What types of CPD have you carried out regarding Health and Safety?
Formal - IOSH, First Aid training, CSCS
What is the pre-construction phase?
Its the phase prior to construction, i.e design stage, tendering, pre-construction phase plan.
0 - 4 RIBA PLAN OF WORK 2020.
What is the pre-construction information?
Clients responsibility though usually undertaken by PD.
- Site, project and client information.
- Contact details.
- Known hazards (i.e. asbestos etc)
- Restrictions etc
When are works notifiable?
Notify HSE in an F10 Form.
Applies if the project exceeds 500 man days or 30 days with 20 operatives on site at the same time at any point.
When are works notifiable?
Notify HSE in an F10 Form.
Applies if the project exceeds 500 man days or 30 days with 20 operatives on site at the same time at any point.
Marquis Court: How often does a scaffold need to be checked?
Every 7 days or when the weather conditions have changed which may affect condition of scaffold. The inspection must be carried out by a SMSTS certified or appropriately qualified person.
Marquis Court: What regulations does the scaffold come under?
Work at Height Regulations 2005.
Marquis Court: Is a scafftag a legal requirement?
No its not if you have a suitable tag system and inspection records.
Marquis Court: Must scaffolds be designed/calculated.
Yes they must be designed
or
Erected in accordance with the standard designs listed in the NASC TG20 Document.
or
Erected in accordance with manufacturers recommendations.
Marquis Court: Can ladders be used for work?
Yes if the correct risk assessments are in place and adhered too.
Usually used as last resort or low risk works, short duration etc.
Look to use scaffolding or MEWP in first instance.
Marquis Court: How did you notify the PC that the scaffolding is missing its tag?
Phone call immediately and reiterated in writing.
Marquis Court: How did you ensure the scaffold wasn’t used?
Following communication with the PC I attached a note to the scaffold notifying users of the issue and notified the on site foreman of the issue.
Marquis Court: What are the main points within the Surveying Safely document?
Personal and corporate responsibility
Safe Person concept
Assessing hazards and risks
Visiting premises and sites
Marquis Court: What PPE would you take to site?
High vis Boots Hard hat Harness Gloves Eyewear
How do you know if a hard hat is in date?
Check the expiry date on the back.