EALs Flashcards

1
Q

EP G-1

What responsibilties do the following individuals have as far as initial classifications, upgrading** and **downgrading plant events:

Shift Manager (SM)

Site Emergency Coordinator (SEC)

Emergency Director (ED)

A

SM

  • initial classification
  • all upgrades (until relieved)
  • only downgrade from UE

SEC

  • all upgrades (until relieved)
  • no downgrade authority

ED

  • all upgrades
  • all downgrades
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

EP G-1

If during a plant event the Plant Mode changes before the ECL (emergency classification level) is made, what Mode is used to make the classification?

A

the Mode that existed when the event occured

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

EP G-1

What are the conditions that must be met for a delay in the 15 min ECL declaration be accectable?

A
  • delay has no sig impact on implementation of actions to protect health and safety of public
  • delay caused by activily performing another action that protects the health and safety of public (more risky to declare than take other action)
  • delay not reasonably foreseeable/ preventable
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

EP G-2

Who is the emergency director (ED) during the initial response to an accident?

A
  • the SM is the ED until relieved by the EOF or TSC in addition to having all his/her normal responsibilities
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

EP G-3

How long does the SM have to make the initial ECL notifications?

How long for follow up notifications?

Who must be notified?

A

Initial

  • 15 min (state and county)
  • 1 hr (NRC) but ASAP

follow-up

  • ≈ every 45 min (state and county)
  • NRC…….no guidence (done every hour)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

EP G-3

What are the conditions that would warrent an expidited follow-up notification ( < 45 min)?

A
  • change in Rad release status
  • change in Unit status (mode, important components)
  • concurrent EALs met (other unit comes up to worst)
  • change in SFP conditions
  • declared ECL was not communicated due to higher level ECL immediately surpassing it
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

EP G-4

Who has the authority to initiate assembly and accountability?

including evacutation,

early work release,

etc.

A
  • SM (until relieved)
  • SEC
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

EP G-5

Who on site are “Essential Personnel”?

A
  • OPS
  • C & RP
  • Maint (I&C, EE, MM
  • IFOs (fire fighters)
  • Security
  • ERO members
  • anyone deemed by SM or SEC
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

EP G-1

When does time 0 start for making a declaration?

When does time 0 start for making notifications?

A

declaration - when event happens

notifications - time embeded in SM update declaration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

EP G-2

How long do we have to activate VANS for an ALERT or higher?

Unusual Event?

A

Alert or greater = immediately

UE =ASAP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

EP G-3

What are all conditions that notifications are made to state and county w/in 15 minutes?

What conditions make-up a “Rapidly Progressing Severe Accident”?

A
  • initial ECL
  • upgrade ECL
  • new PAR
  • change in PAR
  • GE declared
  • Initial PAR
  • loss CNMT (EAL)
  • RM-30/31 > 80 R/hr OR RG1.1 met for GE table
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

OM10.ID6

What is the difference between Catagorie A and B equipment?

What must be done before taking Cat A and B equip out of service?

A

A - has no redundant equipment

B - has b/u equipment for indication or function

A - must have comp measures in place before remove from service

B - should have comp measures in place before remove from service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly