OP J2:VIII Flashcards

1
Q

OP J-2:VIII

What two things are required to make 500 kv OPERABLE?

A
  • 500 kv connected to grid by one of three lines (golden triangle)
  • switchyard voltage > 512 kv
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

OP J-2:VIII

Describe power limits during 500 kv line outages:

one line out?

two lines out?

A

one line out (SPS out of service)

  • Voltages 24.375 to < 25 kv ==> 1800 MW
  • Voltages > 25 kv ===> 2000 MW

one line out (SPS in service)

  • no limitations

Two lines out (SPS irrellevant)

  • 1600 MW
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

OP J-2:VIII

What makes 230 kv INOPERABLE?

A

LTC in manual

52 VU 11 closed (SU bus x-tie)

voltages not in accordance with table

How well did you know this?
1
Not at all
2
3
4
5
Perfectly