API653 Chapter 3 Flashcards
what is a breakover point?
the area on a tank bottom at which settlement begins
Definition of a candidate tank?
CR NOT known
Definition of a control tank?
CR and service history is known.
Diff of AI vs Inspector?
Inspector is not certified, and is a rep of the organization’s MI department
Internal inspection must be supervised by?
an AI
What is consider a major alteration/repair? (8)
a) installing a shell penetration larger than NPS 12 beneath the design liquid level;
b) installing a bottom penetration within 12 in. of the shell;
c) removing and replacing or adding a shell plate beneath the design liquid level where the longest dimension of the replacement plate exceeds 12 in.;
d) removing or replacing annular plate ring material where the longest dimension of the replacement plate exceeds 12 in.;
e) complete or partial (more than one-half of the weld thickness) removal and replacement of more than 12 in. of vertical weld joining shell plates or radial weld joining the annular plate ring;
f) installing a new bottom
g) removing and replacing part of the weld attaching the shell to the bottom, or to the annular plate ring, in excess of the amounts listed in 12.3.2.5.1 a);
h) jacking a tank shell
recognized toughness
condition that exist when the material of a component is deemed acceptable
API 2000
venting atm and low pressure storage tank (nonrefrigerated and refrigerated)
API 2015
requirement for safe entry and cleaning
API 2207
preparing tank bottoms for hot work
ASME Section IX
welding and brazing qualifications
ASNT SNT TC !A
Qualification and Certification in NDE
ASME section V
NDE exams