PG 85-00-300 LCI 4/25/24 Flashcards
Visits to aviation units by personnel assigned to Commandant (CG-41) and ALC will generally be conducted during the unit Aeronautical Engineering Officer’s first _____ months aboard as deemed appropriate by CG-41
6-18
1-1
The primary purpose of these visits is to ensure the
unit’s compliance with applicable policies, processes, and controls. It is also designed to collect
best practices, identify support needs, and provide direct communication between the unit and the aeronautical engineering support structure. _____ is the key word
Communication
1-1
Ideally, the LCI/AE-STAN team will be comprised of the first _____ personnel listed below
team lead
product line representative
corrosion representative
wiring representative
supply representative
engineering support representative
ALSE representative
industrial hygienist
workforce representative
08
1-1
Who maintains the master list, manages the schedule, and assigns
LCI/AE-STAN team members designated by each division.
ALC (ESD)
1-2
Non-compliance with Coast Guard policy or process controls that require corrective action and reconciliation with the Team Lead within ______ days.
75
2-1
What are the 2 types of discrepancies
major
minor
2-1
How many days prior to LCI should a unit be notified
45 days
3-1
How many days prior to LCI should a unit submit an electronic read-ahead to the Team Lead
10 days
3-1
How many days after LCI does the team lead Draft final report due to ESD Chief and ESD-CMB.
10 days
3-1
Corrective action for all major and minor discrepancies shall be reconciled with the Team Lead no later than
75 days following the receipt of CG-41 final report
3-1
Any takeaway or followup items the team departs with should be reconciled with the unit within
75 days from completion of the LCI
3-1
How many days after LCI is the final report due to unit from ESD Final report due to unit, cc CG-411. Refer to Enclosure
(1) for required format.
15
3-1
Draft final report including corrective actions due to CG-41 from ESD. See Enclosure (3)for required format.
90
3-1
Who is responsible for compiling the final report package and delivering it to the ALC ESD Chief, through the CMB Chief, within 10 days of the unit turning in their corrective
actions.
The Team Lead
3-1
What is the LCI pre inspection questionnaire
ALC ESD 40
ENCL 2