Chp 23 Facility Design, Layout, and Organization Flashcards
Predesign phase should consist of a _____, a _____, and a _____.
Usually requires _____ of the total project time. (_____ months)
needs analysis, master plan, feasibility study
25%; 6
Design phase may require _____ of the total project time (~_____ months).
10-12%; 3
Construction phase normally requires _____ of total project time (about _____ months).
50%; 12
Preparation phase is also called _____ phase and requires about _____ of total project time (_____ months).
start-up; 15%; 3-4
The load-bearing capacity should be at least _____ lbs per square foot if not located on the ground floor.
100
Should be accessible to people with disabilities, with either a ramp or a wheelchair lit, a ramp should run _____ inches for every 1-inch rise
12
ceiling height
12-14 feet
1 feet = _____ cm
30.48
Lighting should be between _____ and _____ lumens
50; 100
temperature: between _____ and _____ F
_____ and _____ C
68 - 78
20 - 25
Relative humidity
should not exceed 60%
Circulation: _____ to _____ times per hour
8; 12
_____ to _____ fans every 1200 square feet
2; 4
sound should be less than _____ decibels
90
Mirrors should be placed at least _____ inches (_____ cm) away from any equipment and a minimum of _____ inches (_____ cm) above the floor.
6; 15
20; 51