what should be done during the predesign phase
needs analysis, feasibility study, master plan, hire architect
what should be completed during the pre-operation phase?
hire staff, complete aesthetics
how loud should music be in a studio?
less than 90 decibels
how wide should walkways be at the least?
36 inches
how wide should walkways be for circuit training?
4-7 feet
how high should mirror be at a minimum above the floor?
20 inches
how far should mirrors be placed from equipment at the least?
6 inches
how much open space should a gym have at the least so that athletes can perform a dynamic warm up?
49 square feet
what is the minimum recommended space between the ends of racks to provide room for spotters?
3 feet
facility rules and regulations
policies
describe how policies are met and carried out
procedures
the process by which a procedure or activity is described to a participant with an explanation of the inherent risks and benefits involved
informed consent
legal responsibility, duty or obligation
liability
what a reasonable and prudent person would do under similar cirucmstances
standard of care
failure to act as a reasonable and prudent person would under similar circumstances
negligence