisis is?
opening new molecular testing labs with new equipment (or equipment not validated for diagnostic use) and using unvalidated testing kits.
Manufacturers provide _______________ for testing methods using their kits or instruments, and include the information in the package inserts or operator’s manuals
performance evaluations
Manufacturers provide performance evaluations for what using what?
testing methods using their kits or instruments, and include the information in the package inserts or operator’s manuals
Laboratories need to verify the ________________, and demonstrate they can get the same results using the kits or equipment in their laboratory, with their personnel.
manufacturer’s performance claims
Verification of manufacturers’ performance claims includes?
- testing samples with known values and comparing the results to the expected or certified value
- if equipment is temperature controlled, establishing the stability and uniformity of the temperature
What can be carried out by running samples in parallel using both old and new equipment and methods for a period of time to determine that the expected results can be obtained?
Validation
Validation can be carried out by?
running samples in parallel using both old and new equipment and methods for a period of time to determine that the expected results can be obtained.
A maintenance plan should include?
- preventive maintenance
- provision for inventory
- troubleshooting
- repair of equipment
Implementing an equipment maintenance program includes?
A. Preventive Maintenance
B. Repair
C. Calibration
Comes before a failure, while the equipment is in operating condition
A. Preventive Maintenance
Applies to unscheduled maintenance
B. Repair
Comes after the instrument has failed
B. Repair
Assurance that the instrument measures certain parameters within specified tolerance
C. Calibration
Considered part of preventive maintenance
C. Calibration
Initial steps in implementing equipment maintenance program include?
- assigning responsibility for providing oversight
- developing written policies and procedures for maintaining equipment, routine maintenance plans for each equipment that specify the frequency maintenance tasks should be performed
- developing records, creating logs and forms, and establishing the processes to maintain records
- training staff on the use and maintenance of the equipment, ensuring that all staff understand their specific responsibilities
Preventive maintenance includes measures such as?
systematic and routine cleaning, adjustment and replacement of equipment parts at scheduled intervals