What are the Rx Trip signals associated with NIs?
- SR High Flux
- IR High Flux
- PR High Flux, Low Setpoint
- PR High Flux, High Setpoint
- PR High Positive Rate
- Overtemp delta T
- Overpower delta T
What is the Setpoint, Coincidence and Interlock associated with the SR High Flux Rx Trip?
90,000 cps and rising on 1/2 source ranges
P-6
What is the Setpoint, Coincidence and Interlock associated with the IR High Flux Rx Trip?
22.5% (20%) RTP and rising on 1/2 intermediate ranges.
P-10
What is the
Setpoint, Coincidence and Interlock
associated with the PR High Flux, Low Setpoint Rx Trip?
20% RTP and rising on 2/4 power ranges
P-10
What is the Setpoint and Coincidence associated with the PR High Flux, High Setpoint Rx Trip?
107% RTP and rising on 2/4 power ranges
What is the Setpoint and Coincidence associated with the PR High Positive Rate Rx Trip?
4.5% and rising in 2 secs on 2/4 power ranges
What is the Setpoint and Coincidence
associated with the Overtemp delta T Rx Trip?
Variable setpoint as displayed on control board meter
2/4
What is the Setpoint and Coincidence associated with the Overpower delta T Rx Trip?
Variable setpoint as displayed on control board meter
2/4
What are all the Rx Trip Signals?
SR High Flux
IR High Flux
PR High Flux, Low Setpoint
PR High Flux, High Setpoint
PR High Positive Rate
Overtemp Delta T
Overpower Delta T
Pressurizer Pressure, High
Pressurizer Pressure, Low
Pressurizer Water Level High
RCS Loss of Flow
UV- RCP Busses
Underfrequency - RCP Busses
RCP Breaker Position
SG Water Level, Low-Low
SG Water Level Low w Feed Flow < Steam Flow
Any SI Signal
Turbine Trip
Manual
What is the Setpoint and Coincidence
associated with the Pressurizer Pressure High Rx Trip?
2385 # and rising on 2/4 pressurizer pressures
What is the
Setpoint, Coincidence and Interlock
associated with the Pressurizer Pressure Low Rx Trip?
1950# and lowering on 2/4 pressurizer pressures
P-7
What is the Setpoint, Coincidence and Interlock associated with the Pressurizer Water Level High Rx Trip?
92% and rising on 2/3 pressureizer levels
P-7
What is the Setpoint, Coincidence and Interlock associated with the RCS Loss of Flow Rx Trip?
91% and lowering
> P-8 2/3 on 1/4 Loops
< P-8 > P-7 2/3 on 2/4 Loops
What is the Setpoint, Coincidence and Interlock associated with the UV- RCP Busses Rx Trip?
88 Volts indicated and lowering on 1/2 on 2/4 busses
P-7
What is the Setpoint, Coincidence and Interlock associated with the Underfrequency - RCP Busses Rx Trip?
58.2 Hz and lowering on 1/2 on 2/4 busses
P-7
What is the Setpoint, Coincidence and Interlock associated with the RCP Breaker Position Rx Trip?
Open auxiliary switch on 2/4
P-7
What is the Setpoint, Coincidence and Interlock associated with the SG Water Level Low-Low Rx Trip?
5% (22%) and lowering on 2/3 on 1/4 SGs
What is the Setpoint, Coincidence and Interlock associated with the SG Water Level Low w Feed Flow < Steam Flow Rx Trip?
15% (26%) and lowering on 1/2 channels on 1/4 SG
AND
0.71E6 (1.47E6) lb/hr on 1/2 on same SG
What is the Setpoint, Coincidence and Interlock associated with the Turbine Trip Rx Trip?
Auto Stop Oil Pressure 800# and lowering on 2/3
OR
Stop Valves 1% and lowering on 4/4
P-8
What are the SI Signals?
- Manual
- Ctmt Pressure High
- Pressurizer Pressure Low
- DP between Steam Lines (1 SG lower than 2 Others)
- SG Pressure Low
What is the Setpoint and Coincidence
associated with the Containment Pressure High SI Signal?
1.0 # and rising 2/3 containment pressures
What is the Setpoint, Coincidence and Interlock associated with the Pressurizer Pressure Low SI Signal?
1775 # and lowering 2/3 PZR Pressures
Manual Block with P-11
What is the Setpoint and Coincidence associated with the DP between Steam Lines SI Signal?
100 psid 2/3 on any steam line
What is the Setpoint, Coincidence and Interlock associated with the SG Pressure Low SI Signal?
500 # and lowering 1/1channels on 2 SGs
Manual Block with P-12
What are the signals for Containment Spray?
- Manual
- Containment Pressure High-High
What is the Setpoint and Coincidence associated with the Containment Pressure High High Containment Signal?
2.8 # and rising on 2/4 containment pressures
What is special about U1’s containment pressure high-high signal?
There is a delay of 233 secs after reaching set point. The white lights will be on during delay period
What signals give a containment isolation phase A?
- Manual
- SI
What signals give a containment isolation Phase B?
- Manual
- Containment Spray
What signals can give a Steam Line Isolation
- Manual
- Containment Pressure, High-High
- High Steam Flow with P-12
- SG Pressure Low
What is the Setpoint and Coincidence associated with the Containment pressure high high SLI signal?
2.8 # and rising 2/4 containment pressures
What is the Setpoint, Coincidence and Interlock associated with the High Steam Flow with P-12 SLI Signal?
1.42E6 (1.6E6) pph at 0%; 1/2 on 2 SGs
Variable with power
NO BLOCK AVAILABLE
What is the Setpoint, Coincidence and Interlock associated with the SG Pressure Low SLI signal?
500# and lowering on 1/1 on 2 SGs
Manual Block w P-12
What signals will give a Turbine Trip and FWI?
- SG Water Level Hi-Hi
- SI
- Rx Trip w Low Tavg (FWI Only)
What is the Setpoint, Coincidence and Interlock associated with the SG Water Level Hi-Hi turbine trip / FWI signal?
67% NR and rising 2/3 level channels on 1 SG
What is the Setpoint and Coincidence associated with the Rx Trip w Low Tavg FWI signal?
Either Rx Trip Breaker open w Tavg < 554*F on 2/4 Loops
What is the Setpoint and Coincidence
associated with the 4 kV Bus Loss of Voltage MDAFP Autostart?
94 (93) V indicated and lowering
2/3 on T11A OR T11D
What is the Setpoint and Coincidence associated with the 4 kV Bus Loss of Voltage MDAFP Valve Actuation?
94 (93) V indicated and lowering
2/3 on BOTH T-buses in SAME Train
What is the Setpoint, Coincidence and Interlock associated with the AMSAC MDAFP Autostart?
Feedwater Flow < 25% 3/4 feedwater flows
C-20
What is the Setpoint and Coincidence associated with the SG Water Level Low-Low MDAFP Autostart?
5 (22)% and lowering 2/3 level channels on 1 SG
What is the Setpoint, Coincidence and Interlock associated with the Loss of Both MFPs MDAFP Autostart?
FPT Stop valve closed limit switch 2/2, 1 from each MFP
Ctrl switch MUST be in AUTO
What is the Setpoint, Coincidence and Interlock associated with RCP Bus Undervoltage TDAFP Autostart?
88 V Indicated and lowering on 1/2 on 2 RCP busses
Time Delayed
What is the Setpoint and Coincidence associated with SG Water Level Low-Low TDAFP Autostart?
5 (22)% and lowering on 2/3 level channels on 2 SGs
What is the Setpoint, Coincidence and Interlock associated with AMSAC TDAFP Autostart?
Feedwater flow < 25% on 3/4 Feed flows
C-20
What is the Setpoint, Coincidence and Interlock associated with the CEQ Fan Start?
1.0 # and rising 2/3
Time Delayed
What are the Containment Isolation Purge and Exhaust Signals?
- High Containment Radioactivity Train A
- High Containment Radioactivity Train B
A High Alarm on which rad monitors give a Train A containment isolation purge and exhaust signal?
VRS-1101 (2101)
Area Monitor and ERS-1300 (2300)
SPING Channels (1, 3, 5, 7, 9)
A High Alarm on which rad monitors give a Train B containment isolation purge and exhaust signal?
VRS-1201 (2201)
Area Monitor and ERS-1400 (2400)
SPING Channels (1, 3, 5, 7, 9)
What is the SetpointCoincidence and Interlock associated with the 4 kV Bus Loss of Voltage?
94 (93) V indicated and lowering
2/3 on any 4KV Safety bus
Time Delayed 2 secs
What is the Setpoint, Coincidence and Interlock associated with the 4 kV Bus Degraded Voltage?
113 V indicated and lowering
2/3 on T11A OR T11D
Time Delayed 2 mins (9 secs w SI or Lo-Lo SGWL)
What will cause a RWST Sequence? What is the associated Interlock?
2.5% indicated level and lowering 2/2
Either IMO-910/911 is full OPEN before VCT QMO-451/452 CLOSE