8 Project Quality Management Flashcards
What is the purpose of PQM?
PQM works to ensure that the project requirements including product requirements are met and validated. It includes the processes and activities of the performing organization that determine quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken
What is plan quality management process?
Pocess of identifying quality requirements and standards for the project and its deliverables and documenting how the project will demonstrate compliance with those standards
What is Perform Quality Assurance ?
Process of auditing the quality requirements and the results from quality control measurements to ensure that appropriate quality standatds and operational definitions are used
What is Control Quality?
Process of monitoring and recording the results of quality activities to assess performance and recommend changes
difference between grade and quality
Grade - as a design intent is a category assigned to deliverables having the same functional use but different technical characteristics
Quality of a delivered performance/result - degree to which inherent characteristics fulfill requirements
Difference between Precision and Accuracy
Precision - measure of exactness
Accuracy - measure of correctness