ALMIS PG 85-00-1570 4/3/17 Flashcards
REVISED 4/18/24
A boat is considered a small boat at what size in feet
under 65 ft
one of the cover type pages
Where all Web Reports and Powerplay Cubes are to be saved.
My folders tab
1-3
Where do you look up parts
ALMIS queries
2-1
ALMIS AllData Query defaults to the what page
NIIN page
2-2
What is the parts and material Request/Use form
CG-4491
2-5
What color is the text when a discrepancy is updated or pre-mission and servicing is updated
green
multiple pages
The deleted discrepancy can be restored by a Maintenance Supervisor. Who can permanently delete a discrepancy
A Maintenance Releaser can restore and/or permanently
delete a discrepancy
2-24
The Special Inspections function in EAL lists inspections or tasks to be completed that have a
short-term interval, such as a daily task or a task due every _____ days or every _____ hours
10
25
2-25
Special Inspections are not intended to list reportable scheduled
maintenance unless the interval is short, generally a weekly task or _____ hours or less
50
2-25
What color text alert appears between the asset status and the current discrepancies to alert when the next Special Inspections are due
red
2-26
The Cannibalization process requires two logbooks. What are they
Receiving Asset Logbook and the
Donor Asset Logbook
2-32
Discrepancies for non-mission essential parts are deferred as
what status
Parts Pending (PP.)
2-33
Discrepancies for mission essential parts are disabled and the status is changed to what
NMCS
2-33
What letters are used for Cannibalization Removal
CR
2-38
What letters are used for a signed-off cannibalization procedure that still requires a QA and Maintenance Release
A Cannibalization Installation (CI)
2-41
When QA time is included on applicable MPCs, the time listed in ALMIS is _____ MLH
0.1
2-47
What is a BRAVO status
Ready for mission use, designated by:
* FMC - Fully Mission Capable
* PMC - Partially Mission Capable
3-2
Not Mission Capable. Reasons designated by:
- M - Scheduled or Unscheduled maintenance
- S - Supply
- D - Depot Maintenance
- D - Charlie period is always NMCD
3-2
RFB stands for
Ready for Bravo
3-2
Asset Status changes are displayed by date in _____ minute intervals
15
3-12
When corrective action on a BRAVO (FMC or PMC) asset is delayed beyond _____ hours, one of the Delay of Maintenance Action codes must be assigned to that discrepancy. Carried Forward (CF) indicates maintenance action is being carried forward to a later date. Carried Forward Depot (CFD) indicates a maintenance action is being carried forward to a future depot level maintenance period. Parts Pending (PP) indicates that a
maintenance action is being delayed due to parts being ordered
24 hours
3-12
Where is the only place in EAL where local time will be used
flight schedule
4-2
What icon shown in the asset column is used to view the asset’s maintenance record or mission-generated maintenance record
pink sheet
4-6, 4-20
What color is the pre-mission and servicing sheet icon.
yellow
4-7
Complete the Deployment section when an asset has been away from its home station for how many hours
12 or more
4-17
For all assets, if a discrepancy causes the mission to be aborted
then that maintenance discrepancy shall be recorded on a Maintenance Discrepancy _____ Sheet and associated with the mission
event abort status
pink
4-20
Enter how many mission-generated Discrepancies per maintenance record
only 1
4-21
What are the 4 statuses assigned to a mission
success
delayed- if more than 15 minutes
canceled
aborted
multiple pages in ch. 4
The original paper copy of the transcribed mission record is required to be retained for
_____ days, after which time it may be disposed of
90
4-28
A Maintenance Supervisor can restore deleted maintenance
records. Who is required to completely delete a maintenance record from an asset maintenance
record logbook
Maintenance Release authority
6-3 Note
Typically, who will determine the rate at which programmed hours are
to be utilized
Operations Officer
6-8
A report can be scheduled to run from as often as every _____ or up to yearly
minute
7-60 Note
Maintenance notifications and Engineering Asset Assignment page displays in what color text
Green
4-25, 5-15