Truck Book 1 Flashcards
When using the acronym SLICERS what does the L Stand for?
Locate the Fire
P. 30
What is the minimum distance that shall be maintained between the aerial device and wires at all times?
10 Feet
P. 19
Priority positioning for a tower ladder for a strip shopping center fire is where?
Side Alpha
P. 25
What is the minimum staffing for truck companies in Northern Virginia?
An officer, Driver, and one firefighter.
P. 31
The factors that influence strategy are the incident priorities often expressed in what acronym?
LIP
P. 32
Knox Box Systems, Supra Key Systems, and Lock-Box Systems are all examples of what?
Rapid key entry systems
P. 36
When should truck companies shut off gas and electric on a fire ground?
As soon as possible
P. 37
What should be considered to penetrate a deep-seated fire during overhaul operations?
Class A or Class B foam at 1%
P. 40
The minimum size wood for support members in conventional wood roof construction is?
2”x 6”
P. 42
A wood framed structure is an example of what type of building construction?
Type V
P. 45
What is an example of a Type IV Building construction
Heavy Timber
P. 54
What are the 2 major concerns with green roofs on a structure?
The added Dead weight and impact of vertical ventilation
P. 68
When firefighters create openings, or break windows, to gain access from the exterior position to carry out a primary search in a high-risk area of the structure
Vent for search
P. 4
How many feet is the optimal setback for using a tower ladder for ground / below grade operations?
30 feet
P. 13
What is the collapse zone for a building that is 100 feet in height?
150 feet
P. 19
What is the highest Tactical priority on a fire ground?
Life safety
Members should not be on the roof structure where fire is suspected or confirmed in the truss area without __________ ?
Being Independetly Supported
P. 43
Traditional lumber joist fail at _______ time frame, while engineered floor joists when exposed to fire fail at_______ time frame.
16 minutes / 6 minutes
P. 44
What is the tool of choice for rapid vertical ventilation?
Chain Saw
Bridge truss roofs are primarily used on what type of buildings?
Commercial and Warehouse
P. 58
The area around a building ,at least one and one half times the height of the building involved is know as what?
Collapse Zone
P. 19
What is the term used for controlled removal of smoke and heat in concert with the engine company getting water on the seat of the fire?
Coordinated Ventilation
P. 2
A small cut used to determine conditions under the roof
Inspection Cut
P. 2
What does the acronym L.I.P. Stand for ?
Life Safety,Incident Stabilization,Property Conservation
P. 3/ 32