PG 85-00-10 ACMS 4/24/24 Flashcards
The primary function of the ACMS database is to provide a _____ and _____ organization of the data captured and maintained by ACMS
logical and cohesive
1-2
The ACMS program is comprised
of several smaller subsystems dedicated to the tracking and reporting of all aspects of asset
maintenance and logistics. The subsystems are what
ACMS Maintenance Reporting and Tracking
Mandatory special requirements
special requirements
1-3
What subcategories are under the Mandatory Special Requirements category
Aviation life support equipment(ALSE)
Avionics support(AS)
ground support(GS)
Rescue Assistance(RA)
Support Equipment(SE)
Damage Control(DC)
Publication Audit(PA)
1-3
What items are under special requirement category
Fuel farms, ramp sweepers, hangar doors, small boats used to support aircrew training
1-3
What are the 3 types of ACMS reports
operational- MDLs, SCHR
management- performance and reliability inspection overdue maintenance, fleet readiness
system-MRLs, asset listings, enrolls, scraps, etc.
1-7
Users may request changes and corrections to the ACMS process guide by submitting an ATIP
_____
Deficiency Report (CG-22)
2-1 Note
What buttons actually commit the data or processing action to the system
Execute (F10) or the Save (Alt+8) option
2-2
What moves the cursor to the next input field
Tab or Enter key
2-2
What exits to previous screen
F3
2-2
If you cannot access the ACMS host computer after several attempts, contact _____ at 1-855-243-4948, option _____
CG-FIXIT
6
2-3 Note
The ACMS data base is comprised of three categories:
maintenance requirements
maintenance history
maintenance actions
2-5
The two types of associated
CMSCODE processes are what
automatic sign off and manual sign off
2-5
The major report types are what
status reports, MDL, Configuration Reports (CONFIG), and the SCHR
2-5
The ACMS data base is comprised of three categories:
maintenance requirements
maintenance history
maintenance actions
3-1
How many steps for asset ACMS/ATS File MPC Signoff asset component
6 steps
3-8
How many steps to enroll an item (non MSR)
5
3-10
How many characters for an SCHR
600
3-13
How many steps for CROSS PLATFORM (AVIONICS/MISSION SUPPORT) MPC SIGNOFF
6 steps
4-2, 4-3
What does MSR cover
7 things
ALSE, avionics support, ground support, rescue and assistance, support equipment, damage control, and publication audit
5-1
How many commands or steps to sign off MSR MPC
6 commands
5 steps
5-2 Table 5-1
Changing the serial number of
an item requires what
Contact ACMS Operation Center. SERNUM changes cannot be entered at unit level
5-3
What are example of generic MSR MPCs
receive
inactivate
scrap
deploy
relocate
ship
5-3
The Maintenance Due List, Overdue Maintenance Due List, Maintenance Requirements List, CMS Code Status Report, and In transit Summary Report are now available only through what
ALMIS DSS Web Reports
5-11
Currently how many reports are available within MSR
5
status report
history SCHR report
SAR deployed equipment report
component summary report
CMSCODE history report
5-11
How many steps to generate a report
4 steps
5-11
How many steps to enroll a MSR component
4 steps
5-12
What is the ALMIS process guide
PG 85-00-1570
6-6
If the operating activity cannot access the ACMS data base for
a period exceeding _____ days, completed enrollment forms will be
mailed to ACMS Operation Center
7
7-1