TB 163, Metro Crenshaw/LAX Construction Phase Flashcards

1
Q

The activation of air monitoring devices on the tunnel boring machine results in?

A

All power shut down in tunnel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The responsibility to verify the brass board an account for all construction workers lies with?

A

Staging

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Tell division will ensure that all emergency operations are discontinued in the tunnel evacuated should the tunnel atmosphere meet or exceed?

A

20 percent LEL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Due to the potential of an incident where access would be made at two or more access points the incident would dictate forming a?

A

Tunnel branch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Allowing rescuers the ability to complete a rescue mission should a non-compromised atmosphere becomes compromised is achieved through?

A

Redundancy and breathing apparatus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If the tunnel atmosphere is determined to be non-compromised, The first and Company me into the tunnel to assist with patient care?

A

As long as the comply with SCB a and self rescue device requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The tunnel boring machine is powered by electric motors that operate hydraulic pumps. Combustibles around machine or limited to

A

Hydraulic oil and lines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly