EXAM: Sample Exam (from PJM website) Flashcards

1
Q
Real time transmission constraints or contingencies may be alleviated with generators operating
A. below 60 Hz.
B. on a new price curve.
C. on a new cost curve.
D. off cost (out of merit).
A

D. off cost (out of merit).

PJM Balancing Operations Manual M-12; Attachment B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
What is the minimum size for a solar park to be required to have real and reactive power
telemetry?
A. 1 MW.
B. 3 MW
C. 5 MW
D. 7 MW
A

B. 3 MW

PJM Generator Operational Requirements Manual 14D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
PJM calls for which of the following to recover the ACE so that tie line schedules are maintained?
A. instantaneous reserve check
B. synchronized reserves
C. supplemental status report
D. minimum generation calculation
A

B. synchronized reserves

PJM Balancing Operations Manual M-12

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

If not cancelled by PJM, the minimum generation alert expires
A. at the end of the specified light load period.
B. when notified by NERC.
C. 12 hours after the alert was issued.
D. after a 24hour period.

A

A. at the end of the specified light load period.

PJM Emergency Operations Manual M-13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When PJM declares a hot weather alert, the generation dispatcher should
A. determine if maintenance can be deferred.
B. notify transmission operators.
C. direct all generating stations to increase MW output
D. direct all generating stations to reduce MVAR output.

A

A. determine if maintenance can be deferred.

PJM Emergency Operations Manual M-13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
During system restoration, the two categories of reserves are
A. dynamic and secondary.
B. spinning and quick start.
C. dynamic and spinning.
D. spinning and primary.
A

C. dynamic and spinning.

PJM System Restoration Manual M-36

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
During system restoration, frequency should be maintained between
A. 59.50 and 60.00 Hz.
B. 59.75 and 61.50 Hz.
C. 59.75 and 61.00 Hz.
D. 59.50 and 60.50 Hz.
A

C. 59.75 and 61.00 Hz.

PJM System Restoration Manual M-36

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

PJM issues a heavy load voltage schedule. Member companies who own generation facilities
should
A. remove 230 kV capacitors from service.
B. ensure voltage regulators on generating units are in service on automatic.
C. inform transmission providers to have marketers in their areas cut transactions.
D. instruct generating stations to curtail nonessential building loads.

A

B. ensure voltage regulators on generating units are in service on automatic.

PJM Emergency Operations Manual M-13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A unit being dispatched economically by PJM should set its MW output based on the
A. LMP at generator bus.
B. LMP in the unit’s zone.
C. Unit’s dispatch rate or desired MW level.
D. generation owner’s discretion.

A

C. Unit’s dispatch rate or desired MW level.

PJM Balancing Operations Manual M-12

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What hourly revenue data is required of a generator by PJM?
A. Compensated MWh delivered by each unit
B. Integrated LMP data per generator node
C. Availability by generator schedule
D. Estimated compensation dollars by generator

A

A. Compensated MWh delivered by each unit

PJM Generator Operational Requirements Manual 14D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
During system restoration prior to synchronization of a unit, the dispatcher should ensure sufficient
load is available to
A. economize unit operation.
B. maximize unit operation.
C. stabilize unit operation.
D. minimize unit operation.
A

C. stabilize unit operation.

PJM System Restoration Manual M-36

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
A non-zero ACE indicates:
A. over-excitation.
B. an imbalance of generation and load
C. a capacity shortage situation
D. low temperatures in a localized zone
A

B. an imbalance of generation and load

PJM Balancing Operations Manual M-12

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

During certain emergency conditions, a Capacity Performance generation resource that fails to
generate the required amount of energy may be charged:
A. a peak period maintenance penalty
B. a non=performance assessment charge
C. an additional credit requirement
D. the synchronized reserve market clearing price for the past 19 days

A

B. a non=performance assessment charge

PJM Capacity Market Manual M-18

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
Control center facilities must have a minimum of how many days of fuel for the backup generator?
A. 3
B. 5
C. 7
D. 9
A

B. 5

PJM Control Center and Data Exchange Requirements Manual M-1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
Which of the following one-way communication system is used to disseminate information to
market operation centers?
A. all call
B. e-mail
C. radio
D. transaction management system
A

A. all call

PJM Control Center and Data Exchange Requirements Manual M-01

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
Real time bus prices may be monitored using
A. Data Viewer.
B. eDART.
C. InSchedule.
D. Markets Gateway.
A

A. Data Viewer.

PJM Balancing Operations Manual M-12

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Which of the following actions is a violation of PJM two settlement market rules?
A. offering a unit day ahead on a price-based schedule
B. not bidding demand (load) into the day ahead market
C. not offering an available PJM capacity resource into the day ahead market
D. making the economic high limit and the emergency high limit the same

A

C. not offering an available PJM capacity resource into the day ahead market

PJM Energy & Ancillary Services Market Operations Manual M-11

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q
A unit that fails to start when scheduled, would be classified as which of the following types of
outage?
A. planned
B. maintenance
C. unplanned
D. self-scheduled
A

C. unplanned

PJM Pre-Scheduling Operations Manual M-10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q
A forecasted planned outage starts a minimum of how many days into the future?
A. 9
B. 30
C. 31
D. 60
A

C. 31

PJM eDART Users Guide

20
Q

Maintenance outages are permitted when
A. a unit trips and is scheduled for a maintenance outage the following week.
B. a unit can be held online until the following Monday, and system reliability is not affected.
C. a unit has a capacity rating of 300 MWs or less.
D. manpower is onsite when a unit trips offline.

A

B. a unit can be held online until the following Monday, and system reliability is not affected.

PJM Pre-Scheduling Operations Manual M-10

21
Q
If PJM ACE shows overgeneration, actual imports are
A. less than scheduled.
B. more than scheduled.
C. exactly as scheduled.
D. on a flat tie line.
A

A. less than scheduled.

PJM Balancing Operations Manual M-12

22
Q
Who should a generator contact at PJM to clear an outage ticket?
A. Master Coordinator
B. Generation Dispatcher
C. Transmission Dispatcher
D. Shift Supervisor
A

A. Master Coordinator

PJM eDART Users Guide

23
Q
Which page in Markets Gateway is used to reflect real-time changes to unit status and output?
A. Unit Detail
B. Schedule Detail
C. Unit Hourly Updates
D. Schedule Detail Updates
A

C. Unit Hourly Updates

Markets Gateway User Guide

24
Q
The loss of a large generation unit on the PJM system can be detected by monitoring
A. frequency and PJM area control error.
B. frequency and load.
C. load and interchange.
D. system voltage and load.
A

A. frequency and PJM area control error.

PJM Balancing Operations Manual M-12

25
Q

A 1000 MW unit has tripped in the PJM control area and the PJM ACE now indicates
undergeneration of 1050 MW. What immediate action should be taken by PJM to recover the
ACE?
A. Schedule all available regulation.
B. Request 100% synchronized reserves be loaded.
C. Request a supplementary status report.
D. Schedule additional generating units to parallel as soon as possible.

A

B. Request 100% synchronized reserves be loaded.

26
Q

Which of the following emergency procedures are issued in advance of a scheduled load period to
allow sufficient time for the generation dispatcher to prepare for the anticipated capacity
shortages?
A. warnings
B. actions
C. alerts
D. notifications

A

C. alerts

27
Q
he amount of synchronized reserves must be large enough to cover the loss of
A. hydro units.
B. nuclear units online.
C. all generation online.
D. the largest single contingency.
A

D. the largest single contingency.

28
Q
When preparing a supplemental status report (SSR), a steam unit has 20 hours of fuel remaining.
This unit should be reported as
A. fossil/steam.
B. a resource limited unit.
C. maximum scheduled generation.
D. minimum generation.
A

B. a resource limited unit.

29
Q

PJM responds to capacity shortages by issuing alerts
A. according to bid prices.
B. following completion of an instantaneous reserve check which indicates that the primary
reserve is less than the spinning reserve requirement.
C. during present operations to inform members of actual capacity shortages or contingencies
that may jeopardize reliable operation of the PJM control area.
D. in advance of a scheduled load period to allow sufficient time for members to prepare for
anticipated initial capacity shortages.

A

D. in advance of a scheduled load period to allow sufficient time for members to prepare for
anticipated initial capacity shortages.

30
Q

During black start restoration, priority access to cranking power should be given to
A. hot units that can return to service immediately.
B. combustion turbines in areas where the initial disturbance occurred.
C. units with black start capability.
D. hydro units.

A

A. hot units that can return to service immediately.

31
Q
Severe cold weather conditions require which of the following be staffed, started, and available for
loading?
A. hydro units
B. combustion turbines and diesels
C. nuclear units
D. wind generators
A

B. combustion turbines and diesels

32
Q
During system restoration, a generator should not be loaded above the level of available
A. operating reserve.
B. synchronized reserve.
C. primary reserve.
D. dynamic reserve.
A

D. dynamic reserve.

33
Q
The minimum passing score for a unit regulation test is
A. 50% compliance with the test signal.
B. 75% compliance with the test signal.
C. 90% compliance with the test signal.
D. 100% compliance with the test signal
A

B. 75% compliance with the test signal.

PJM Balancing Operations Manual M-12

34
Q

A capacity resource that intends to be eligible to set real-time LMP must:
A. be modeled in the PJM EMS.
B. have a minimum capacity of 30 MW.
C. be fully staffed during all summer hours.
D. be committed on their cost schedule.

A

A. be modeled in the PJM EMS.

PJM Generator Operational Requirements Manual M-14D

35
Q
Which of the following PJM systems are used to report unit outages?
A. eDART, eMKT, and eGADS
B. eMTR, eSchedules, and eMKT
C. eDART, eCapacity, and eGADS
D. eDART, eMKT, and eCapacity
A

A. eDART, eMKT, and eGADS

PJM Pre-Scheduling Operations Manual M-10

36
Q

Which of the following units is subject to offer capping?
A. a unit performing capacity verification test
B. a unit running for transmission congestion
C. a unit dispatched to provide spinning reserve
D. a unit running to control Eastern Transfer Limits

A

B. a unit running for transmission congestion

PJM Energy & Ancillary Services Market Operations Manual M-11

37
Q
eDART is used for all of the following EXCEPT
A. generation outage scheduling.
B. instantaneous reserve checks.
C. LMP information.
D. generator reactive capability changes
A

C. LMP information.

38
Q

Which of the following generating units would be eligible to set LMP?
A. A fixed-gen self-scheduled steam unit
B. A unit dispatched for constraint control
C. A unit that is on for testing only
D. A hydro unit in condensing mode

A

B. A unit dispatched for constraint control

PJM Energy & Ancillary Services Market Operations Manual M-11

39
Q

A tie line with MW flowing into the PJM control area trips. The system operator will see which of
the following occur?
A. ACE will decrease, frequency will decrease
B. ACE will increase, frequency will increase
C. ACE will decrease, frequency will remain the same
D. ACE and frequency will remain the same

A

D. ACE and frequency will remain the same

PJM Energy & Ancillary Services Market Operations Manual M-11

40
Q

A Minimum Generation Emergency Alert is initiated when
A. PJM projected LMP is at $10/MW.
B. expected generation is within 2500 MW of normal minimum energy limits.
C. expected generation is within 2500 MW of emergency minimum levels.
D. expected generation is within 1000 MW of normal minimum energy limits

A

B. expected generation is within 2500 MW of normal minimum energy limits.

PJM Emergency Operations Manual M-13

41
Q

The primary purpose of a Maximum Generation Emergency Alert is to
A. allow member companies to inform management to be on site.
B. inform companies that PJM is within 1000 MW of normal minimum generation.
C. provide an early alert that system conditions may require PJM emergency procedures.
D. inform neighboring utilities that PJM has excess emergency reserves available.

A

C. provide an early alert that system conditions may require PJM emergency procedures.

PJM Emergency Operations Manual M-13

42
Q
A combustion turbine has 26 burn hours at maximum capacity. How should this be offered into the
Energy Market?
A. maximum emergency
B. minimum emergency
C. black start
D. normally
A

D. normally

PJM Emergency Operations Manual M-13

43
Q

Emergency reducible generation is defined as the difference between
A. normal minimum and normal maximum generation.
B. maximum emergency generation and minimum emergency generation.
C. normal minimum generation and emergency minimum generation.
D. emergency minimum generation and normal maximum generation.

A

C. normal minimum generation and emergency minimum generation.

PJM Emergency Operations Manual M-13

44
Q

Operating reserve must equal the sum of
A. synchronized, Non-synchronized, and secondary.
B. non-synchronized, secondary, and over thirty.
C. synchronized, over thirty, and non-synchronized.
D. secondary, over thirty, and synchronized.

A

A. synchronized, Non-synchronized, and secondary

PJM Pre-Scheduling Operations Manual M-10

45
Q

Where can a generator see its actual hourly performance score in Markets Gateway?
A. Unit Details
B. Market Results - Results
C. Dispatch Lambda
D. Market Results – Regulation and Reserve Award

A

D. Market Results – Regulation and Reserve Award

Markets Gateway User Guide