TB 94, asbestos Flashcards
a permit for asbestos abatement is good for ? days from the date of issue and only for the specific project for which it is isssued.
180
the dept. implemented a program which requires a Div. ? permit, and an onsite inspection of all asbestos abatement projects (over ? sq ft. ) in the city of LA.
100
in hi rise building that have had the insulation removed from structural steel, it is required to be replaced within ? days.
15
asbestos, the number of consecutive floors permitted for asbestos abatement in a multi story building where 25 % of the floor is undergoing abatement?
no two consecutive floors simultaneously
in containment areas greater than 1000 sq ft. a minimum of two viewing ports shall be provided which allow the greatest possible degree of the containment area from an uncontaminated site. viewing ports shall be at least ? in size.
18 x18 inches
in abatement areas protected by an approved functioning automatic fire detection system connected to the buildings central alarm system, a fire watch may be discontinued? after the completion of each work day.
30 minutes
if during routine fire prevention or company training an illegal removal project is discovered, it should be reported to?
asbestos abatement inspector
the high rise unit
During in aBestos abatement project, the fire safety watch is required?
When the project is 1000Square feet or more,
until all respring is completed for fire protection coatings been removed,
in the absence of a functioning automatic fire detection system connected to the buildings central alarm system,
during any work requiring an open flame