what should be done during the predesign phase
needs analysis, feasibility study, master plan, hire architect
what should be completed during the pre-operation phase?
hire staff, complete aesthetics
how loud should music be in a studio?
less than 90 decibels
how wide should walkways be at the least?
36 inches
how wide should walkways be for circuit training?
4-7 feet
how high should mirror be at a minimum above the floor?
20 inches
how far should mirrors be placed from equipment at the least?
6 inches
how much open space should a gym have at the least so that athletes can perform a dynamic warm up?
49 square feet
what is the minimum recommended space between the ends of racks to provide room for spotters?
3 feet
facility rules and regulations
policies
describe how policies are met and carried out
procedures
the process by which a procedure or activity is described to a participant with an explanation of the inherent risks and benefits involved
informed consent
legal responsibility, duty or obligation
liability
what a reasonable and prudent person would do under similar cirucmstances
standard of care
failure to act as a reasonable and prudent person would under similar circumstances
negligence
athletes should sign a statement before preforming an activity that involves risk to ensure what?
assumption of risk
what does every strength and conditioning professional require in order to protect themselves?
liability insurance
document detailing the proper procedures for caring for injuries
emergency action plan
what is the ideal coach to participant ratio during peak weight room usage time in a collegiate setting?
1:20