CPM (Critical Path Method)

A

Critical Path Method in planning phases in which a diagram is drawn indicating the order in which various operations comprising the project are to be accomplished.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Float

A

The float is the path is in the network diagram other than the critical path
The float is the difference in the time duration between the critical path and any other path.