QUIZ: Balancing Area & Operations - Manual 12 Flashcards
1
Q
- PJM is one of the Balancing Areas in the Eastern Interconnection.
a. True
b. False
A
a. True
2
Q
- What device responds to minute-to-minute changes in load?
a. MVARs
b. SVCs
c. Governors
d. Synchronous Condensers
A
c. Governors
3
Q
- The rule of thumb is that approximately 1-2% load change for a?
a. 3% change in frequency
b. 5% change in frequency
c. 1% change in frequency
d. 10% change in frequency
A
c. 1% change in frequency
4
Q
- When a BA is under generating, it means?
a. Total generation = Load
b. Total generation < the total load
c. Load = Loss
d. Total generation > the total load
A
b. Total generation < the total load
5
Q
- ACE stands for which of the following?
a. Area Control Error
b. Area Constant Error
c. Actual Constant Error
d. Actual Control Error
A
a. Area Control Error
6
Q
- There are 3 basic types of Interchange. Which of the following is NOT?
a. Actual
b. Fictional
c. Inadvertent
d. Scheduled
A
b. Fictional
7
Q
- Electric clocks operate on the assumption that frequency is how many Hz?
a. 60.00Hz
b. 59.95Hz
c. 61.00Hz
d. 45Hz
A
a. 60.00Hz
8
Q
- Which of the following is not a NERC Control Standard?
a. CPS4
b. CPS2
c. DCS
d. CPS1
A
a. CPS4
9
Q
- A Balancing Area is defined as?
a. Mechanical system bounded by telemetry
b. Electrical system bounded by Interconnection metering and telemetry
c. None of the above
d. Mechanical system bounded by metering
A
b. Electrical system bounded by Interconnection metering and telemetry
10
Q
- The Interconnections, including the Western, Eastern, ERCOT, and Quebec are tied together through the use of what?
a. Underground ties
b. High voltage DC ties
c. Low voltage cables
d. Low voltage DC ties
A
b. High voltage DC ties
11
Q
- A bilateral inadvertent payback is an arrangement made between two BA’s
a. True
b. False
A
a. True
12
Q
- Inadvertent interchange is the difference between?
a. Supplemental and Overlap
b. Actual and Scheduled Interchange
c. Voltage and Phase Angle
d. MWs and MVARs
A
b. Actual and Scheduled Interchange
13
Q
- A BA must meet its instantaneous demand, Interchange schedules, operating reserves, and reactive resource requirements?
a. True
b. False
A
a. True
14
Q
- The RC has issued a time error correction. What is the correct time it may start?
a. 12:15
b. 12:10
c. 12:25
d. 12:00
A
d. 12:00
15
Q
- When a BA is over generating, it means?
a. Total Generation = Load
b. Total Generation < the Total Load
c. Load = Loss
d. Total Generation > the Total Load
A
d. Total Generation > the Total Load