Exam 14 Flashcards
Question 1:
You’re the chief for a fire in the following structure: New Law Tenement with a commercial occupancy on the first floor. All of the following points were correct except?
A: Deep or wide stores may span two or more apartments above.
B: The floor above the store(s) is constructed of wood joists.
C: Alterations may have created openings in ceilings and walls that can channel fire and smoke into column and pipe voids some distance from the original fire, horizontally as well as vertically.
D: The presence of tin ceilings will protect the floors above from fire extension.
D
Explanation:
D. Tin ceilings are difficult to pull and may NOT prevent fire extension.
MD 5.7.1
Question 2:
You have just returned to quarters from operating 2nd due at JFK Box 269 where you were designated the Staging Area Manager communicating with the ICP on the 800 MHz radio. As you walk up the stairs to B-500’s office, a run comes in for a fire on the 30th floor in a 50 story 200X200 CL-1 High-Rise Office Building. Upon arrival, you receive confirmation of a fire on the 30th floor, and transmit the 10-76. All units are on scene and in position, however, the only unit that carried out their position correctly can be found in which choice?
A: The Fire Sector Supervisor Ensured the attack stairway has been cleared of building occupants for at least five floors above the fire
B: Three engines and two ladder companies headed up to the 29th floor where the forward staging area is located
C: The fourth arriving ladder company is operating on the upper floors initiating the search of the evacuating stairs
D: The first arriving engine company (conventional engine) was seeking permission to operate in High-Pressure since the fire was on the 30th floor
A
Explanation:
B- 28th floor (2 floors below the original fire floor)
C- Attack stairs
D- floors 21-30 is 250 psi…above this pressure needs permission, unless an emergency exists for conventional engines (Engines ops ch 9 add 1 sec 2.1 table
AUC 325 sec 5.2.2
High-Rise Office Building sec 5.3.1.B.7, 6.4.5.A, 6.6.2
Question 3:
A group was discussing Smoke Detecting and water-flow devices and what would result from an activation on a floor in a High Rise building constructed in 2010. Which of the following is incorrect about automatic triggers to an activation of one of these systems?
A: At the elevator landings & within the HVAC system, an alarm activation would result in the automatic recall of the elevators.
B: The fire alarm signal will be transmitted on the fire floor, the floor above, and the floor below.
C: Activation of a sprinkler water-flow alarm will result in the recall of the elevators.
D: A fire alarm signal will be transmitted to the Fire Department, the Fire Command Station, the Mechanical Control Center, & the regularly assigned location of the Fire Safety Director.
A
Explanation:
*Hi Rise Office Buildings Section 7.2.5.
B – Correct – In buildings built under the 2008 Building Code, the alarm will also sound on the floor below. 7.2.5A2
C – Correct 7.2.6
D – Correct 7.2.5.A3 & 4.
A – Incorrect – Within the HVAC system, the activation of this device shall accomplish all of the actions listed in 7.2.5 with the EXCEPTION of recalling the elevators. 7.2.5B
Question 4:
BC Nugent of B-400 was just notified by Capt Joel of TL 300 that his efforts of correcting a condition from a construction road crew that shut down a main thoroughfare, which he uses to respond to alarms weren’t receptive to his recommendations. As the chief in charge, BC Nugent followed all of the correct procedures after being notified except?
A: BC Nugent notified the NYC DOT after personally surveying the affected area.
B: NYC DOT can be contacted on a 24 hour basis
C: Failure of the DOT employees to cooperate is to be reported to the Fire Department City Planning Desk
D: If the City Planning Desk cannot be contacted, then a letter head report is to be sent to Chief of Department via chain of command
D
Explanation:
If the City Planning Desk cannot be contacted, the Bureau of Operations Emergency Operations Center shall be contacted
AUC 302 sec 2.2
*Be aware that the terminology is still in our books
Question 5: MEGA HIGH RISE CIDS CARD... MEGA-80 STY-200X100 CL1-RETAIL FLS 1-10/ COMM 11-45/RES 46-80–A ELEV BANK SVS FLR 1-10/B 10-45/C 45-80/D SVCE ELEV FLR 1-45 – ACCESS STAIRS FLRS 17-23 & 30-37 A 1076 has been transmitted for fire discovered on the 34th floor of the Mega Hi-Rise mixed occupancy building and the Battalion arrives, takes a position in the lobby and assumes responsibility as incident commander. What is the priority order of the following in carrying out the basic strategic operating plan? ****(1) Confine & Extinguish the fire. ****(2)Simultaneously or as soon as possible, begin the process of controlling the evacuation. ****(3)Determine the fire floor. ****(4)Verify the fire floor. ****(5) Gain control of the building systems. A: 3,2,4,1,5 B: 3,4,1,2,5 C: 3,4,2,5,1 D: 3,2,5,4,1
C
Explanation:
*Hi-Rise Section 5.1.1
C is Correct – Listed in order of importance…
Question 6:
You’re the IC at an ammonia leak from an ice skating rink. You’re deciding whether to evacuate downwind or shelter- in-place. Sheltering-in-place is the preferred alternative when the hazardous material displays all of the following characteristics except?
A: Low to moderate toxicity
B: Partially released and dissipating
C: Small quantity solid or liquid leak
D: A migrating vapor of low toxicity and quantity and people are safer indoors than outside
B Explanation: ERP, Hazardous Materials B. Totally released and dissipating 9.5.5 C 2 * Sheltering-in-place is also the preferred alternative when the release of hazardous materials can be rapidly controlled at the source 9.5.5 C 5
Question 7:
Two Battalion Chiefs discussing the Department’s self-mutual policy for firefighters were able to identify which incorrect comment made during their discussion?
A: Battalions shall notify the Office of Staffing Assignment (OSA) by telephone of all self-mutuals granted.
B: Battalions shall verify the Citywide Staffing Level on the day before the requested tour by contacting OSA by telephone, no sooner than 1200 hours.
C: Firefighters shall only be permitted to link a payback self-mutual tour with a regularly scheduled work tour (24 hours) when assignments for both tours are within the same Battalion.
D: Requests for self-mutual/off will only be permitted for tours when the applicant’s regularly assigned group is scheduled to work. Requests for self mutual/repayment will be permitted only when applicant’s regularly assigned group is not scheduled to work.
C
Explanation:
Firefighters shall only be permitted to link a payback self-mutual tour with a regularly scheduled work tour (24 hours) when assignments for both tours are within the SAME or ADJOINING COMPANY.
*Otherwise, portal to portal OT and ARs will result.
PAID 3-94 2.1.3, 2.2.3, 4.5 - 4.7
Question 8:
The BC en-route to a Buckeye Pipeline 9000 Dummy Box alarm shall ensure certain procedures are followed. Choose the incorrect procedure.
A: Ascertain from the dispatcher if a full response has been provided. If it has not then one shall be requested
B: Ascertain from the dispatcher whether or not the regular assigned units are responding
C: If other than the regularly assigned units are responding, request the dispatcher to contact them to ascertain if they have shut-off wrenches, UAAC’s, and Instruction Cards
D: If units do not have shut-off wrenches, UAAC’s, and Instruction Cards, the BC en-route shall have units to return to quarters to pick up the shut-off wrenches, UAAC’s, and Instruction Cards
D
Explanation:
The dispatcher shall special call a designated alternate unit to cover that assignment
AUC 149 sec 7.2
***CONFLICT- Any unit special called to a pipeline box, 9000 series, which does not have the special wrenches, Assignment and Instruction cards, and map shall respond to the quarters of the NEAREST unit so equipped and secure this equipment at the housewatch area. 4.8
Since you’re studying for BC, we felt choice D is more pertinent, but be aware of the conflict.
Question 9:
Members studying for the upcoming chiefs exam were reviewing air pressurized standpipe systems, which are required in buildings under construction greater than 75 feet and buildings undergoing demolition with an existing standpipe. They were correct in all statements made except?
A: To use an air pressurized system at a fire operation the air pressure must be released from the system prior to uncapping the siamese and supplying it with water
B: A 2 1/2” manual air release/drain valve (usually a standard outlet) is required to be installed immediately adjacent to the siamese connection
C: Remove the manual air release valve cap and open the valve fully
D: The number of air release valves is required to be such that air pressure shall be released in no more than 5 minute
D Explanation: Engine Ops Chapter 9, Addendum 2 A. 2.1 B. 2.1 C. 2.2 D. The number of air release valves is required to be such that air pressure shall be released in no more than 3 minutes. 2.2 *Fairly New Material 1/28/2015
Question 10:
You, the Battalion Chief, go 10-84 at the intersection of Broadway and Main street for a report of a manhole fire. After several minutes, you determine operations at this incident are within the capability of a single unit to wait on scene for the arrival of the utility emergency crew. However, as you are leaving the scene, the dispatcher gives you an ETA from the utility company of one hour. Based on this ETA, you now may order one of the four following options. Choose the incorrect option.
A: The unit remaining on the scene may respond to assigned alarms received via department radio; one member shall be left at the scene
B: One member shall be left at the scene and the unit shall return to quarters. Battalion Chief of the incident shall provide relief for members
C: When a member is left at the scene, the company officer shall at frequent intervals contact the dispatcher for re-notification of the utility company
D: The manhole shall be protected by traffic cones and tape, and units placed in service
B
Explanation:
Company officers shall provide relief for members
These 4 options are available if the expected time of arrival (emergency crew) is more than 30 minutes
This was on the last BC exam
Also know the procedure for multiple incidents within an area (BC shall provide for necessary relief of units or members)
AUC 180 sec 2.6 and 2.7
Question 11: MEGA HIGH RISE CIDS CARD... MEGA-80 STY-200X100 CL1-RETAIL FLS 1-10/ COMM 11-45/RES 46-80–A ELEV BANK SVS FLR 1-10/B 10-45/C 45-80/D SVCE ELEV FLR 1-45 – ACCESS STAIRS FLRS 17-23 & 30-37 Arriving as the 3rd Battalion chief assigned on the transmission of the 10-76 you make your way into the lobby after not receiving a designation from the dispatcher. Which role are you likely to be assigned according to specific tasks listed in Hi Rise for the 3rd & 4th Arriving Battalion Chiefs? ****(1)Fire Sector Supervisor. ****(2)Attack Leader. ****(3)SAE Group Supervisor. ****(4)Attack Group Supervisor. ****(5)Staging Area Manager A: 1,2 & 4 only B: 2,3 & 4 only C: 2,3 & 5 only D: 3,4 & 5 only
B
Explanation:
*Hi Rise Office Buildings 6.5.1 & 5.5.4
B is Correct
1 – Fire Sector – Second Arriving BC
2 – 3rd or 4th BC may be assigned to operate under the direction of the Fire Sector Supervisor or Branch Director. These may be assigned as attack leader (under Fire Sector Supervisor) or Attack Group/Sector Supervisor under a branch director. 5.5.4
3 – The position of SAE Group Supervisor may be staffed by the 3rd or 4th arriving BC. 6.5.1
4 – Same as 2
5 – Staging area established outside of the building. Separate from Forward Staging Area inside. No specific designation.
Question 12:
Power backup for the NYC Transit Subway Repeater System provides a minimum of ___ hour/s of protection in the event of a power outage.
A: 1
B: 2
C: 4
D: 10
Explanation:
The 4 hours is at continuous repeater operation, therefore, the actual protection can be greater than 4 hours.
AUC 207 Add 16 3.2
Question 13: During a Hurricane and/or a Severe Storm Emergency, companies located in a flood area will be relocated to Host Companies or Dispersal sites. When relocating companies to a dispersal site, a chief officer will visit the dispersal site when? A: At least once each tour B: Once a day C: Once every two days D: Radio contact only is suffice
A
Explanation:
AUC 159 page 15
Sec 5.3.8 Units located at dispersal sites (a site other than a firehouse) shall be visited at least once during each tour by a Chief Officer. When not practicable, telephone contact shall be established.
Question 14:
When weather conditions indicate that a severe snow storm is likely to strike NYC, the FDNY has developed an operational plan, which is divided into two phases; Phase A (activation)and Phase B (implementation). During Phase B (implementation) Battalion Chiefs shall report to Division headquarters at 3 hour intervals 4 pieces of vital information. Choose the incorrect piece of information.
A: Side streets which are impassable
B: Percentage of response area impassable
C: Specific large areas or special hazards in accessible
D: Actions taken to alleviate conditions
A
Explanation:
Main arteries which are impassable
AUC 200 5.3.8.A
Question 15:
Hoseline placement at private dwelling fires can be tricky. Which of the following statements is incorrect?
A: The decision to reposition the first hoseline from the 1st floor into the cellar through an exterior entrance can only be made by an Acting Chief Officer/Chief officer.
B: When operating a hoseline to extinguish fire on the exterior of a building, units should sweep the stream across the face of the building, starting at the bottom to extinguish the main body of fire.
C: Whenever two hoselines are stretched and operating, a 3rd hoseline will be positioned and charged at the front of the fire building and operated as ordered by the IC.
D: For a cellar fire, if the 1st line will be repositioned, ladder company members operating on the first floor must be withdrawn before line is repositioned.
B Explanation: A. Private dwellings Chapter 3 (2.7.4) B. Sweep the stream across the face of the building, starting at the top, so the water cascades down the exterior. Chapter 3 (6.3) C. Private Dwellings (2.9, 3.3, 4.3) D. Private Dwellings (2.7.4)