Railway procedures Flashcards

1
Q
Abbreviations
CPS
CTA
HAL
HEX
IP
OLE
RIO
ROLO
SCD
SCR
SPT
TOC
TSS
A
Command planning system
Central terminal area
Heathrow airport limited
Intervention point
Overhead line equipment
Rail incident officer
Rail operations liaison officer
Short circuiting device
Station control room
Signal post telephone
Train operating company 
Technical & service support
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Key organisations in respect of railway operations;

A

Network rail - infrastructure
Train operating companies (TOCs) run the trains, sidings/stations
LUL - depots/sidings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The day to day management has been divided into management companies known as;

SSL -
JNP -
BVC -

A

InfraCo’s

Sub surface lines
Jubilee, northern & picc
Bakerloo, central & vic

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Some hazards associated with railways..

A
Air turbulence 
Stopping distances
Haz mat
Electric power supplies
Residual current
Points - risk of trapping
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Unless earthed conductor may hold residual charge

Who can use a SCD?

A

Trained FRU personnel (in the absence of railway people)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Explain TOPS;

A

Total operations processing system - computer based info;
On coach, Wagon and freight id numbers. Also the location, origination, destination, details of the contents & other rail operators info.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Speeds when trains are run under caution?

A

On long straights - 50mph, sharp turns - as low as 5mph

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

‘From…at…, one injured adult male on southbound track between South Bermonsey, Queens rd and Peckham stations, request traction current isolation and all trains stopped on southbound track, all trains to run at caution on northbound track. Crew bing committed to southbound track. Brigade lookouts deployed at 700 metres. ‘

Brigade lookouts should have;

A

HH radio
Whistle
If dark - light
High vis

Both hands above head to warn approaching trains

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Trackside telephones;

Who do they connect you to?

A

Red telephone on a white background with the word ELECTRIFICATION on it.
Rail operators control

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

During every 7(2)(d) the stations dado communications system must be tested and if the coverage deviates from the status indicated the CM or WM must;

A

Inform the station management
Amend the status sign in the LFB plan box
Inform control

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

LUL things to consider;

A
Liaison with responsible person
Reconnaissance team..
Station plans
Use of control room
IPs
Water supplies
Ventilation systems
Comms links, CCTV, leaky feeder
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The means of local traction current isolation is by the use of the___:

A

Platform headwall telephone, situated at the end of the platform in the direction of train travel

Lift phone to isolate traction- Tunnel emergency lights come on

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

LFB plan box contains;

How to open?

A

2x station plans (command and control BA)
A comms status indicator - (Yellow plastic sign)
A key to adjacent IV points

FB14 key
Or if busticated - L shaped thing, bolt croppers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

JLE - At the head and base of each shaft there’s a phone marked LFB which provides a link to;

A

Line controller at Neasden

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Fire mains are provided at approx ____60m intervals

Ventilation information sheet from the ____?

A

Station control room

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

DLR - Driverless, max speed?

There is someone on board though, a ____?

A

55mph

Passenger service agent - PSA
He holds the key to the safety equipment locker

17
Q

Power supplies
Third rail system
Overhead line equipment
Fourth rail system

A

1200V DC
25000V DC
750V DC