Volume 11: Chapter 10, Section 3 (Collapsed Structure – Terrorist) Flashcards

1
Q

The collapse zone can be as much as _______ of the building height

A

1 ½ times

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The 1st arriving company will do (3)

A
  • size, up
  • pass command
  • establish exclusion and SRA zones
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The 2nd arriving company will______

A

assume command

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The 1st and 2nd engine companies will get hydrants be 1 block out at the _______ of the building

A

Front

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The 3rd and 4th engine companies will get hydrants be 1 block out at the _______ of the building

A

Rear

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The highest priority is to extinguish_______

A

fires in the rubble

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The 1st truck companies will be located at the _______ of the building

A

Front

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The 2nd truck companies will be located at the _______ of the building

A

Rear

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

USAR and Hazmat companies should be placed at the ______ of the collapse

A

Front

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

___________ occurs when one of the supporting walls or floor joists breaks at one end making large void spaces

A

Lean-To Floor Collapse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

___________ occurs when one end of the floor or wall is still attached to the wall and the other hangs unsupported

A

Lean-To Cantilever Collapse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

__________ occurs when heavy loads cause the floor to fail at the center

A

V-Shaped Collapse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

In a V shape collapse victim above the break will be found

A

at the bottom of the V

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

In a V shape collapse victim below the break will be found

A

in the void spaces on either side of the V

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

__________ occurs when the upper floors collapse

A

Pancake collapse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

_________ occurs when the floor beams on outside floors collapse but the interior bearing walls are in tact making a A frame

A

Tent or A-Frame collapse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

_________ occurs when one or more walls, intact, fall over like a tree

A

90 deg. collapse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

_________ occurs when brick or stone walls made of brick collapse

A

Curtain Fall

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

_________ occurs when entire buildings fall over sideways

A

Overturn

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Stage 1 of Collapse Search and Rescue_______

A
  • Response
  • arrival
  • recon (first responder skills)
21
Q

Stage 2 of Collapse Search and Rescue_______

A

Surface Rescue

22
Q

Canine search is used during Stage ____

A

2

23
Q

Stage 3 of Collapse Search and Rescue______

A

Voice Space Search and Rescue

24
Q

Exploration of survivable void spaces occurs in Stage ___

A

3

25
Q

Paramedics treat victims while they are being extracted during Stage ____

A

3

26
Q

The IC shall ensure RIC is present during Stage _____

A

3

27
Q

Stage 4 of Collapse Search and Rescue______

A

Select debris removal

28
Q

Stage 5 of Collapse Search and Rescue______

A

General debris removal

29
Q

In many cases Stage 5 has been reached in ______

A

15-20 days

30
Q

________ construction is typically light skeletal with wood or steel framing

A

Lite Frame

31
Q

________ construction typically has a cast in place slab with heavy wood or steel beams

A

Heavy Floor

32
Q

_______ construction is usually built without a skeletal structural frame

A

Heavy Wall

33
Q

_______ construction usually uses pre-cast components

A

Pre-Cast

34
Q

Collapse structure markings are a _________

A

2 x 2 X

35
Q

Left Quadrant____

A

Unit ID

36
Q

Top Quadrant____

A

Date and Time LEFT the building

37
Q

Right Quadrant____

A

Hazards

38
Q

Bottom Quadrant _____

A

Alive and dead victims

39
Q

One slash is drawn upon ______

A

entry

40
Q

The second slash is drawn upon ______

A

exit

41
Q

The markings are made at the ______

A

point of entry

42
Q

A large ______ is drawn near the point of potential victims

A

V

43
Q

A circle around the V indicates

A

victim confirmed

44
Q

A circle around the V with a line thru middle means _____

A

Confirmed dead

45
Q

A circle around the V with a cross indicates _______

A

dead victim removed

46
Q

For structure triage markings make a ________

A

2 x 2 square

47
Q

An empty square indicates_______

A

OK for search and rescue

48
Q

A square with a diagonal line indicates_____

A

significantly damaged

49
Q

A square with an X indicates________

A

Unsafe