Exam 14 Flashcards

1
Q

Question 1:
You’re the chief for a fire in the following structure: New Law Tenement with a commercial occupancy on the first floor. All of the following points were correct except?
A: Deep or wide stores may span two or more apartments above.
B: The floor above the store(s) is constructed of wood joists.
C: Alterations may have created openings in ceilings and walls that can channel fire and smoke into column and pipe voids some distance from the original fire, horizontally as well as vertically.
D: The presence of tin ceilings will protect the floors above from fire extension.

A

D
Explanation:
D. Tin ceilings are difficult to pull and may NOT prevent fire extension.
MD 5.7.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Question 2:
You have just returned to quarters from operating 2nd due at JFK Box 269 where you were designated the Staging Area Manager communicating with the ICP on the 800 MHz radio. As you walk up the stairs to B-500’s office, a run comes in for a fire on the 30th floor in a 50 story 200X200 CL-1 High-Rise Office Building. Upon arrival, you receive confirmation of a fire on the 30th floor, and transmit the 10-76. All units are on scene and in position, however, the only unit that carried out their position correctly can be found in which choice?
A: The Fire Sector Supervisor Ensured the attack stairway has been cleared of building occupants for at least five floors above the fire
B: Three engines and two ladder companies headed up to the 29th floor where the forward staging area is located
C: The fourth arriving ladder company is operating on the upper floors initiating the search of the evacuating stairs
D: The first arriving engine company (conventional engine) was seeking permission to operate in High-Pressure since the fire was on the 30th floor

A

A
Explanation:
B- 28th floor (2 floors below the original fire floor)
C- Attack stairs
D- floors 21-30 is 250 psi…above this pressure needs permission, unless an emergency exists for conventional engines (Engines ops ch 9 add 1 sec 2.1 table
AUC 325 sec 5.2.2
High-Rise Office Building sec 5.3.1.B.7, 6.4.5.A, 6.6.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Question 3:
A group was discussing Smoke Detecting and water-flow devices and what would result from an activation on a floor in a High Rise building constructed in 2010. Which of the following is incorrect about automatic triggers to an activation of one of these systems?
A: At the elevator landings & within the HVAC system, an alarm activation would result in the automatic recall of the elevators.
B: The fire alarm signal will be transmitted on the fire floor, the floor above, and the floor below.
C: Activation of a sprinkler water-flow alarm will result in the recall of the elevators.
D: A fire alarm signal will be transmitted to the Fire Department, the Fire Command Station, the Mechanical Control Center, & the regularly assigned location of the Fire Safety Director.

A

A
Explanation:
*Hi Rise Office Buildings Section 7.2.5.
B – Correct – In buildings built under the 2008 Building Code, the alarm will also sound on the floor below. 7.2.5A2
C – Correct 7.2.6
D – Correct 7.2.5.A3 & 4.
A – Incorrect – Within the HVAC system, the activation of this device shall accomplish all of the actions listed in 7.2.5 with the EXCEPTION of recalling the elevators. 7.2.5B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Question 4:
BC Nugent of B-400 was just notified by Capt Joel of TL 300 that his efforts of correcting a condition from a construction road crew that shut down a main thoroughfare, which he uses to respond to alarms weren’t receptive to his recommendations. As the chief in charge, BC Nugent followed all of the correct procedures after being notified except?
A: BC Nugent notified the NYC DOT after personally surveying the affected area.
B: NYC DOT can be contacted on a 24 hour basis
C: Failure of the DOT employees to cooperate is to be reported to the Fire Department City Planning Desk
D: If the City Planning Desk cannot be contacted, then a letter head report is to be sent to Chief of Department via chain of command

A

D
Explanation:
If the City Planning Desk cannot be contacted, the Bureau of Operations Emergency Operations Center shall be contacted
AUC 302 sec 2.2
*Be aware that the terminology is still in our books

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
Question 5:
MEGA HIGH RISE CIDS CARD... MEGA-80 STY-200X100 CL1-RETAIL FLS 1-10/ COMM 11-45/RES 46-80–A ELEV BANK SVS FLR 1-10/B 10-45/C 45-80/D SVCE ELEV FLR 1-45 – ACCESS STAIRS FLRS 17-23 & 30-37 A 1076 has been transmitted for fire discovered on the 34th floor of the Mega Hi-Rise mixed occupancy building and the Battalion arrives, takes a position in the lobby and assumes responsibility as incident commander. What is the priority order of the following in carrying out the basic strategic operating plan? ****(1) Confine & Extinguish the fire. ****(2)Simultaneously or as soon as possible, begin the process of controlling the evacuation. ****(3)Determine the fire floor. ****(4)Verify the fire floor. ****(5) Gain control of the building systems.
A: 3,2,4,1,5
B: 3,4,1,2,5
C: 3,4,2,5,1
D: 3,2,5,4,1
A

C
Explanation:
*Hi-Rise Section 5.1.1
C is Correct – Listed in order of importance…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Question 6:
You’re the IC at an ammonia leak from an ice skating rink. You’re deciding whether to evacuate downwind or shelter- in-place. Sheltering-in-place is the preferred alternative when the hazardous material displays all of the following characteristics except?
A: Low to moderate toxicity
B: Partially released and dissipating
C: Small quantity solid or liquid leak
D: A migrating vapor of low toxicity and quantity and people are safer indoors than outside

A
B
Explanation:
ERP, Hazardous Materials
B. Totally released and dissipating
9.5.5 C 2
* Sheltering-in-place is also the preferred alternative when the release of hazardous materials can be rapidly controlled at the source
9.5.5 C 5
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Question 7:
Two Battalion Chiefs discussing the Department’s self-mutual policy for firefighters were able to identify which incorrect comment made during their discussion?
A: Battalions shall notify the Office of Staffing Assignment (OSA) by telephone of all self-mutuals granted.
B: Battalions shall verify the Citywide Staffing Level on the day before the requested tour by contacting OSA by telephone, no sooner than 1200 hours.
C: Firefighters shall only be permitted to link a payback self-mutual tour with a regularly scheduled work tour (24 hours) when assignments for both tours are within the same Battalion.
D: Requests for self-mutual/off will only be permitted for tours when the applicant’s regularly assigned group is scheduled to work. Requests for self mutual/repayment will be permitted only when applicant’s regularly assigned group is not scheduled to work.

A

C
Explanation:
Firefighters shall only be permitted to link a payback self-mutual tour with a regularly scheduled work tour (24 hours) when assignments for both tours are within the SAME or ADJOINING COMPANY.
*Otherwise, portal to portal OT and ARs will result.
PAID 3-94 2.1.3, 2.2.3, 4.5 - 4.7

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Question 8:
The BC en-route to a Buckeye Pipeline 9000 Dummy Box alarm shall ensure certain procedures are followed. Choose the incorrect procedure.
A: Ascertain from the dispatcher if a full response has been provided. If it has not then one shall be requested
B: Ascertain from the dispatcher whether or not the regular assigned units are responding
C: If other than the regularly assigned units are responding, request the dispatcher to contact them to ascertain if they have shut-off wrenches, UAAC’s, and Instruction Cards
D: If units do not have shut-off wrenches, UAAC’s, and Instruction Cards, the BC en-route shall have units to return to quarters to pick up the shut-off wrenches, UAAC’s, and Instruction Cards

A

D
Explanation:
The dispatcher shall special call a designated alternate unit to cover that assignment
AUC 149 sec 7.2
***CONFLICT- Any unit special called to a pipeline box, 9000 series, which does not have the special wrenches, Assignment and Instruction cards, and map shall respond to the quarters of the NEAREST unit so equipped and secure this equipment at the housewatch area. 4.8
Since you’re studying for BC, we felt choice D is more pertinent, but be aware of the conflict.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Question 9:
Members studying for the upcoming chiefs exam were reviewing air pressurized standpipe systems, which are required in buildings under construction greater than 75 feet and buildings undergoing demolition with an existing standpipe. They were correct in all statements made except?
A: To use an air pressurized system at a fire operation the air pressure must be released from the system prior to uncapping the siamese and supplying it with water
B: A 2 1/2” manual air release/drain valve (usually a standard outlet) is required to be installed immediately adjacent to the siamese connection
C: Remove the manual air release valve cap and open the valve fully
D: The number of air release valves is required to be such that air pressure shall be released in no more than 5 minute

A
D
Explanation:
Engine Ops Chapter 9, Addendum 2
A. 2.1
B. 2.1
C. 2.2
D. The number of air release valves is required to be such that air pressure shall be released in no more than 3 minutes. 2.2
*Fairly New Material 1/28/2015
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Question 10:
You, the Battalion Chief, go 10-84 at the intersection of Broadway and Main street for a report of a manhole fire. After several minutes, you determine operations at this incident are within the capability of a single unit to wait on scene for the arrival of the utility emergency crew. However, as you are leaving the scene, the dispatcher gives you an ETA from the utility company of one hour. Based on this ETA, you now may order one of the four following options. Choose the incorrect option.
A: The unit remaining on the scene may respond to assigned alarms received via department radio; one member shall be left at the scene
B: One member shall be left at the scene and the unit shall return to quarters. Battalion Chief of the incident shall provide relief for members
C: When a member is left at the scene, the company officer shall at frequent intervals contact the dispatcher for re-notification of the utility company
D: The manhole shall be protected by traffic cones and tape, and units placed in service

A

B
Explanation:
Company officers shall provide relief for members
These 4 options are available if the expected time of arrival (emergency crew) is more than 30 minutes
This was on the last BC exam
Also know the procedure for multiple incidents within an area (BC shall provide for necessary relief of units or members)
AUC 180 sec 2.6 and 2.7

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
Question 11:
MEGA HIGH RISE CIDS CARD... MEGA-80 STY-200X100 CL1-RETAIL FLS 1-10/ COMM 11-45/RES 46-80–A ELEV BANK SVS FLR 1-10/B 10-45/C 45-80/D SVCE ELEV FLR 1-45 – ACCESS STAIRS FLRS 17-23 & 30-37  Arriving as the 3rd Battalion chief assigned on the transmission of the 10-76 you make your way into the lobby after not receiving a designation from the dispatcher.  Which role are you likely to be assigned according to specific tasks listed in Hi Rise for the 3rd & 4th Arriving Battalion Chiefs? ****(1)Fire Sector Supervisor. ****(2)Attack Leader. ****(3)SAE Group Supervisor. ****(4)Attack Group Supervisor. ****(5)Staging Area Manager
A: 1,2 & 4 only
B: 2,3 & 4 only
C: 2,3 & 5 only
D: 3,4 & 5 only
A

B
Explanation:
*Hi Rise Office Buildings 6.5.1 & 5.5.4
B is Correct
1 – Fire Sector – Second Arriving BC
2 – 3rd or 4th BC may be assigned to operate under the direction of the Fire Sector Supervisor or Branch Director. These may be assigned as attack leader (under Fire Sector Supervisor) or Attack Group/Sector Supervisor under a branch director. 5.5.4
3 – The position of SAE Group Supervisor may be staffed by the 3rd or 4th arriving BC. 6.5.1
4 – Same as 2
5 – Staging area established outside of the building. Separate from Forward Staging Area inside. No specific designation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Question 12:
Power backup for the NYC Transit Subway Repeater System provides a minimum of ___ hour/s of protection in the event of a power outage.

A: 1

B: 2

C: 4

D: 10

A

Explanation:
The 4 hours is at continuous repeater operation, therefore, the actual protection can be greater than 4 hours.
AUC 207 Add 16 3.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
Question 13:
During a Hurricane and/or a Severe Storm Emergency, companies located in a flood area will be relocated to Host Companies or Dispersal sites. When relocating companies to a dispersal site, a chief officer will visit the dispersal site when?
A: At least once each tour
B: Once a day
C: Once every two days
D: Radio contact only is suffice
A

A
Explanation:
AUC 159 page 15
Sec 5.3.8 Units located at dispersal sites (a site other than a firehouse) shall be visited at least once during each tour by a Chief Officer. When not practicable, telephone contact shall be established.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Question 14:
When weather conditions indicate that a severe snow storm is likely to strike NYC, the FDNY has developed an operational plan, which is divided into two phases; Phase A (activation)and Phase B (implementation). During Phase B (implementation) Battalion Chiefs shall report to Division headquarters at 3 hour intervals 4 pieces of vital information. Choose the incorrect piece of information.
A: Side streets which are impassable
B: Percentage of response area impassable
C: Specific large areas or special hazards in accessible
D: Actions taken to alleviate conditions

A

A
Explanation:
Main arteries which are impassable
AUC 200 5.3.8.A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Question 15:
Hoseline placement at private dwelling fires can be tricky. Which of the following statements is incorrect?
A: The decision to reposition the first hoseline from the 1st floor into the cellar through an exterior entrance can only be made by an Acting Chief Officer/Chief officer.
B: When operating a hoseline to extinguish fire on the exterior of a building, units should sweep the stream across the face of the building, starting at the bottom to extinguish the main body of fire.
C: Whenever two hoselines are stretched and operating, a 3rd hoseline will be positioned and charged at the front of the fire building and operated as ordered by the IC.
D: For a cellar fire, if the 1st line will be repositioned, ladder company members operating on the first floor must be withdrawn before line is repositioned.

A
B
Explanation:
A. Private dwellings Chapter 3 (2.7.4) 
B. Sweep the stream across the face of the building, starting at the top, so the water cascades down the exterior.  Chapter 3 (6.3)
C. Private Dwellings (2.9, 3.3, 4.3) 
D. Private Dwellings (2.7.4)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Question 16:
Officers/Supervisors have many responsibilities when it comes to the Department’s EEO Policy. Which statement below is incorrect?
A: Officers must familiarize themselves with the Complaint Procedure in the event complaints are filed through them or E. E. O. related incidents witnessed by the Officer.
B: Officers are to review with members the Fire Commissioner’s Policy Statements on Sexual Harassment and Equal Employment Opportunity regarding harassment/discrimination and retaliation.
C: Officers shall inform all members of Federal, State and New York City Laws regarding harassment/ discrimination and retaliation.
D: Officers shall be available to discuss with any member matters that can affect an individual’s work performance, including harassment, discrimination and/or retaliation of any kind, only in a public firehouse setting. Officers shall never discuss these matters with members confidentially.

A

D
Explanation:
Officers will be available to discuss with any member matters that can affect an individual’s work performance, including harassment, discrimination and/or retaliation of any kind, in a location where they are free to speak confidentially without interruption, when and where possible.
TB EEO 5.4, 5.6-5.8

17
Q

Question 17:
In some situations, certain technical or response advice is needed when managing an electrical emergency where Con-Edison is not on scene. In these situations, Chief Officers at the scene can call the Shift Manager at the Borough Electric Control Center. Some of these situations include all of the following except?
A: Fire condition becomes more severe than originally reported
B: Dangerous CO conditions in surrounding properties
C: Additional manholes or equipment showing activity
D: Sensitive or high-profile occupancy such as a Con-Edison Substation

A

D
Explanation:
Con-Edison Substations do not fall under the jurisdiction of the Electric Control Center. In this situation, the Chief should contact the Con-Edison Substation Shift manager
AUC 180 add 1

18
Q

Question 18:
MEGA HIGH RISE CIDS CARD… MEGA-80 STY-200X100 CL1-RETAIL FLS 1-10/ COMM 11-45/RES 46-80–A ELEV BANK SVS FLR 1-10/B 10-45/C 45-80/D SVCE ELEV FLR 1-45 – ACCESS STAIRS FLRS 17-23 & 30-37 You draw the assignment of the SAE Group Supervisor for the fire on the 34th floor. The elevators have been recalled and are staffed and waiting in the lobby. Based on the CIDS, which elevator bank are you using and on which floor are you establishing the SAE Post?
A: Take the B bank of elevators to the 30th floor & establish the SAE post on 39th floor
B: Take the A bank of elevators to the 28th floor & establish the SAE post on 46th floor
C: Take the D bank of elevators to the 45th floor & establish the SAE post on 45th floor
D: Take the C bank of elevators to the 46th floor & establish the SAE post on 46th floor

A

Explanation:
Hi-Rise Office Buildings
D is correct – If possible, the SAE group supervisor shall choose a location on a floor which is not serviced by the same bank of elevators as the fire floor and at least 5 floors above the fire floor. The B & D banks of elevators service the fire floor. The 45th floor is serviced by elevators that service the fire floor. The C bank to 46th floor passes all the criteria. 6.5.2C

19
Q

MEGA HIGH RISE CIDS CARD… MEGA-80 STY-200X100 CL1-RETAIL FLS 1-10/ COMM 11-45/RES 46-80–A ELEV BANK SVS FLR 1-10/B 10-45/C 45-80/D SVCE ELEV FLR 1-45 – ACCESS STAIRS FLRS 17-23 & 30-37

Question 19:
REFER TO THE MEGA HI-RISE CIDS CARD... Once you establish the SAE post at this fire, you will need units to support search operations for your sector.  How many units will you require (minimum) to cover search operations in the sector?
A: 5
B: 7
C: 9
D: 11
A

C
Explanation:
*Hi Rise Office Buildings.
C is correct – 6.3.6C – At least 3 & 2 shall be at the forward staging for assignment to the fire sector. The SAE group will require at least one unit for every 5 floors to be covered. Fire sector is floors 34 & 35. Floors 36-80 require units for search. 9 units to cover 45 floors.

20
Q

Question 20:
As a chief in charge of dewatering operations, all of the following correct procedures should be adhered to except?
A: The total number of units committed to dewatering operations should not reduce the overall availability of Engine and Ladder Companies below 75%
B: Incident Commanders must use discretion when committing more than 2 engines to a dewatering operation
C: Assignment of units above a first alarm assignment for dewatering operations must be approved by a DC
D: During a severe storm, units should not be committed to dewatering operations except where major safety and dangerous traffic problems can be alleviated by immediately beginning the dewatering of major streets and highways that have been flooded by the storm

A

B
Explanation:
B. More than a first alarm assignment
AUC 159 add 9 sec 2.3 and 2.4
D. This choice is correct as written, but just a bit of further info:
During a severe storm, units should not be committed to dewatering operations EXCEPT in the following cases:
Where lives are endangered, such as, but not limited to; hospitals, nursing homes, and similar type occupancies.
Where failure to dewater creates a serious fire hazard, such as; flood or rising water in close proximity to live electrical equipment or service, which cannot be disconnected safely.
Where extensive property damage can be averted with a reasonable commitment of resources.
Where major safety and dangerous traffic problems can be alleviated by immediately beginning the dewatering of major streets and highways that have been flooded by the storm.

21
Q

Question 21:
A Deputy Chief informing a newly promoted Battalion Chief of his Division’s policy of response to embassies, consulates and missions was incorrect in which statement?
A: Be aware of all Foreign Embassies, Consulates and Missions within your response area. Administrative units shall ensure all Embassies, Consulates and Missions are entered into the CIDS program.
B: Diplomats are members of foreign missions, delegations, embassies and consulates to the United Nations or United States, their families, and staff.
C: Chief Officers shall evaluate if an enhanced minimum response is required for these facilities, and/or if the response of a Tower Ladder is required on the initial alarm.
D: Consults of foreign nations do not posses Department of State identifications cards, and therefore are not to required to be treated in the same manner as Diplomats.

A

D
Explanation:
Consults of foreign nations do not posses Department of State identifications cards, but they are to be treated in the SAME MANNER as Diplomats.
ABC 1-2010 2.1, 3.1

22
Q

Question 22:
During Phase II “Water Pressure Emergency,” Battalion Chiefs, shall provide the administrative DC, every 2 hours, with the following vital pieces of information received from units under their command. Choose the incorrect piece of information.
A: The number of frozen hydrants
B: The number of hydrants shut down
C: The number of spray caps placed
D: Any areas experiencing dangerously low water pressure that could adversely affect firefighting operations

A
A
Explanation:
The number of illegally opened hydrants
This procedure is written to overcome the illegally opened hydrants during the SUMMER time.
AUC 205 sec 8
23
Q

Question 23:
All the units are in place and Ventilation of the fire area and floors above is becoming difficult. Which of the following statements regarding ventilation of Hi-Rise Office Buildings is correct?
A: All horizontal ventilation tactics shall be controlled, communicated and coordinated by the 1st arriving ladder company officer.
B: The building’s fixed pressurization system must be shut down once the fire floor is determined.
C: If ineffective due to fire conditions, positive pressure fans can be used to augment the fixed pressurization system.
D: Natural vertical ventilation can be accomplished once the fire is extinguished.

A

D
Explanation:
*Hi-Rise Office Buildings.
A – Incorrect – Incident Commander controls ventilation in HR Office buildings. 1st arriving ladder officer controls horizontal ventilation of the fire apartment in HR MD’s. 6.3.8
B – Incorrect – IC shall continue operations with the system on 6.3.8B.
C – Incorrect – Fixed pressurization systems should not be augmented by positive pressure FD fans. 6.3.8B
D – Correct 6.3.8D.

24
Q

Question 24:
A BC was incorrect when he stated which tactical consideration regarding “two-story” taxpayers?
A: A small hall on the second floor may mean roof girders and a deep cockloft.
B: Preventing the spread of fire to the upper floor and cockloft will require the proper placement of many hoselines.
C: Retain command of the first floor to save the second floor.
D: Completely ladder the second floor. Utilize portable ladders.

A

A
Explanation:
A) A large hall on the second floor may mean roof girders and a deep cockloft.
Taxpayer 9.1.5-9.1.6

25
Q

Question 25:
Select the incorrect statement made in reference to the FireIce Dry-Chem extinguishing agent.
A: When Chief Officers wish to employ the FireIce extinguishing agent at the scene of a manhole fire, they shall simultaneously request a Con-Ed supervisor and FireIce unit
B: FireIce shall only be applied by trained units
C: A Chief Officer may order the application of FireIce prior to the arrival of a Con-Ed Supervisor
D: The objective is to enable Chief Officers operating at a 10-25-1 or 10-25-4 incidents the opportunity to suppress fires prior to the utility company arrival at the scene

A

D
Explanation:
10-25-1 and 10-25-2
AUC 180 add 2 sec 7

26
Q

Question 26:
BC Waterflow joined the impromptu critique once the fire was under control adding commentary about the confusion related to Pumping operations at the Mega Hi-Rise fire. Which statement made relative to pumping was CORRECT?
A: High pressure pumping can be implemented pending the arrival of a BC to control the operation.
B: 3rd Stage engines are the preferred choice for pumping operations over 600 psi.
C: Pressures exceeding 500 psi require the use of 3rd Stage engines.
D: Two supply lines can be connected to a single siamese during normal and high pressure pumping operations, but not 3rd stage pumping operations.

A

A
Explanation:
*Engine Operations Chapter 9 Addendum 1
A is correct – 3.1 last bullet point pg 3.
B – Incorrect – 3rd stage preferred for pumping operations over 500 psi. 4.2
C – Incorrect – Pressures exceeding 600 psi require the use of 3rd stage engines. 4.1
D – Incorrect – When only one building siamese is available, stretch the second supply line to the first floor outlet. Do not connect two high-pressure supply lines to a single building siamese connection. 3.3

27
Q
Question 27:
A chief officer in charge of a rescue task force during a severe storm should know the depth of the water to be crossed by first line apparatus should not exceed what amount?
A: 8 inches
B: 10 inches
C: 15 inches
D: 18 inches
A

D
Explanation:
50 inches for FDNY Hi-Axle vehicles
AUC 159 sec 5.4.3

28
Q
Question 28:
Dunn uses the word façade as a general term for the front of the building, and may include a parapet wall, a marquee, a canopy, and a cornice. Which of the following contributes to the spread of fire?
A: Cornice
B: Canopy
C: Marquee
D: Parapet
A

A
Explanation:
Ch 4 p.63
A. FFs should be concerned with horizontal spread from one end of the building to the other via the cornice
B. the canopy has many connection points and has a greater chance of collapse than a marquee. The most dangerous canopy is a metal or wood shed suspended over a truck loading area covered with tar paper
C. the marquee beam goes through a parapet wall and is connected to roof or floor beams behind the façade
D. a parapet wall often supports a marquee, canopy, or cornice. This is an unstable structure supporting an unstable structure

29
Q

Question 29:
The incorrect tactic used at brush fires can be found in which choice?
A: Initial attack operations should concentrate on mobility
B: Engine companies on the first alarm are to hook up to hydrants to establish a positive water source
C: Consider wetting down unburned area ahead of the fire
D: After exposures are protected, heavy reliance should be placed on the use of Indian Pumps, brooms, and booster lines from BFUs

A

B
Explanation:
Avoid hooking up to hydrants, except to protect exposures
AUC 151 sec 5.4

30
Q

Question 30:
You, the BC, have just reported to the predetermined ICP located at 500 Food Center Drive, for an Iroquois Pipeline incident/emergency. Inside this sheltered environment you will find certain items to assist you in conducting initial operations. Choose the incorrect item.
A: Cell Phone
B: Emergency contact telephone numbers
C: special wrench
D: Wind sock and maps of the pipeline run and facility

A
A
Explanation:
Hard wired phone
Remember, Except in the event of immediate threat to life or property, no valves should be opened or closed without the approval of the FDNY IC in consultation with Con Ed/Iroquois personnel
AUC 150 sec 4
31
Q

Question 31:
Any officer at the scene of an out-of-service fire protection system should know that a Battalion Chief SHALL be requested to respond in each case below except in which choice?
A: Occupancies with a large life hazard.
B: Occupancies with a large property value.
C: Any place of worship.
D: If sprinkler head replacement is considered.

A

C
Explanation:
Occupancies that have a large life hazard, large property value, or if sprinkler head replacement is considered a Battalion Chief shall be requested to respond.
BISP Ch 5 Ref 1.1 4.2 Note

32
Q

Question 32:
The importance of properly marking vacant buildings cannot be overstated. Of the following choices, which is incorrect?
A: All vacant buildings must be identified and marked with the same symbol, to identify them as vacant buildings.
B: Dimensions of markings should be 18” X 18”, and with lines of 2” in width.
C: Markings should be in lime-green reflective paint.
D: The primary marking shall be made alongside the front entrance at a height in line with the area directly above entrance. If the building has more than one entrance or other likely point of entry, additional markings may be made at other locations (rear or side entrance, roof bulkhead, etc.).

A

C
Explanation:
Markings should be in LIME-YELLOW reflective paint.
BISP Ch 5 Ref 4.1 4.1-4.4

33
Q

Question 33:
All areas of New York City may not be equally affected by adverse weather or street conditions. Deputy Chiefs shall evaluate weather conditions in their administrative districts. When required, Battalion Chiefs will monitor local conditions and report findings to their Divisions. Which condition below would NOT warrant a 10-51?
A: Hazardous road conditions caused by icy roads.
B: Snow accumulations which have an impact on traffic, curbside parking, or the ability of Fire Department units to respond.
C: Wind Chill Index (WCI) 25 or less and Heat Index (HI) 100 or higher.
D: Heavy rain coupled with high winds.

A

C
Explanation:
B) Note: Light snow with little accumulation would not normally be a factor in canceling activities. Lingering accumulations would have to be evaluated for impact.
Wind Chill Index (WCI) 15 or less and Heat Index (HI) 105 or higher.
BISP Ch 3 Add 3 4

34
Q

Question 34:
Any premises in or upon which flammable and combustible liquids are received by marine vessels, watercraft, pipelines, tank cars or cargo tanks and which are stored or blended in bulk for the purpose of distributing such liquids by marine vessels, watercraft, pipelines, tanks cars, cargo tanks or containers shall have fire protection systems color-coded. All of the following are correct except?
A: Standpipe and/or yard hydrant systems: Piping, valve bodies and handles, hydrants and hydrant or hose houses - red with contrasting white bands. Fire Department connections: – red
B: Automatic sprinkler systems (wet or dry): Piping and valve bodies and handles - red with contrasting bright green bands. Fire Department connections - red with green caps.
C: Nonautomatic sprinkler systems (including fog spray systems): Piping and valve bodies and handles - red with contrasting aluminum bands. Fire Department connections - aluminum.
D: Carbon dioxide extinguishing systems: Piping and valve bodies and handles - red with contrasting black bands.

A

D
Explanation:
Carbon dioxide extinguishing systems - Piping and valve bodies and handles - red with contrasting BROWN bands.
Steam extinguishing systems - Piping and valve bodies and handles - red with contrasting BLACK bands.
BISP Ch 3 Add 2 IG 11 p150

35
Q
Question 36:
Questions 37-40 are “In-Basket” for this exam:BISP Ch 3a2_ig_08 Residential Occupancies bi_05_ref_3_2 Carbon Monoxide Detectors PAID 77-1-EEO Complaint Process ABC 2009-6-Battalion Smoke Alarm And Battery Distribution Program Mega residential hi-rises are popping up in NYC at an alarming rate where getting water to an upper floor will be a challenge for our units. A high pressure engine is best described in which of the following choices?
A: E28W
B: E28H
C: E28P
D: E28S
A
C
Explanation:
Comm ch 2 page 2-37
A- Water-Ice Rescue Unit
B-Haz-Mat Tech Unit
D- Communications Unit
36
Q

Questions 37-40 are “In-Basket” for this exam:BISP Ch 3a2_ig_08 Residential Occupancies bi_05_ref_3_2 Carbon Monoxide Detectors PAID 77-1-EEO Complaint Process ABC 2009-6-Battalion Smoke Alarm And Battery Distribution Program

Question 37:
There are many options to resolve EEO issues in the Fire Department environment. Of the following choices, which is incorrect?
A: Complainant or respondent can file a written request for mediation.
B: The EEO Officer shall attempt to mediate the dispute with the parties and to reach an informal resolution of the complaint within ninety (90) working days of receipt of the request for mediation.
C: When a resolution is not agreed upon, and/or the EEO Officer determines that further mediation efforts would be unproductive, the EEO Officer shall issue to the parties a written notice confirming termination of mediation and informing the complainant(s) of his/her right to request an investigation of the complaint.
D: The Fire Commissioner will make a final decision regarding the complaint upon completion of an EEO investigation.

A

B
Explanation:
A. Complainant or respondent can file a written request for mediation. sec 11.1
B. The EEO Officer shall attempt to mediate the dispute with the parties and to reach an informal resolution of the complaint within forty-five (45) working days of receipt of the request for mediation.
PAID 1-77 10.1, 10.2, 10.6, 11.3

37
Q

Questions 37-40 are “In-Basket” for this exam:BISP Ch 3a2_ig_08 Residential Occupancies bi_05_ref_3_2 Carbon Monoxide Detectors PAID 77-1-EEO Complaint Process ABC 2009-6-Battalion Smoke Alarm And Battery Distribution Program

Question 38:
Under the Battalion Smoke Alarm and Battery Distribution Program, the recipient of a smoke alarm must complete an “Affidavit of Receipt.” This completed affidavit must be faxed by the Chief who distributed the smoke alarm to?  
A: The Division
B: The Borough Commander
C: The Fire Safety Education Unit
D: Fire Prevention
A

C
Explanation:
The Fire Safety Education Unit will forward a replacement smoke alarm upon receipt of affidavits. Replacement batteries can be obtained by calling the Fire Safety Education Unit.
ABC 6-2009 2.4

38
Q

Questions 37-40 are “In-Basket” for this exam:BISP Ch 3a2_ig_08 Residential Occupancies bi_05_ref_3_2 Carbon Monoxide Detectors PAID 77-1-EEO Complaint Process ABC 2009-6-Battalion Smoke Alarm And Battery Distribution Program

Question 39:
According to the 2014 Fire Code, which statement is incorrect when it comes to college and university dormitories?
A: It shall be unlawful to store portable electric space heaters in Group R-1 college and university dormitories.
B: It shall be unlawful to store or use portable halogen floor lamps in Group R-1 college and university dormitories.
C: It shall be unlawful to store or use incense or similar open-flame producing items in Group R-1 college and university dormitories.
D: It shall be unlawful to store or use candles or similar open-flame producing items in Group R-1 college and university dormitories.

A

A
Explanation:
It shall be unlawful to USE portable electric space heaters in Group R-1 college and university dormitories.
BISP Ch 3 Add 2 IG 8

39
Q

Questions 37-40 are “In-Basket” for this exam:BISP Ch 3a2_ig_08 Residential Occupancies bi_05_ref_3_2 Carbon Monoxide Detectors PAID 77-1-EEO Complaint Process ABC 2009-6-Battalion Smoke Alarm And Battery Distribution Program

Question 40:
In Group E, I-2 and I-4 occupancies, carbon monoxide detectors with built-in sounder bases shall transmit a signal to a central supervising station and shall be permitted to initiate an audible and visual supervisory alarm at a constantly attended location. Of the following choices, which is not in compliance with the building code in relation to these occupancies?
A: Carbon monoxide detectors with built-in sounder bases shall be installed within any room containing carbon monoxide-producing equipment.
B: Carbon monoxide detectors with built-in sounder bases shall be installed within any kitchen or laboratory containing carbon monoxide-producing equipment.
C: Carbon monoxide detectors with built-in sounder bases shall be installed in corridors on the story where carbon monoxide-producing equipment unit is located, as well as one story above and one story below.
D: Carbon monoxide detectors with built-in sounder bases shall be installed in all corridors on the story where enclosed parking is located, as well as one story above and one story below.

A

B
Explanation:
Carbon monoxide detectors with built-in sounder bases shall be installed within any room containing carbon monoxide-producing equipment. Exception: Kitchens or laboratories.
BISP Ch 5 Ref 3.2 5.5