What are 2 NDE methods that are normally used to determine tank bottom corrosion?
- UT and MFL
Min required thickness of the projection of the bottom plate outside the bottom to shell weld ?
0.1”
How far must the plate extend past the bottom to shell per API653?
3/8”
require interval and who for routine inspection
monthly/operator
require interval and who for external inspection
5 years or RCA/4N (lessor) / AI
require interval and who for UT if CR is known
15 years or RCA/2N (lessor) / (not specified)
require interval and who for UT if CR is not known
5 years
require interval and who for internal inspection
10 years w/o safeguard or RPS
initial internal inspection max ?
- 10 years w/o safe guard or RPB
- 20 years with safe guard but no RPB
- 30 years with RPB
subsequent internal intervals?
- 10 years w/o safe guard or RPB
- 20 years with safe guard but no RPB
- 30 years with RPB
When is brittle not a concern? at what stress?
when less than 7000 KSI , no brittle concern
what temp is brittle not a concern?
greater 60F
What thickness is brittle not a concern
less than 1/2”
API651
cathodic protection
Require inspection interval for cathodic?