Building Analysis Functional Requirements Flashcards
FAR, BUILDING EFFICIENCY
Typical Efficiency Ratio’s of Building
(Tbl 10.3
Offices: 0.75 - 0.85 Retail offices: 0.75 - 0.9 Resturants: 0.65 - 0.75 Public libraries: 0.60 - 0.75 Museums: 0.60 - 0.75 Hospitals: 0.50 - 0.65
Space requirements for estimated non-assigned spaces
Fan Rooms 3-7%
Heat, Boilings Rms 3-5%
Heating forced air 4 -8%
Mechanical Rooms 5-9%
Efficiency Formula of a building
Eff. = net area/gross area
Net Floor Area
- Commonly used spaces also named as “Assignable areas”
- Measured inside walls
- Main function/ or mainly used rooms
DOES NOT INCLUDE: Circulation stairways Elevators General service areas Corridors, Lobbies Restrooms Custodial rooms Mechanical Spaces Electrical and telephone equipment rooms Wall and structural thicknesses (Kaplan, ppp, 33) (Ballast, 10-14)
Gross Floor Area
Assignable and non-assignable areas Measured to the exterior face of perimeter walls including all interior walls, columns, and shafts -Includes: Circulation General service areas Corridors, Lobbies Restrooms Custodial rooms Mechanical Spaces
- Includes patios, decks, other usable open areas that are enclosed on 3+sides and a solid roof
- SF IS doubled with a ceiling height of 15’ or more (not including stairways with no habitable space above/below
- Includes any covered areas on/below the first or main floor when the average height is more than 6’ 0”
(Kaplan, PPP, 33) (Ballast, 10-14)
Least efficient space type (based on table 10.3)
Hospital 0.50 - 0.65 eff ratio
Most efficient
Overall places of buisness, factories, open warehouses, etc.
Offices efficiency ratio (based on table 10.3)
0.75 - 0.85
Resturant efficiency ((based on table 10.3)
0.65 - 0.7
Public libraries efficiency (based on table 10.3)
0.75 - 0.8
Museums efficiency (based on table 10.3)
0.83 - 0.90
Theaters efficiency (based on table 10.3)
0.60-.75
FAR (Floor Area Ratio)
Gross Area/ Site Area
Building efficiency
Buildign Eff. = Net Area/ grosss area