How shall power removal be complete when dealing with 12,000kv catenary wires? (2.1)
Have a Class “A” employee, a.k.a. “A-Man” ground the catenary wires to eliminate residual electricity.
What else may the “A-Man” use to detect whether the power has been removed from the catenary wires? (2.6)
A voltage detecting device. It will detect is the power source has been removed, but it will not detect residual static current.
It may take some time before you will get an Amtrak employee on scene to ground the train. In the mean time a fire could grow to larger proportions. What level of power removal must be achieved before water may be used? (3.1)
480 volt stand-by power, 3rd rail and catenary lines must be shut down. Only then, may a fog line be used.
How shall the fog line be operated? (3.2.1)
Fog pattern, from the platform, into the train avoiding any contact with overhead wires and the pantograph connection.
If conditions warrant, a handline using a fog stream can be used from the adjacent platform directing water at the train’s undercarriage thus controlling the fire and keeping the diesel tanks cool.
What distance must be maintained between the nozzle and the electrical components? (3.2.4)
NFPA says 4 feet.