1
Q

Building farms is part of agricultural construction.

A

La construcción de granjas forma parte de la construcción agrícola.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Building structures for the private sector is part of commercial construction.

A

La construcción de estructuras para el sector privado es parte de la construcción comercial.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Building homes and apartment buildings is part of residential construction.

A

La construcción de viviendas y edificios de apartamentos forma parte de la construcción residencial.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The construction of factories and warehouses is part of industrial construction.

A

La construcción de fábricas y almacenes forma parte de la construcción industrial.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The construction of roads and bridges is part of civil construction.

A

La construcción de carreteras y puentes forma parte de la construcción civil.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The construction of wind farms or recycling plants is part of environmental construction.

A

La construcción de parques eólicos o plantas de reciclaje forma parte de la construcción ambiental.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Modifying the structure of an existing building is known as remodeling.

A

La modificación de la estructura de un edificio existente se conoce como remodelación.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

We need drywall to start building the walls.

A

Necesitamos paneles de yeso para empezar a construir las paredes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The siding for the house is done at the end of the project.

A

El revestimiento de la casa se hace al final del proyecto.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Shingles are always found with roofing materials.

A

Las tejas siempre se encuentran con los materiales del techo.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The roof is an important part of the house structure.

A

El techo es una parte importante de la estructura de la casa.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The client wants wood as the flooring in the house.

A

El cliente quiere madera para el piso de la casa.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Make sure you have enough paint for all the rooms.

A

Asegúrate de tener suficiente pintura para todos los cuartos.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The primer we use for the paint is of good quality.

A

La base que utilizamos para la pintura es de buena calidad.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

I brought extra putty in case we need to fill a gap.

A

Traje masilla adicional por si necesitamos tapar un hueco.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The client only wants tiles in the bathroom.

A

El cliente solo quiere azulejos en el baño.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Take all the safety precautions when installing cables.

A

Toma todas las precauciones de seguridad cuando instales los cables.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

You need to excavate before installing the sewer

A

Tienes que excavar antes de instalar la alcantarilla.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Installing drainage systems helps maintain the roadways.

A

La instalación de sistemas de desagüe ayuda a mantener las carreteras.

20
Q

The plumbing systems also go underground.

A

Los sistemas de plomería también van bajo tierra.

21
Q

The electrical installation is one of the most dangerous parts of the job.

A

La instalación eléctrica es una de las partes más peligrosas del trabajo.

22
Q

The floor plan gives us the measurements we need to build.

A

El plano nos da las medidas que necesitamos para construir.

23
Q

Where is the concrete for the foundation?

A

¿Dónde está el concreto para el cimiento?

24
Q

We need to start excavation as soon as possible.

A

Tenemos que empezar la excavación lo antes posible.

25
Q

By law, you find fire extinguishers on all floors.

A

Por ley, encuentras extintores de incendios en todos los pisos.

26
Q

If you see smoke, be sure to activate the fire alarm.

A

Si ves humo, asegúrate de activar la alarma de incendios.

27
Q

We need to set up the scaffolding before the remodel.

A

Necesitamos montar el andamio antes de la remodelación.

28
Q

This job site is full of dangers. Make sure you are wearing your safety helmet.

A

Este sitio de trabajo está lleno de peligros. Asegúrate de llevar puesto tu casco de seguridad.

29
Q

Make sure this room has enough ventilation while you work.

A

Asegúrate de que este cuarto tenga suficiente ventilación mientras trabajas.

30
Q

Ventilation is important for protection against harmful dust.

A

La ventilación es importante para la protección contra el polvo nocivo.

31
Q

If you have any questions about the job, ask the foreman.

A

Si tienes alguna pregunta sobre el trabajo, pregúntale a la encargada.

32
Q

If you have questions about the project, please see the supervisor.

A

Si tienes preguntas sobre el proyecto, por favor, ve a la supervisora.

33
Q

We have hired a contractor to build the pool.

A

Hemos contratado a una contratista para que construya la piscina.

34
Q

The inspector makes sure the building is ready.

A

El inspector se asegura de que el edificio esté listo.

34
Q

The plumber we hired is a subcontractor and will only be installing the bathrooms in two houses.

A

La plomera que contratamos es una subcontratista y sólo instalará los baños en dos casas.

35
Q

We have subcontracted bricklayers who will arrive in two weeks.

A

Hemos subcontratado enladrilladores que llegarán en dos semanas.

36
Q

A bricklayer is also a type of mason.

A

Un enladrillador también es un tipo de albañil.

37
Q

We need civil engineers to build and maintain roads.

A

Necesitamos ingenieros civiles para construir y mantener las carreteras.

38
Q

We need to maintain the schedule.

A

Necesitamos cumplir con el calendario.

39
Q

We are under budget

A

Estamos bajo presupuesto.

40
Q

Ensuring quality standards.

A

Garantizar los estándares de calidad.

41
Q

What is the timeline for that?

A

¿Cuál es el calendario previsto para ello?

42
Q

That goes against building codes

A

Eso va contra los códigos de construcción.

43
Q

You need to manage the crew.

A

Tienes que dirigir al equipo.

44
Q

Go over safety procedures.

A

Repasa los procedimientos de seguridad.