NEM Chapter 094, Full Power Trials Flashcards
1
Q
Periodic test of a cutter’s propulsion plant operated a maximum rated power
A
Full power trial
2
Q
Report of cutter’s full power trial results advises operating personnel and OPCOM, District, Product Line, SFLC, and HQ personnel of the cutter’s ___
A
Current full power capabilities and charactaristics
3
Q
A cutter will forward a satisfactory report of full power trial to SFLC when?
A
First 6 months of accepting new cutter
Within 6 months of a TCTO that affect the full power capabilities of a cutter
4
Q
___ is the reviewing authority for full power trials
A
Product line manager
5
Q
If a cutter is unsatisfactory in its full power trial, then ___
A
The CO shall initiate action to correct deficiencies ASAP