Group 5.4 Window and door installation, Part II : Industry Performance Standards Flashcards
This standard forms the foundation for installation methodology in mild climates:
ASTM E2112.
ASTM E 2112 focuses on installation of _______(mounting type) windows installed in _____(new/old) construction with a _____ (barrier or membrane drainage) system.
flange mounted
new
membrane draiange
ASTM E2112 describes how many different methods for window installation, based on what differences in the installations?
Four, based on the sequence of WRB and window installation and whether sheet flashing are applied over or behind the window flanges.
List and define the four methods described in ASTM E2112 in terms of the sequence and position of flashing and WRB relative to the window, for each.
A: Jamb flashing after/over the mounting flange, WRB applied after the window install
A1: Like A, but with the WRB applied BEFORE the window
B: Jamb flashing before/under the mounting flange, WRB applied after the window install
B1: Jamb flashing before/under the mounting flange, WRB applied before the window install
What is the key distinction between installations per ASTM E2112 method A and B.
A: After: Flashing is After the Window, Over the flange
B: Before: Flashing is Before the Window, Behind the flange
What is the key distinction between A/B methods and A1/B1 methods per ASTM E2112?
A/B: The WRB is applied AFTER the window is installed.
A1/B1: 1 (First)- The WRB is installed FIRST, before the window.
AAMA has developed installation practices for integration of window installations with the building envelope (for 1 & 2 family detached dwellings up to 3 stories). These are:
AAMA 2400 - For new installations
AAMA 2410 - For retrofit
AAMA 2400 applies only to windows installed in: Masonry walls Open stud-frame walls Insulated Concrete Forms Green houses
Open stud Frame walls.
AAMA 2400 is intended for installations in \_\_\_ climates, with \_\_\_ risk of water intrusion. Dry _ No Mild _ Low Wet _ High Hot _ Low
Mild _ Low
AAMA 2400 installation methods A & B ____ the methods defined in ASTM E2112.
Match exactly
Closely parallel
Differ
Complement
Closely parallel
AAMA 2410 addresses what type of window installation? Defective New in masonry walls Replacement
Replacement
What two new documents were created to address window installations subject to severe weather conditions?
FMA / AAMA 100
FMA / AAMA 200
FMA / AAMA 100 addresses new construction of not more that \_\_\_ stories in height. 1 2 3 4
3
FMA / AAMA 100 Outlines 3 installation phases:
Pre-Installation
Installation procedure
Post-installation
Which of the following is not included in the FMA / AAMA 100 pre-installation phase?
WRB Installation Inspection
Box-cut the WRB around the opening
Check opening for plumb, level and square
Inspect the fenestration product for damage
Box-cut the WRB around the opening
The FMA / AAMA 100 Installation procedure includes what 5 processes?
Cutting and folding WRB into the opening. Sill pan flashing Jamb and head flashing Positioning and shimming of the window Final anchoring and WRB inspection.
FMA / AAMA 100 references two flashing types used, what are they?
4” wide SAF
9” mechanically attached flashing
FMA / AAMA 200 focuses on the installation of flanged windows into _____ or ____ buildings?
small or large.
residential or commercial
new or renovated
masonry or concrete
masonry or concrete