API 653 Flashcards

1
Q

hydrostatic test for a reconstructed tank is a required?

A

YES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

partial/complete jacking is consider a ….repair or alteration

A

repair

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

simplest type of floating roof

A

PAn type

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

responsible to verify soundness of a roof

A

inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

responsible to evaluating existing tank shell

A

engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

who determine min thickness of a tank

A

inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

who shall visually or otherwise decide which plans is affected by corrosion

A

inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

who shall determine the consequence and acceptability of operating the tank to it max design liquid level

A

owner/operator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

new foundation, changing the levelness of tank if required is reviewed by

A

engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

who is responsible for determine continue in service tank integrity

A

inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

who shall monitor the external condition using a close visual

A

personnel of owner/operator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

who shall perform a follow up action if evidence of leak, shell distortion, insulation system

A

inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

External inspection is given by

A

inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

who determines the extent of UT measurements to determine the rate of corrosion

A

owner/operator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Who shall conduct a visual examination

A

inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

who determine the RBI inspection will not adversely impact surface or ground water beyond …..

A

owner/operator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

who determine the exam to establish CR and ensure they understand the effectiveness of the inspection technique employ

A

owner/operator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

who can establish the subsequent internal inspection using RBI?

A

owner/operator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

who determines the effectiveness of an inspection include examination methods and scope

A

inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

who shall prepare a written report for permanent recording

A

inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

who is responsible to review the inspection findings/recommendation and establish a repair scope

A

owner/operator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

NDE work must be considered in the evaluation of the tank inspection by an

A

inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

all repair work must be authorized by an

A

inspector/engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

who shall approve all specified repair/alteration work and hold points

A

inspector/engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
lapped patch shell repairs are an acceptable form of repair only when specified by the
owner/operator
26
use of welded on patch plates that do not meet the requirement of API653 is permitted if the repair has been review and approved by
engineer
27
lesser thickness of the floor thickness is permitted for weld repairs if review/approved
engineer
28
all reconstruction work must be authorized by
inspector/engineer
29
who will designate inspection hold point
inspector
30
prior to using any alternative heat treatment method a metallurgical review conduct by
engineer/owner/operator
31
The _____ must concur in writing with the PWHT exemption. Also____ must authorize the exemption
engineer / owner
32
who should determine specific requirement to meet their tank bottom integrity needs
owner/operator
33
Who shall with consent of the contractor determine the extent of further examination and repair that may be required
owner/operator
34
repairs shall be review/approved
engineer
35
repair that are approved by engineer must have written consent from
owner operator
36
who shall consider all pertinent variable when exempting a minor shell jacking repair from hydro?
engineer
37
who may use a FFS or other appropriate evaluation methodology based on establish principles and practices to exempt a repair from hydro
owner operator
38
FFS instead hydro used for repair evaluation shall be performed by
engineer
39
who may request a name plate to be attached to a tank meeting requirement list in API653
owner/operator
40
new replacement name plate may be attached under direction of
inspector
41
if measured out of plane settlement exceed the limits , an evaluation may be performed by
inspector
42
tank settlement evaluation should evaluate the settlement expect by
engineer
43
who has the ultimate responsibility for complying with the provision of API653
owner/operator
44
who has the responsibility to establish the limits of responsibility for each party involved in relocating/reconstructing a tank?
owner/operator
45
Who must consider the appropriate NDE method that will be used to evaluate a tank
inspector
46
Who is responsible for directing any inspections in addition to Internal, External, Thickness and routine in-service inspection?
inspector
47
Prior to using any alternative heat treatment method, a metallurgical review conducted by…..
Engineer
48
The____________must concur in writing with the PWHT exemption. Also,__________ must authorize the exemption in writing.
engineer / owner
49
All reconstruction work must be authorized by……..
engineer / operator
50
Who will designate inspection hold points required during the reconstruction process and minimum documentation to be submitted upon job completion?
inspector
51
Who should determine specific requirements to meet their tank bottom integrity needs?
owner/operator
52
Who shall, with the consent of the contractor, determine the extent of further examination and repair that may be required?
owner/operator
53
Repairs shall be reviewed and approved by…..
engineer
54
Repairs that have be approved by engineering must have written consent from…..
owner/operator
55
Who shall consider all pertinent variables when exempting a minor shell jacking repair from hydrostatic testing?
engineer
56
Who may utilize a fitness-for-service or other appropriate evaluation methodology based on established principles and practices to exempt a repair from hydrostatic testing?
owner/operator
57
If utilizing fitness-for-service instead of hydrostatic testing of a repair the evaluation shall be performed by…..
engineer
58
Portions of new bottoms (any or all rectangular plates or large segments of plates) in tanks may be replaced without a hydro test when the subgrade under the new plates is found to be in a condition acceptable to the………
inspector
59
A new Replacement Nameplate may be attached under the direction of……..
inspector
60
Assessment Nameplate may be attached under the direction of………
inspector
61
Who has responsibility to determine the method used to determine the soundness of roof members?
inspector
62
Who is responsible for evaluating existing tank shell?
engineer
63
Who Shall determine the minimum thickness to be used for each shell course?
inspector
64
Who shall visually or otherwise decide which vertical plane(s) in the area is likely to be the most affected by corrosion?
inspector
65
Who shall determine the consequence and acceptability of operating the tank to its maximum design liquid level.
owner/operator
66
Alternatively, if the new foundation is to be constructed up to the bottom, changing the levelness of the tank is not required if reviewed and approved by;
engineer
67
Who shall monitor the external condition of tanks using a "close visual inspection"?
Personnel of Owner/Operator
68
Who shall perform a follow up actions if evidence of leaks; shell distortions; signs of settlement; corrosion; and condition of the foundation, paint coatings, insulation systems is found in a routine inspection?
inspector
69
All tanks shall be given a external inspection by?
inspector
70
Who determines the extent of UT measurements to determine the shell integrity or rate of uniform general corrosion?
owner/operator
71
Who shall review the results of a Cathodic Protection Survey?
owner/operator
72
Who shall assure competency of personnel performing surveys?
owner/operator
73
Who shall supervise or conduct a visual examination?
inspector
74
Who shall review the internal inspection interval and be in compliance with this section within 5 years from date of first publication of API Standard 653, Fourth Edition, Addendum 2, January 2012?
owner/operator
75
Who determines that RBI inspection will not adversely impact surface or groundwater beyond the facility or affect human health or the environment?
owner/operator
76
Who determines that the examination to establish corrosion rates and ensure they understand the effectiveness of the inspection techniques employed for detecting and measuring potential damage mechanisms?
owner/operator
77
Who can establish the subsequent internal inspection interval using risk based inspection?
owner/operator
78
An RBI assessment shall be performed by a team consisting of…..
Inspectors and Engineers
79
Who determines effectiveness of an inspection includes examination methods and scope?
inspector
80
Who shall maintain a complete record file consisting of three types of records, namely: construction records, inspection history, and repair/alteration history?
owner/operator
81
Who shall prepare a written reports for internal and external reports?
inspector
82
Who must concur in writing with taking the hydrostatic testing exemption?
engineer
83
Who must approve all alterations to a tank?
engineer
84
Welder ID records, along with the date and results of the welder’s qualification tests shall be accessible to;
inspector
85
Who shall approve all reconstruction work at the designated hold points and after reconstruction has been completed?
Inspector or Engineer
86
Who shall approve all specified repair and alteration work at the designated hold points and after repairs and alterations have been completed?
Inspector or Engineer
87
Who approves all proposed design, work execution, materials, welding procedures, examination, and testing methods?
Inspector or Engineer
88
Jacking and leveling are usually done in conjunction with, not instead of, replacing damaged plate and welds. In lieu of repairs, a detailed analysis of the settled area may be performed by……..
engineer
89
If weld repairs are made to the bottom-to-shell weld in an area where settlement exceeds the limits referenced in API 653, These additional stresses should be evaluated by the………
engineer
90
Tank settlement evaluation should evaluate the settlement expected at the next inspection by……..
engineer
91
If measured out-of-plane settlement exceeds the applicable limits an evaluation may be performed by _____________to deem if a repair is needed.
engineer
92
Lapped patch shell repairs are an acceptable form of repair for butt-welded, lap-welded, and riveted tank shells, only when specified by the………….
Owner/Operator
93
Who is responsible for determinining the design and product loading for reconstructed tanks?
Owner/Operator
94
For aluminum floating roofs, the pads may be omitted if the______________ approves and new austenitic stainless steel or acceptable non-metallic (e.g., Teflon) spacers are installed to isolate legs from the carbon steel bottom.
Owner/Operator