SOP Timeline Flashcards

1
Q

Takeoff Timeline?

A
  1. webCIS
  2. Preflight Briefing
  3. Board
  4. PSC
  5. PSC callback
    CSM: CC equipment callback hello high + pink light
    CC: Door number, name, EE and SC complete, door OPEN/ARMED/DISARMED (330/380 - pin inserted)
  6. Boarding prep
  7. Preboarding PA
    CSM: CC, please get ready to welcome our customers
  8. Boarding (possibly refuelling)
  9. Pre Door Closure PA
    CSM: CC, prepare for departure
  10. Final Door Closure - STERILE FD COMMENCES
    CSM: CC, the final door is now closed
  11. Door Arming and Crosscheck (stairs or aerobridge removed)
    CSM: CC, ARM doors and cross check
    CSM callback
    CC: DN, N, door ARMED and cross checked
    (CC: DN, N, door problem)
  12. Safety Demo
  13. Final Cabin Check / 2 Person Galley check
  14. Cabin Secure Callback
    CSM callback
    CC: DN, N, cabin (and galley) secured for takeoff
    CSM: CC, commence silent review
    STERILE CABIN AFTER SILENT REVIEW
  15. Takeoff Roll - NO CONTACT COMMENCES + STERILE CABIN COMMENCES (commences after callback)
  16. AC Airborne - NO CONTACT ENDS
  17. Seatbelt Sign Off - STERILE FD ENDS + STERILE CABIN ENDS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Anticipated Turbulence?

A
  1. CSM talks to CC - CC secures cabin
  2. Seatbelt sign illuminates 1 min before turb - take jumpseat
  3. Seatbelt PA
    FC: All passengers and crew be seated and fasten seat belts
  4. CSM callback
    CC: DN, N, seated and secured
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Unanticipated Turbulence?

A
  1. Seatbelt PA
    FC: All passengers and crew be seated and fasten seat belts
    CC have 1 min to secure cabin and return to jumpseat
  2. CSM callback
    CC: DN, N, seated and secured (any other relevant info)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Unanticipated Turbulence (Immediate Safety Hazard)?

A
  1. Seatbelt PA
    FC: All passengers and crew be seated and fasten seat belts IMMEDIATELY
    CC lock carts and secure in nearest seat or wedge in aisle
  2. CSM callback
    CC: DN, N (and cabin report)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Landing Timeline?

A
  1. Prepare cabin PA (10 mins before landing) - STERILE FD COMMENCES
    FC: CC, prepare the cabin for landing
  2. Seatbelt Sign On STERILE CABIN COMMENCES
    CSM: All customers and crew must now be seated for landing with their seatbelt fastened
  3. Final Cabin Check / 2 Person Galley check (1 min)
  4. CSM callback
    CC: DN, N, cabin (and galley) secured for landing
    CSM: CC commence silent review (stay on line till callback ends)
  5. Exit Sign Illuminates (Landing gear extends) - NO CONTACT COMMENCES
  6. AC Stops / Turns Off Active Runway - NO CONTACT ENDS
  7. Disarm Door PA
    FC: CC DISARM doors and crosscheck
    CSM Callback
    CC: DN, N, door DISARMED and cross checked
    (DN, N, door problem)
  8. AC at Terminal (Doors disarmed and seatbelt signs off) - STERILE FD ENDS + STERILE CABIN ENDS
  9. Disembarkation Position
  10. Inspect all Baggage Removed / SC / Pax Have Left AC
How well did you know this?
1
Not at all
2
3
4
5
Perfectly