Chapter 3 stuff Flashcards
What is the priority order for the use of PPV:
Pressurizing he attack stairwell Pressurizing the evacuation stairwell Venting the Public hallways for smoke and CO
Timber is wood construction larger than
2x4 but not large enough to be considered heavy time or mill construction. Dunn Brkdwn pg 41
Mill lofts construction feature, wooden columns are how large?
6 – 10 inches in diameter and topped with iron caps. Lofts 5.3.2
Square columns in lofts are used where?
On lower floors and are 20% stronger than round ones of equal dimension. Lofts 5.3.2
Some Mill “hybrid” buildings have what type of columns?
Protected cast-iron columns
Timber Truss Roof can be built in what shapes?
Inclined Plan truss (Gable shape) Parallel Chord Truss (Flat) Bowstring Truss – most common
When is the command channel implemented?
10-60 10-66 10-76 3rd alarm or greater 10-77 and more than one sector is established. {On a regular 77, only one sector is established, the Fire Sector.} Complex Operations as per the IC Comm Man 11 7.3.2
When are Command Channel training drills held?
May and November. At 2nd alarms, all large scale drills and discussed at Division Conferences.
Tactical Supervisors that operate on the Tactical Channel are: Comm. Man 11 7.3.5.B
Sector Supervisors and or Branch Director (DC) Fire Floor, Floor Above, Roof Sector, Exposure Sectors, Group Supervisors, Search and Rescue Group Supervisor, Collapse Group Supervisor Safety Officer, Resource Unit Leader
Which Chiefs operate on the Command Channel?
Officers assigned to Planning Chief, Staging Area Manager, Air Recon
No member shall operate on other than the primary Tactical Channel with authorization of?
The IC or the Resource Unit Leader.
When does the Hi Rise Unit respond?
Any second alarm in conjunction with a 10-77. 10-76 and greater Any underground subway incident that is a 7-5 or greater. Special called
Who authorizes Agency data code 9111?
The Chief of Operations, Used for preparedness work, or emergency response. 4Q Update, AUC 159, Add 5, 1.11
When the Fire Saftey Director is not present, and there is less than 100 above/below and less than 500 people in entire bldg, who is that person?
Building Evacuation Supervisor (Glossary)
Regarding plenums, core construction and fire towers for pre 1945 Hi-Rise:
Plenums generally not found Core construction NOT used 38 – 68 All bldgs required to have fire tower. Some prior to 38 have fire tower