IV F Equipment & facility planning Flashcards
what is a prospectus?***
planning guide- formal summary of proposed work
what is human engineering?***
- ergonomics, environmental design
- studies activities so they are done safely & efficiently
(ex: good work flow, noise control, easy entrance/exit, etc.)
who gives the final approval for planning of a FS facility?
administrator
feasibility study
research and data analysis to justify project
the space required in a FS facility is determined by?**
“MARKET FORM” of foods purchased (raw, prepared, partially prepared, etc.)
what determines the space and equipment needed?***
MENU
glazed tiles should be how high?***
5’8”
ceilings should be how high?***
14-18’ high
which should be darker in color- walls or ceilings?
ceilings
floors should be…?***
durable, resilient, non-slippery
concrete floors
light traffic, absorbs grease, use in storerooms, receiving areas
terrazzo
cement and crushed marble; noisy, dining room
what floors are recommended for the kitchen and heavy traffic?**
TILE: unglazed red clay tiles or quarry tiles
asphalt floors should be used for?
light traffic, dining room
ventilation, temperature should be?***
68F
what are foot candles?
light intensity
what type of lighting should be used in general areas? number?***
general lighting, 35-70 foot candles
what # lighting should be used in localized work areas?***
70-150 foot candles
what is a flow chart?***
show steps the work must take, their sequence, the relation of working units to each other
a flow chart is completed at what stage of FS design?***
PLANNING
a typical foodservice flowchart design has what features?
little cross traffic, no backtracking
what are templates?***
models of equipment cut to scale used in layouts
cafeteria #s to look over —>
- 18” between chairs, tables 4-5 feet apart
- serving width of 14 feet: 4’ patron lane, 1’ tray slide, 2’ counter width, 4.5’ workers, 2.5’ back-bar
employee dining is how much space per person?
12 square feet