Level 3 questions Flashcards

1
Q

Tell me about when you have prepared a detailed Building Survey report
for a client containing detailed information, conclusions and
recommendations.

A

I recently prepared a building survey report on a water damaged ground floor property within a block of flats. I was instructed to comment on the damage, determine a cause and make recommendations for remedial works. I included detailed nifromation on the construction of the property, cavity walls, dry lined, no insulation or foil, concrete floors. I concluded that damp was primarily coming from the leaking bathroom fittings but also condensation. I recommended that all of the bathroom fittings, floor covering and dry lining be removed and the substrate allowed to dry. I also recommended that a intrusive investigation of the cavity is completed to assess damage to wall ties and also to understand potential for CWI.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Prestwick Road Subsidence
What advice did you give to your client?

A

I advised the client that the approach suggested by the loss adjuster to repair the superstructure of the building only solving the immediate problems was concerning. I advised that further investigations should be completed to make a concerted effort for a claim to remove more of the trees. I also suggested that the resident should be removed from the property and a schedule of repairs should be developed to present to the loss adjuster.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Prestwick Road Subsidence
What were the recommendations you made regarding remedial work internally and externally.

A

Internally I recommended that existing poorly filled cracks with cement are removed. The cracks would then need to be repaired appropriately and decorations completed inside. Externally we recommended that the property was underpinned the full length of the wall that was being affected by subsidence.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Prestwick Road Subsidence
What made you consider it was subsidence

A

Previous reports were compelted by other surveyors which concluded that the damage was caused by shrinkage. From site there were significant BRE Cat 3 cracks that had opened up, with some doors not fitting within frames. From a desktop study, monitroing had shown further movmeent during summer months, this cyclical movement removed possibility of drainage issues. There was also a trial pit report where tree roots were found in the soil.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Prestwick Road Subsidence
What did you advise about the potential for damage after tree removal?

A

If more of the trees were removed to the rear of the property this could result in heave as moisture would not be removed from the ground from the trees, this can take several years. To avoid the potential damage of heave, the underpinning should be installe dto more than 2m.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Emma Rothschild Condition Report
What was the life expectancy for the roof covering compared to the photovoltaic panels

A

The remaining life expectancy of the concrete roof tile covering was approximately 30 years. Photovoltaic panels have a life expectancy of 40 to 50 years. However, we advised that by the end of the life expectancy of roof covering the technology of the panels would likely be obsolete/redundant and the panels could be renewed at teh same time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Emma Rothschild Condition Report
What were the significant details founds?

A

The defects found on the roof were all related to mainteance i.e. cracked or slipped concrete tiles. There was a poorly installed boiler flue which had penetrated the underfelt and not patched repaired. We recommended that a pacth repair was conducted.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Emma Rothschild Condition Report
What was your advice to the client about the roof covering.

A

I advised that the roof covering had approximately 30 years of life expectancy remaining. There were no significant defects other than maintenance issues. There was also evidence of any issues a being addressed through the maintenance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Cladding Surveys, London
What RICS guidance did you follow?

A

Before undertaking my surveys I reivewed the cladding for surveyors supplementary guidance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Carlton Vale Estate condition survey
What defects did you look for in the concrete frame?

A

I was looking for cracking and any spalling that may be related to carbonation of the steel reinforcement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Carlton Vale Estate condition survey?
Did you consider the use of HAC in the building?

A

The buildings of the estate are of the correct age for the concrete frame to be of HAC. However, when asking for the pre-survey information from the client it included test reports indicating the concrete was not HAC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Carlton Vae Estate condition survey
What deleterious materials did you find

A

Considering the age of the property I was looking out for potential ACM. The reports provided by the client did however confirmed no presence.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Carlton Vale Estate condition survey
How did you deal with inaccessible areas during your survey?

A

I comminicated the client before the survey to ensure that I was able to gain access on to all of the roofs of each of the blocks. I inspected the condition of gable walls and rear elevations from ground floor level with binoculars. When reporting on the condition of windows and doors, I included a discalimer in my report that my recommendations were based on a sample of flats that I gained entry into.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Carlton Vale Estate condition survey
When inspecting the flats what additional legislation did you need to take into considetration that did not apply to the communal areas

A

During my inspection of the flats I was sure to consider S11 of the landlord and tennant act to ensure the structure of the property was maintained and that no water was penetrating the property. I was also careful to check if all homes were fit for habitation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Carlton Vale Estate condition survey
Did you make any recommendations to your client about the inspection of elements above ground level.

A

Yes, I did make recommendations for the refurbishment of the steel double glazed windows. From my inspections of a sample of flats I found that the double glazing seals had been comproimsed throughout. I recommended that a full survey of all windows should be completed to determine the level of refurbishment and potential replacement required. I also recommended the replacement of some of the flat roof covering due to issues with leaking, I also included in my recommednation for the introduction of isnulation to meet building regulatiosn and also to aid in energy perfroamcne and condesnation within the property.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Carlton Vale Estate condition survey
How has the verdict of Ryb V Conway Chartered Surveyors altered what you inspect when surveying a property?

A

The result of the case has not altered what I survey during a property but has reitterated to me the requirement to be thorough when completing my inspections and ensure that my CPD and training is inkeeping with current market trends and the tasks I am completing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Cladding Surveys, London
What do you mean approved document B height?

A

Checkin ghte hight of property is under 18m. This is from the first floor to top of ceiling. This would determine the classification of risk in the building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Cladding Surveys, London
What were the materials you were most concerned to find on your inspections?

A

External wall insulation
Aluminium composite materials
High pressure laminates
These materials all had a high chance of becoming combustible?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Cladding Surveys, London
What was the process of completing the cladding surveys to fulfill the requirements of the approved document B ammendment?

A

Phase 1 report to determine height and external materials
Provided to fire engeineer for review
Phase 2 report of on site testing was required due to material classification or building height
Phase 3 report from fire engineer if ESW1 option A could not be awarded.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Cladding Surveys, London
How did you identify areas fro intrusive inspections?

A

The primary reason for the survyes was to determine the external wall system suitability. This meant locating compartment lines, horizontally and vertically. Areas requiring closure i.e. around windows also needed to be determined.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Emma Rothschilde Condition Report
How did you preprea for the condition survey of the roof?

A

Requested any drawings on file.
Asked the client for any details of roof instllation like guaruntees
Completed a reivew from google earth of roof spces
Arranged access to the loft spaces to determine quality of the membrane.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Emma Rothschilde Condition Report
how did you present your information on the condition of the roofs to the client?

A

Used a map and colour coding to differentiate the different roof apces. Completed schedule of condition to all of the roof spaces and elements. Advised on any major defects or issues within the main body of the report.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Emma Rothschilde Condition Report
how did you advise your client on the installation of the photovoltaic panels at Emma Rothschild?

A

The pitched roofs had a potential life span of 60 years with 40 years remaining. Flat roof covering had the potential life span of 30 years with 20 to 25 years remianing. The PV panels would have a life span of 30 years but technology would likely be outdated before then. Panels could be installed wihtout the requirement to replace the roof covering before they needed to be replaced. The panels should have been installed on the south slopes of the roofs, subject to a consultation with a structural engineer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Preswick Road Subsidence
Why had you been appointed to advise on works to prevent further strucrual damage and not diagnose the defect?

A

Our client was completing an insurance claim against the neighbouring proprety. From earlier inspections a tree had been removed, partial underpinning and repairs to the superstructure of the building had been completed.

Our client appointed us to insect and advise on whether the remedials had prevented further damage and advise on whether the property was safe for occupance or required further remedials.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Preswick Road Subsidence
What did you advie the client to prevent further structural damage?

A

Cracks internally had re-opened internally over the summer months indicating trees were still desacting the surrounding clay soil.
I advised that further soil investigations hould be completed in an attempt to find roots from the other trees.
Underpinning should be completed to the entire flank wall, as the partial underpinning was excacerbating the damage.
This method was expensive, and as an alternative a root barrier could be installed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Preswick Road Subsidence
What did you advise the client on the habitation of the property?

A

The property was not a dange to health or safety from collapse. However, the cracks within the ground floor flat were allowing a draugh an infestiation. We advised the resident should be decanted until repairs were complete?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

How would you inspect to complete a schedule of condition?

A

In a logical manner. Externally each element would be divided i.e. roof, walls, gutter,windows. Internally inspection would be done room by room and follow the same component basis.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Talk me through your advice to a client on the party Wall etc Act 1996.

A

I have advised my client on the party wall procedure in my feasibility for esmond road. One of my suggestions was to introduce a new dwelling by incorporating a basement conversion. I included in my report that due to the depth of foundations and the likely requirement to install structural steels into the wall would require both section 2 and section 6 notices under the party wall act.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

Provide some examples of where you have been invovled with work under the party wall act.

A

I have been involved with many different projects acting as both BOS and AOS. I have acted as BOS for a property in islington where a party fence wall needed to be rebuilt. I developed the section 2 notices, issued them to the AO communcaited with the AO, took out inspections and SOC and developed the award.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

How have you advised clients on statutory obligations.

A

I have advised clients on different obligations in different projects at varying stages. In SBHG, I advised on planning requirements for the replacement of rear doors to their stock. As flats do not have the same permitted development rights. I have also advised clients with stock of over 11m on their requirement for quartely checks of all fire doors and annual check of all flat entrance doors of the updated Fire safety regulations 2022

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

Emma House, cladding
What information did you consider when replacing the timber cladding and balcony strips

A

Emma house is a block of flats that exceeds 18m approved document B height. An intrusive investigation and report was completed and a report was produced by the fire engineer. I considered the Euroclass performance requirements of materials to meet the Fire rengineers recommendations, minimum of A2, to meet option 1 of EWS1. I also considered the existing fixing structure of the strips and cladding to ensure constructability while minimising cost.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

Emma House, cladding
Did you advise your client to contact their insurers about the suggested system

A

When the report was issued by the fire engineer I advised the client to contact their insurers. When selecting the systems for specifcation I recommended that the client check with their building insueres to ensure they would continue to insure the property if they were installed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

Stanmer Road, Party Wall
What notices had been served on your client?

A

My client was served with a section 2 notice as the boundary fence wall was going to be deconstructed and rebuilt to one of the properties. A section 6 notices was also issued as the basement excavations were within 6 meteres and intersected the 45 degree angle line from the existing foundations of my clients properties.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

Stanmer Road, Party Wall
Were they the correct notices?

A

Once I was appointed I requested all of the architectural and structural drawings for review. From review I was able to check that the notices that were issued were correct for the notifiable works being completed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

Stanmer Road, Party Wall
At what stage were you apoointed?

A

I was appointed once my client had dissented the works upon receving the notices. I was contacted by my client and issued them a letter of appointment to act as their surveyor under the act.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

Stanmer Road, Party Wall
Was there a schedule of condition prepared jointly before the work commences?

A

Yes there was a schedule of condition compelted of all properties that had been served notices. I liased with the residents to ensure all areas affected were accessible.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

Stanmer Road, Party Wall
Why did you not refer the dispute to the third surveyor?

A

The discussion and negotiation was still ongoing at the point of my reference to the relevant case law. Once presented the BOS requested we present the sow for the repairs required. If the BOS had continued to dispute our position, I would have notified them that our position would be notify the third survyeor of the matter for resolution.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

Stanmer Road, Party Wall
When should a thrid surveyor be agreed.

A

The third surveyor should be agreed when both party surveyors are appointed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

Stanmer Road, Party Wall
Why did you not recommend that your client consult a solicitor?

A

The matter was still within the capacity of the act. The consultation of a solicitor and legal proceedings could potentially impose significant cost and tme expenditure for my client. If the matter continued into a dispute after the involvement of the third surveyor I would have advised my client to consult a solicitor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

Pond Close/ Emma Rothschile, planning
What are your qualifications to undertake distance attenuation calculations for the noise produced by the units?

A

The calculations were only indicactive to ensure that the internal decible levels would not exceed that included in the BS and meet requirements of the noise policy statement. The calculations were not to be used for the design of the system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
41
Q

Wigston Close, Impact damage repairs
Was the wall considered a dangerous structure, if so what action did you take.

A

The wall was considered as a dangerous structure due to the damage. The tenants were removed from the property. The wall was then propeed and hoarded off to ensure that the property would not collapse and pedestrians would not be in danger.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
42
Q

When does a property require planning permission?

A

New constructino on vacant site
Non-permitted change of use
Any works that are likely to affect the appearance of a property

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
43
Q

Pond Close/ Emma Rothschile, planning
Why did the installation of ASHP’s require planning permission?

A

More than 1 unit was to be erected outside of the property
Application was related to HMO/ Old peoples home
Installation had to ensure that it would not adversely affect the residents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
44
Q

Pond Close/ Emma Rothschile, planning
How did you determine the residents would not be adversely affected?

A

Units had to be placed close to existing boiler system
Use of distance attenuation calculation to determine dBL against BSBS8233:2014 - max for bedroom at night 30dBl
Noise produced by units was then reduced by the noise insulating properties of walls
Adapater was also installed to allow units to be programmed and turned off at specficic times

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
45
Q

At Stanmer Road, which party wall notices were served and why?

A

Section 2 - Underpinning and rebuilding of rear boundary structure
Section 6 - New foundations within 3m of existing property

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
46
Q

At Stanmer Road, why did you recommend the client schedule the cost of damages to the property?

A

Once the BO had notified me that notifable works had been completed, I completed a post inspection. In more than one property there was evidence of cracks opening up, due to the underpinning. Especially in the areas of the overcroft. I recommended the client shedule the items with costs from their maintence supply chain to recover the costs in lieu from the BO.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
47
Q

Emma House, how did you know that pre-application advice would not be benefical?

A

Colleagues on other projects had attempted fro pre-applcication advice that did not expedite the process
I checked the LPA website and determined it would be a minimum of 6 weeks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
48
Q

Tell me about a report you have prepared relating to the causes of failure, likely results of failure and apprpraite remedial measures.

A

I carried out an inspection and developed a report on damp issues within a flat in Oxford. From my inspection, completing both visual internal and external inspections, protimeter and relative humidty checks I determined that the damp was likely a result of condensation. I advised that there was not appropraite ventilation in the property, with the windows being rarely openeing, extract fan not working and 1 bedroom flat having 1 resident and two dogs occupying. I recommended that heat retaining vents be installed into the external walls and a new extract fan installed in the bathrooom with an exract capacity of 16l/s.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
49
Q

Why would you use non-technical language in a report?

A

As an expert reporting on the field, I should assume that the reader will not have the level of tehcnical knowledge I do. Non technical language ensures that the reader will understand the information within the report and communictes its contents first time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
50
Q

Tell me about BRE guidance you have applied and the reasoned advise you provided as a result?

A

When compelting my inspection of Esmond Road and developing the report I used the BRE crack classification system. The cracks that I inspected were between 5 and 15mm and classified as BRE 3. I was able to advised that internal remedials could completed with some minor opening up and patching by a mason. The classification also gave me confidence in that the cracks were not structural but could affect the weatehr tighness of the property.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
51
Q

Keyworker Showers, Hillingdon
How did you deal with the supporting of shower trays where the showers had less damage?

A

For showers that did not require full refurbishment I included within my specification for the contractor to ensure that the trays have 3 shower feet that were fit correctly and tight to reduce the change of further dropping.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
52
Q

Keyworker Showers, Hillingdon
What mastic did you select and why did you choose it?

A

I specified a high quality water proof and mould resistant mastic from unibond. The reason was that I wanted to minimise risk of seals compromising that were more likely to happen from a cheaper mastic. Also during the survey stage, I noticed many of the residents were sufferening with bacteria/mould growth, I specified a mould resistant in an aim to reduce the occurence of mould or bactiera.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
53
Q

Keyworker Showers, Hillingdon
What advice did you give to your client about the risk of replacing the mastic only?

A

I advised that although the bathrooms assigned to mastic replacement were currently not suffering from severe water damage there was a risk that damage could occur if the problem of support is not addressed. This would involve removing the show unit and ensuring the chipboard floor structure was supported appropriately via noggins/joists. I was aware of the budget constraints of the client, so I recommended that a monitoring survey be completed yearly of showers with mastic reparis to ensure the remedial works were suitable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
54
Q

Keyworker Showers, Hillingdon
Did you comply with British Standard bs 5385-4, if not why?

A

This British Standard relates t the installtion of tiles. The specification for the bathroom did not involve the use of tiles, the shower unit was comprised of hygenic wall panels.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
55
Q

Magdalen damp report, Oxford
What advice did you give your client about their legal responsibilities regarding damp

A

I advised the client that under section 11 of the Landlord and Tennant Act that they are legally responsible for maintaining the water tighntess of the structure. If the damp was a result of penetrating or rising damp it would be their responsibilty to rectify the issue. Also if unaddressed, this could result in a disrepair claim from the resident.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
56
Q

Magdalen damp report, Oxford
Did you consider the possibility of wet insulation affeceting the temperature of the wall

A

The wall that was showing signs of damp had creduly installed vents at low level. I was able to carefully remove a vent and assess the condition of the cavity wall insulation. Polystyrene bead insulation was present, from touch it was not wet.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
57
Q

Magdalen damp report, Oxford
Did you determine what type of insulation was within the wall?

A

The wall that was showing signs of damp had creduly installed vents at low level. I was able to carefully remove a vent and see that polystyrene cavity wall insulation had been installed. This eluded to the fact the freeholder had tried to improve the thermal capacity of the property, anc combined with the vents pointed toward condensation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
58
Q

Magdalen damp report, Oxford
As the nomral protimeter pins only penetrate the plaster how could you assess whether the inner skin of the wall was dry or damp?

A

From my desk top study of the instruction before my inspection I understood there would be value in bringing a protimeter with deep probes to allow me to check the dampness of the skin inner skin of the brickwork.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
59
Q

Magdalen damp report, Oxford
What additional inspections did you recmmond to your client should be undertaken?

A

I recommended that an intrusive investigation of the external wall should be undertaken to ensure that interstitial condensation had not occurred.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
60
Q

Magdalen damp report, Oxford
Did you consider increasing the static ventilation of the property?

A

My recommendations included installing passivents into the external walls. The sytem I recommended removes hot humid air from the property to the outside using pressue, a permeable membrna allows for the moisture to be removed without allowing a draught inside.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
61
Q

Magdalen damp report, Oxford
What external inspection did you undertake?

A

I followed a six step inspection process. 1) Understand the construction and occupancy of the property. 2) Pinpoint the area of damp and key features of its presence. 3) Inspect externally for defects. 4) Test the moisture content of walls. 5) Surface temperature check 6) Check the ventilation of the property.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
62
Q

SBHG Window Replacement programme
Why was the problem with piers not picked up at the intial survey stage?

A

The list of the properties that were placed on the programme were derived from my clients stock condition survey data provided by a third party. I was instructed to complete surveys of the properties on the programme to pick up additional extneral repairs that could be picked up during the programme. This is when I noticed the issues with the piers and the lintel.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
63
Q

SBHG Window Replacement programme
If the problem had occurred after the windows had been installed, what could have been the cause?

A

The lintel cracking or piers leaning after the new windows had been installed could be a sign that the old windows were supporting the load of the building more than the new windows had been specified to do so.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
64
Q

SBHG Window Replacement Programme
Why could you not speak to a lintel i.e. catnic, for advice and recommendations for the lintel?

A

Although the symptoms of the defects were related to the lintels of the property, it was not clear the the defect was a cause of a broken/damaged lintel. I was able to determine that the issue was structural, but as this was outside of my area of expertise I reocmmended that a structural engineer was appointed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
65
Q

SBHG Window Replacement Programme
Why did you think the lintel had cracked, what checks did you complete?

A

I completed checks on site, including measuring the crack width to categorise it in category 3. I checked the surrounding area and internally for more cracking. The cracks were localised only to the lintel. From the location of the cracking and their width I formed the opinio that the crack was likely due to failure of the structure and not movement of the ground.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
66
Q

Prestwick Road Subsidence
What did you consider caused the problem? And what inspections did you complete to come to the conclusion?

A

Before we carried out t he inspection I compelted a review of the historical documentation, this included a report from a loss adjuster, arboricultural report and trial pit. On site I completed an inspection of all damage internally. The repaired cracks had previously opened up, with the resident advising it had occured over the previous summer. Cracks were wider at the top, trial pit information included evidence of roots adjacent from the foundations, damge was seasonal which all pointed to soil shrinkage.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
67
Q

Wigston Close, Structural Works
What immediate measures did you take for the safety of the occupants and the others?

A

Due to the wall being deemed as a dangerous structure, immediate works involved decanting residents, proping the walls with accrow props and steel beams and hording the external wall to secure the property.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
68
Q

SBHG Window replacement programme
How did you determine that the defects you noticed were structural?

A

During my inspection I noticed that the elements that were effected were the mullions and the lintel. Victorian properties of the nature typically have a construction of timber lintels above bay windows that are supported on the mullions. As both of these areas were showing signs of defect I concluded this issue was structural.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
69
Q

SBHG Window replacement programme
How did you determine that the issue was structrural and was not caused by subsidence or settlement?

A

The cracking and bowing was localsised to the mullions and the lintels. I completed an inspection to the ground floor bays and they were not showing any signs of deflection or cracking.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
70
Q

SBHG Window replacement programme
Why did you instruct the client to appoint a structural engineer for the repairs?

A

Although I was able to determine that the defects I observed were structural, prescribing and designing the repairs were outside of my experince and competence

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
71
Q

SBHG Windows
What repairs did the structural engineer presribe?

A

Install a new steel lintel to the inside which mortar concrete would be supported from
New steel posts installed to mullions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
72
Q

Keyworker Showers, Uxbridge
What was the construction of the floors at the Hillingdon keyworker accomodation and how did this cause the defects?

A

The floors were constructed of timber joists with a tounge and groove chipboard. The loose edges of the chipboard were not supported by noggins and end joints were not all supported joists. The floor was then unable to resist the load of occupant using the shower.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
73
Q

Keyworker Showers, Uxbridge
Where you prescribed a full refurbishment what did the repairs include?

A

Removal of all water damaged chipboard
Installation of noggins at loose ends of chipboard
Use of moisture resistant grade chipboard
All chipboard junctions to be supported on joists

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
74
Q

How can cavity wall insulation cause for damp in cavity walls?

A

In proper installation can cause for the cavity to be bridged
Water repellent systems must be installed to manufacturers guidance
If mortar gathers on the insulation it can allow for water to travel inside
Batt at gable ends should be taken up to verge, or a cavity tray should be installed to prevent water travelling across the top of them
Retrospective cavity fill can prevent evaporation in external skins, make the wall more vulnerable to frost attack and if mortar falls onto the fill can cause for cold bridging.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
75
Q

Magdalen Damp Report, Oxford
Explani your pcoess diagnosing the damp at Magdalen.

A

1- Understand the construction and occupancy of the property
2- Pinpoint areas of damp and mould/identify key features
3- Inspected externally for any obvious defects
4- Test moisture percentage of walls using protimeter
5- Complete temperrature check of wall surface

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
76
Q

Magdalen Damp Report, Oxford
How did you determine that the damp was likely to be as a result of condensation?

A

The areas where damp was forming were to low level and areas of low ventilation, i.e. behind furniture and curtains. I tested the walls with the protimeter and they did not give a reading of excess moisture, there was also no sign of relevant defects externally. The property also had crudely installed vents that did not retain any heat. The resident also lived in the property with three dogs indicating high levels of moisture int he air.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
77
Q

Magdalen Damp Report, Oxford
Why did you recommend the installation of a new passivents and a new extractor fan?

A

Crude ventliation had been installed into the external walls that did not have any heat retention function. This would have decsreased the internal temperature of the property and therefore lower levels of moisture it could hold.
The extractor fan in the bathroom was faulty, and was not discharging enough air. This meant mositure developed in the bathroom was moving into the flat. A new extractor fan would remove more moisture from the property.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
78
Q

Magdalen
What was the moisture content of the walls and brickwok?

A

Wall 12.5% WME
Plasterboard 9% WME

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
79
Q

Magdalen
DId you consider the potential for wet rot behind the skirting board?

A

I carried out protimeter readings to the skirtings and none read above 10%.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
80
Q

Warley Hill, Office refurb
What was the risk of the work proceeding before you had agreed the price to your client?

A

By proceeding without a cost, it presented a risk of the client being a higher rate. The client would have been able to reject the works if the contractor had provided a price for them beofer hand that was unreasonable. By instructing the works without a price, the contractor has more control over the negotiation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
81
Q

Warley Hill, Office refurb
How did you quantify the risk of proceeding wihtout costs?

A

The main risk was the client was going to be overcharged for the works, this needed to be compared against the benefit of completing the works while the scaffold was up, potential prolongation costs and complaints from residents. To quantify I explained that the risk of being over charged was relatively low as some similar items had already been included in the tender by the contractor. Meaning they could be used as a SoR. The cost of potential prolongation costs was greater than the potential for being over charged.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
82
Q

Warley Hill, Office refurb
What advice did you give to your client about the risk of completing works without confirming the costs?

A

I advised the client that completing the works while scaffold was erected for the roof and windows presented a greater economy of scale than the risk of being over charged presented. I also removed any mainteance works identfied that did not require a scaffold to be completed. Further reducing the risk of being overcharged.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
83
Q

Warley Hill, Office refurb
Why could the works not be priced beofre the works were started?

A

The works could have been priced before they were started, but this could have caused for the scaffold to be erected for longer than originally programmed. Presenting a risk of an extension of time claim to the client. The client also wanted to avoid complaints from residents. I explained the risk of proceeding without prices, but the client wished to proceed to avoid the EOT and resident complaints.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
84
Q

Warley Hill, Office refurb?
What records did you or the contractor keep of the variations?

A

The initial variations were instructed and quantified from a condition report carried out from the scaffold. The areas and quantities were recorded on drawings. I was able to check the quantities of works completed during my site inspections, I then recorded them in my site inspection reports. This allowed me to be sure my client was paying the correct amount for works received.

85
Q

Wigston Close, Structural works
Were the instructions from the client relevant events or relevant matters?

A

The client requested that the works were instructed 1 week from the completion of the programme. The works were not of a similar nature as those already included within the programme. As this was a late instruction that the contractor could not have accounted for the works in their programme. This a relevant event of a late instruction from the contractor.

86
Q

Wigston Close, Structural works
How long did the contract extension need to be to contractually require an additional interim payment?

A

The Housing Grant, Construction and Regenergation act entitles contractors for interim payments if a project exceeds 45 days. The interim agreement in the contract was montly. The extension of time took the works past the original completion date and the next interim certificate date.

87
Q

Wigston Close, Structual works
Why if the contractor would have had to price for the additional works would he had been able to claim loss and expense?

A

The late instruction fo the worsk were a relevant event under the contract. This entitles the contractor to additional loss and expense that they may have encountered. In this case the prolongation costs of the contract included primarily of site management and security.

88
Q

Wigston Close, Structural works
Did you discuss the possibility of the additional work with the contractor?

A

I had discussed the additional works with the contractor at the beginning of the programme. Including suggesting the cotnractor should price them to the client. However, the additional work items nto caused by the car impact and therefore were not part of the insurance claim. The client was adamanet they did not want the works to be completed in conjunction wtih other worsk until very late in the programme.

89
Q

Talk me through your experience of assessing and recommending entitlement for extension of time?

A

I recently assessed a contractors extension of time claim for a delay of over 2 months. The contractor claimed that all of the instructions/variations issued over the contract had caused delay. I reviewed the instructions he referred to against the programmes he issued and the records of works he provided. I categorised the instructions into ones that I would provide EOT’s and those that I would not. I then asked for the extension/delay to be quantified against each of the varitations.

90
Q

How have you advised a contractor on their contractual obligations?

A

During my case study project, the contractor installed doors that were not FD30S door sets. I advised that under the contract and the M&W documentation that they were required to install FD30S door sets.

91
Q

How have you advised a client on their contractural obligations?

A

On SBHG, the client had been witholding payment of certificates as they did did not have proof of 100% completion of properties. I advised, that the contractor is entitled to monthly payments under the contract and if the client witheld payment they would be obliged to pay interest on the payments and the contractor could suspend works.

92
Q

How have you outlined and recommended to a client the proposed contract preliminaries?

A

I have developed and proposed contract preliminaries using the NBS software. I will then present them to the client for review. I have specifically adivsed on a rate of liquidated damages for a door replacement programme in a peoples home. I advised that the rate should be equivalent to the weekly rent of a room not being occupied.

93
Q

How have you assessed the quantum of a contractors claim?

A

I have assessed a contractors claim for additional preliminaries on a window programme by asking them to break down the cost. They provided time spent. From my review it determined that they had been allocated more time to management roles than that had been spent. I asked them to provide time sheets to prove their time or I woudl reduce their claim.

94
Q

What are the contractual provisions in the JCT MW for extension of time?

A

Clause 2.8 is related to EOT
If works going to be delayed Contractor shall notify CA
If beyond contractors control i.e. variations, or not a deafult of contractor CA shall award appropriate EOT
If EOT gratned EOT cert shall be issued and all parties should be notified accordingly.
If deafult of contractor, suppliers or materials for works the contractor will not be granted EOT.

95
Q

Wigston Close, Structrural works
What method of EOT assessment did you use?

A

Overview of the facts
The delay was related to a late submission of variations from the client
Simple and straightforward analysis of time required to complete decorations.

96
Q

Caulfield Court
Why were the provisions within the contract not suitable for sealing up the doorway?

A

Removal of ceiling revealed raised ceiling level
Blockwork quantities did not account for the raised ceiling
Plasterboard partition above ceiling level needed to be blocked up to maintain 60min fire resistance

97
Q

Caulfield Court,
How did you instruct the additional works required to seal up the door way at Caulfield Court?

A

Omitted existing works
Add in costs and works related to the more comprehensive sealing required

98
Q

Wigston Close, Structural works
Why did you not identify the decoration works as part of your original scope of works?

A

The works of the project were related to the rebuilding of the structure of the building after car impact. Before works began, the client instructed a demolition asbestos survey to be completed, which damaged the entire property. The decoration works identified were not able to be claimed for from the insurance policy and the client made the decision late in the project to include them.

99
Q

What is the difference bteween a JCT Intermediate and Minor works contract?

A

MW - up to £250,000 , IM - up to £1mil
MW used for simple works, IM more complicated and potential named subcontractor/ specialist works
Both require client specification and drawings, IM will often include a bill of quantities as well
IM includes provisions for collabortive working, advanced payment, bonds and collateral warranties

100
Q

Warley Hill, Office refurb
Why did the variation works not have prices before they began?

A

Client requested a reduction in works due to budget and to complete external works while scaffold was erected
Prices could not be agreed before works were completed as project had already begun and there was a risk of going past the completion date.
There were no relevant items in the orignial schedule to develop costs

101
Q

What is the difference between a relevant event and a relevant matter?

A

A relevant matter is a matter that the client is repsonsible for affecting the progress of the project and hte contractor will be able to claim loss and expense. A relevant event is a event is caused by the client or neutral event where the contractor will claim for an extension of time.

102
Q

Esmond Road Feasibility
What were the alternatives you considered?

A

Due to the size of the plot available and the requirements of the nationally described space standards for new dwellings, which required 79m2 for a new dwelling, the only viable method for introdcing a new dwelling was to use a basement excavation. The unit was self contained and included a light well.

103
Q

Esmond Road Feasibility
What were the national space standards you described?

A

The national space standards set minimum gross internal areas for new dwellings. Due to the size and layout of the site, I knew any orientation of the two bedroom dwelling would be over two storeys. Abiding by the national space standards meant the dwelling needed to have a gross internal area of 79m2.

104
Q

Warley Hill, office refurb
Before reocmmending cavity wall insualation what British Standard did you consult?

A

I refered to PAS 2035, which is the publically availbel specification for retrofit of UK buildings. I consulted with a PAS 2035 retrofit assessor to determinet the most suitable method for improving the thermal perofrmance of the property.

105
Q

Warley Hill, office refurb
What inspection did you recommend before cavity wall insulation was adopted as the design solution?

A

I recommended that we complete an inspeciton of the cavity to understand the existing levels of insulaiton within the cavity and also to determine the cavity width. This would also allow for us to determine the peformance requirment of the newly installed caivty wall insulation.

106
Q

Warley Hill, office refurb
What were the grants and under what scheme?

A

The scheme was Eco3, which is a government scheme for energy suppliers to fund the installatino of energy improvement measures to households. The grant that was available was for the payment of cavity wall insulation to dwellings that had an energy performance E or lower.

107
Q

Warley Hill, office refurb
How were the grants applied for?

A

During the project I applied for the grant through EDF. This involved meeting a surveyor on site, they completed a survey of all of the dwellings at the property and requested EPC surveys. Once the energy perofrmance of the dwellings had been confirmed, polysterene insulation was installed and for the dwellings that met requirements the cost was removed.

108
Q

What are the characteristics of JCT MTC?

A

Used for regular programme of works with single contractor
Generally used for maintenace or minor works
Defined timer period and buildings
Agreed schedule of rates
Client issue orders for works to be done

109
Q

SBHG
How did you complete snagging inspections to ensure the quality of works to the windows?

A

I used a 6 point checking system to check for:
1- Frame damage, 2- Function of windows
3 - Prescense of trickle vents 4- Damage of panes
5- Locks and keys 6 - Seals and junctions

110
Q

SBHG
How did you advise that the windows not having trickle vents meant they would not meet building regulations?

A

Building regulation part F gives minimum ventilation
3 bedroom flat of the size required 50000m2
Background ventilation
Only one window to the rear had trickle vents
Inadequate ventilation

111
Q

SBHG
How did you overcome the issue of windows not having trickle vents?

A

Asked the contractor to provide a detail for bottom rail trickle vents
Reviewed detail and presented to planners
Once approved instructed contractor to fit retrposectively

112
Q

Emma House
What was the wall construction

A

Cavity masonry substrate
Timber battens and cladding on top

113
Q

What is Euroclass?

A

Euroclass is a classification system that groups materials based on how much it contributes to the development of a fire in its early stages.

114
Q

On Emma House, why did you use A2 materials?

A

ntrusive investigations were carried out to the property prior to my involvement to allow a fire engineer to complete the EWS form. He concluded that in order for the property to be classified as option A Euroclass A2 materials were requried.

115
Q

What is an external wall system?

A

External/Outside wall of a residential building inc:
Cladding
Insulation
Fire break systems

116
Q

What is an EWS1 process and form?

A

Process and resulting form to confirm status of EWS
Assessed by a suitable expert
Confirmed as safe or unsafe
In line with government guidance
Provides assurance to lenders/insurers/buyers

117
Q

On Emma House, how did you ensure your proposed materials could be used with the existing substrate?

A

I contacted all of the manufacturers for the replacement cladding materials to understand the fixing systems and whether they could be used in conjunction with blockwork. For the timber strips, I attended site, took measurements and created detail drawings that I could send to manufacturers to ensure they would fit the existing steel frame.

118
Q

On Emma Hosue, you mentioned you tried to reduce costs for the project by using existin substrate, how else did you try to value engineer the project?

A

Contacted a range of manufacturers
Requested costs for each of the materials
Presented the costs for each of the materials to the client

119
Q

Emma House
How did choosing a materials that resembled the existing cladding maximise the chances of planning being accepted?

A

By choosing materials that resembled the existing cladding timber strips it would minimise the impact of the works and increase chances of approval.

120
Q

What were the materials that you chose for Emma House?

A

I chose a cement fibre board product for the cladding from Rockpanel woods. This presented a Eurolcass A2 material that would resemble existing, and also had a propreitary fixing system that could be used in line with the substrate of the building.
For the balcony shading, I contacted various solar shading manufacturers for product that could be fixed to the existing steel frame. The product i chose was an aluminium box section as it had the correct classification and any RAL colour could be applied.

121
Q

What are the nationally described space standards?

A

Standard that deals with internal space of new dwellings
Defined at level of occupancy
Floor areas of key parts of rooms i.e. bedoroom and storage

122
Q

On Warley Hill what was the polypearl cavity insulation product used?

A

Insulation bead that is filled into the cavity
Beads are uniform in size and coated with glue to prevent settlement
Forms a matrix to allow for any penetrating water to drain down in the cavity as intended.

123
Q

What was the relevant building regulation and how was it applied to the specfication and instruction of the polypearl product?

A

The relevant building regulation is Part L. It required the improvement in thermal performance of the existing elements to have an improved U-value of 0.55 W/m2.k. The polypearl system improved the U value to 0.23.

124
Q

What was the government grant applied for int his project?

A

The Energy Company Obligation Scheme
ECO
Eliglble properties to save enery through subsidised Improvements.

125
Q

What was the process of acquiring the grant?

A

Make contact with EON
Put in contact with relevant third party installer
EPC’s were required to all dwellings within the flat
Installation was completed
Flats with poor enough energy performance were removed from cost

126
Q

Tell me about the impact of different design solutions and construction processes on cost and programme.

A

Typically more comprehensive and complicated method of construct may cause for increases in cost, for example the repair of timber window rather than its replacement. However, where a client finds value in a project should be determined, as a good quick fix may be of value to a client who is intending to address a more comprehensive repair in the near future.

127
Q

Tell me about your advice on the selection and application of particular processes within your area of experience.

A

I have recently advised a client on the specification of fire door repair and replacement programme. I completed an inspection with prospective contractors to get an understanding on repairs to be specified. I advised the client that if they wanted to have better cost certaintity they should complete a survey sepeartely before tendering, which could delay the process, or they could procure the survey within the spec and use a shcedule of rates afteward

128
Q

How have you liased with specialists and consultants to develop project specific design and constructino solutions,

A

I have consulted with specalist to develop design solutions outside of my expertise. In particular structural engineers and M&E consultants. Recently I consulted with a structural engineer to develop a working platform within a riser that spanned over 3 storeys.

129
Q

Talk me throgh how you have reported on the impact of different design solutions on cost of a constrcution project.

A

Recently I was asked to provide cost alternatives to the replacement of a slate roof covering to a mansard roof construction. Due to the building being listed we I could not change materials. I advised that as the external slopes were not in bad condition we could reduce cost by only replacing the internal slopes, which would also help to reudce the cost of the scaffold.

130
Q

talk me through how you have reported on the impact of different design solutions and construction processes on programme.

A

Recently I advised on repairs to timber cills to windows that were accessed via scaffold. I advised the client that the timebr cills could be repaired and would not have an affect on the programme but would likely need attention on the next mainteance programme. Or a more comprehensive repair would be to over cap them with aluminium cills, but would likely affect the programme.

131
Q

What is a hot topic in construction at the moment?

A

Sustainability is a hot topic throughout the industry at the moment and recently the UK’s first cement free mortar has been launced. Portland cement is responsible for 8% of the worlds emissions and cement free mortart could help to reduce that figure by 70%.

132
Q

What are the three types of water protection systems for basements?

A

Type A - Barrier
Type B - Integral
Type C - Drained

133
Q

What is the relevant building standard for water protection systems for basements?

A

BS8012:2009

134
Q

What is a type A water protection system?

A

Barrier system.
Incorporates a waterproof/impermeable layer into the construction of the building. It can be laid on the outside, within the structure or internally.
A double layer can be used to help ensure no water ingress.

135
Q

What is a type B water protection system?

A

Integral system.
The water protection system is built into the structure of the building, either using waterproof cement or structural steel.

136
Q

What is type C water protection system?

A

Drainage system.
Water is allowed to penetrate into the property and then is drained through the cavity.
A pump or drainage sytem will then take it out of the property.

137
Q

Tell me about your preperation of the design and specification of a building project from outline proposals to compeltion of the design and specficiation process.

A

I have recently been involved with the specification design and delivery of a cyclical redeocration project. The outline proposal was developed from a detail condition survey of the scheme, which reommendations were then included within a report. A significant item was to replace the timber walkway balustrades. However, due to budget constraints and leaseholder S20, the client requested their repair rather than replacement. I completed a detailed survey of all balustrades and quantified the different repairs required. I then specified the type of materials, treated softwood, fixings and decoration requirments.

138
Q

Talk me through your experience of the specification process, including detailed knowledge of the main methods of specification.

A

I have been involved with different projects through the entire design and specification process. The process can be intitated at RIBA Stages 0 and continues at 5. For example, in my case study intital design requirements were determined at the strip out stage where a descrptive specifcation of elements meeting building regulations were discussed. For example the requirement of fire compartmentation to the hall and acoustic requirements to the party wall. I would then develop a performance specification that could be issued to the contractor outlining exact materials, methods and standards to be completed. During the project I was completed a prescriptive specifiction of the fire curtain for the contractor to implement that would meet the requirements of buildng regulations part B.

139
Q

How have you dealt with the design and specifiction process, and its relevance and importance to the procurement and execution of the contract selected for the building works?

A

I have been involved with projects that have been procured through different contracts. I have developed specifications for fire door sets that are descriptive so that the works can procured through a JCT MW with contractors design to allow for the specialsied contractor to procure materails that met performance requirements.

140
Q

How have you managed the design process to incorporate design works by other in the specification?

A

With reference to Hillcrest, the project involved elements of asbestos removal and replacement of meters and electrical services. At my appointment, I informed the client that specialist consultants should be appointed to design the areas around these elements. I appointed an M&E and Asbestos consultant from our internal approved consultant list. I communicated with them and met them onsite to ensure that the objectives/brief was understood. A plan of work and M&E spec was developed that I included within my overall specification.

141
Q

Hillcrest Fire Remedial Works
What materials did you specifiy for the compartmentation to the gas services in the duct?

A

I specified a gyproc shaft system that would meet the 30 minute fire resistance requirement. I also included a FD30s intumescent grills and mainteance hatches.

142
Q

Hillcrest Fire Remedial Works
How did you deal with the ventilation and what guidance a part from the building regulations did you follow?

A

To address the ventilation within the riser we introduced an intumescent grill at the top of the riser and at the bottom of the riser. We then allowed for the floor slab to core drilled to allow for natural ventilation. I referred to BS 6891 table 6 which outlined a requirement for the grills to be 0.05m2.

143
Q

Hillcrest Fire Remedial Works
How did you design access into the duct for mainteance purposes?

A

To ensure that mainteance access was available to to all of the risers, I specified that a FD30 maintence hatch was installed at high and low levels.

144
Q

Hillcrest Fire Remedial Works
Did you check the duct where the pipework went into individual flats or other areas?

A

The view of the gas services were obstructed by the asbestos insulation board within the cupboard. As I was unable to prescribe firestopping works to be priced exactly, I included a schedule of rates within the specification for a range of firestopping works for the contractor to price. I also included within the specification an item for the CA to inspect all areas once asbestos had been removed and new services had been installed.

145
Q

Hillcrest Fire Remedial Works
What building regulations did you comply with?

A

All works related to firestopping and the new riser fire doors were compliant with building regulations. Riser doors to FD30 and firestopping to maintaint the 60min compartment line. The electrical components of the project would all be self certified. Approved document B.

146
Q

Wigston Close, Structural works
How did you incorporate the structural engineers’ requirements into your specification?

A

I included the structural eningeers requirements as an appendix to my specification document. I then ensured that all prescriptive standards for materials and workmanship were included in my document.

147
Q

Wigston Close, Structural works
What if any immediate work did you specify?

A

Due to the wall being deemed as a dangerous structure, immediate works involved decanting residents, proping the walls with accrow props and steel beams and hording the external wall to secure the property.

148
Q

Wigston Close, Structural works
What were the additional items that you added to the specification?

A

Additional items included adding decorations and floor covering to the specifiction.

149
Q

What is the difference between a performance and a prescription specification?

A

Performance specifcation - also known as open
Prescriptive specification - also known as closed
Performance provides more freedom to contractor to achieve the desired end goal, therefore potentailly finding best value for money. Typically used on straight forward projects.
Prescriptive specification sets out exactly what will be expected from the contractor at the end of the project. This enables the client to be sure of what they will get for their investement. Often used in projects where specialist systems are requried.

150
Q

What type of specifcation did you use in your case study?

A

The specification used for St Francis house was a mixture of performance and prescriptive. I used presriptive methods for elements that required building regulation control i.e. inuslation, acoutsic plaster board and structure.

151
Q

Warley Hill
How did you apply building regulations to the design of the entrance?

A

External landing with a minimum width of 1200mm
Light outside entrance with motion detecotr
Minimum clear width opening of 850mm
Accesible threshold - level threshold

152
Q

Warley Hill
How did you apply building regulations to the design of the habitable areas

A

Minimum clear space in front of kithcen appliances of 1200mm
Opener in living room 1200mm above floor level
750mm free space to either side of bed

153
Q

Warley Hill
How did you apply building regulations to the design of the bathroom

A

Door opened outward into the hallway
Shower had potentaial for level access adaptation
Access zones for basin and WC

154
Q

Warley Hill
How did you apply building regulations to the desing of the services?

A

All sockets, stopcocks, controls between 450 and 1200mm above floor level and 300mm away for wall
Consumer switches mounted between 1300a nd 1450mm
Hnadles to windows located at 450mm and 1400mm from floor level
Wireless thermostat controls

155
Q

Warley Hill, Office Refurb
What was the relevant building regulation and how was it applied to the specification of the polypearl porcuct?

A

The relevant building regulation is Part L. It required the improvement in thermal performance of the existing elements to have an improved U-value of 0.55 W/m2.k. The polypearl system improved the U value to 0.23.

156
Q

Tottenham Feasibility
Why did you present a range of different options to solve the security issues?

A

There were leaseholders within the block
Client asked for a range of options relating to cost
Options that included the renewal or modifcation of door entry system
The was scope to re-arrange the bin store within the car park to solve the issue subject to cost
Client wanted to present options during S20 process

157
Q

Tottenham Feasibility
What options did you present to your client?

A

Installing a manual swing gate on the existing property
Installing a automatic swing gate on the existing boundary line
Installing a cantilever gate system on now boundary to maximise space
Moving the boundary line to incorporate a parking space that was currently outside the existing wall

158
Q

Tottenham Feasibility
How did you determine the space outside the existing boundary belonged to your client?

A

I procured the title plans from the land registry which outlined that the space outside existing boundary was included within the clients freehold

159
Q

Tottenham Feasibility
Were there any regulatory issues you encountered?

A

Neighbour had an easement through the car park
Client ahd to follow the S20 process
Planning would also be required due to nature of works

160
Q

Tottenham Feasibility
What issues did you encounter with your suggestions

A

Any automated gate would need to be interegrated with existing entry system
I attendted site with a specclist contractor to determien whetehr it was feasible
Due to age and current condition of system, it could nto be intergrated
Therefore, there was a signifcant cost to renew the system

161
Q

What is a client brief?

A

The purpose of a client brief is to provide a firm foundation for the initiation of the project.
It is a formal statement of the objectives and functional and operational requirements of the finished project.
It should be in sufficient detail to enable the integrated project team to execute the specification and detailed design of the work and is therefore an essential reference for the team

162
Q

Name some British Standards you have referred to in your specifications?

A

BS7974- Fire Safety Principles to the design
BS 476- Fire testing requirements
BS 7913: 2013- Conservation and Hisotric Buildings

163
Q

Hillcrest
What were the asbestos materials and what was the type?

A

The riser cupboards had asbestos insulation board containing amosite.

164
Q

Hillcrest
How did you know what type of asbestos was included?

A

A demolition survey had been undertaken before we were appointed. Determining that it was amosite.

165
Q

Hillcrest
How was the client managin their responisbility toward the asbestos before the projecT?

A

The ACM had been encapsulated and management reports were being completed.

166
Q

Cladding Surveys, London
What training do you have to identify cladding systems, materials and quantities?

A

I have undertaken both a fire stopping and fire door course, which has given me an understanding of the priniples of fire safety inbuilding comparmentation. Before completing the surveys, I underwent a “briefing” session with my senior reveiwing RICS cladding for surveyors guidance. Including reviewing the types of cladding, methods to identify i.e. tapping, magnets and cut edges.

167
Q

Cladding Surveys, London
Does your PII cover you for these works?

A

The surveys were only to determine the type of materials and potential risk. The puprose of the reprots was to provide a fire engineer enough information as to whether they could sign the EWS1 form, or more information was requried.

168
Q

Drake and Freeman, Fire safety works
How did you check the compliance of the new fire doors?

A

When visiting site I took the fire door test, certification and installtino information with me. I then completed a five point inspection:
1) Certification, check for labels or plugs
2) Gaps, under 4mm to top and sides of door, 8mm to base
3) Seals, check condition of intumescent and if brush seals are in contact
4) Hinges, check for 3 sets, 120-150mm from top, 200-250 bottom and then third equal distance between
5) Close, check the door will close and latch on its own from any angle

169
Q

Drake and Freeman, Fire safety works
What BS did you check against?

A

My specification was descriptive and the selection of door product was part of the contractors design portion. Included within my spec that they should BS 476 and or BS EN 1634. I would then check the certification on the door set to ensure the materials had been tested to the building standards.

170
Q

Drake and Freeman, Fire safety works
Why did you specifiy heat detectors int eh bedrooms and not smoke detectors?

A

I asked for an updated specifiction for the heat detectors as the residents were allowed to smoke in their bedroooms. As the rooms were small, this could of led to frequent occurences of false alarms.

171
Q

Drake and Freeman, Fire safety works
What BS did you complu with for this recommednation?

A

The specification from the external consultant was made to meet BS 5839-1.

172
Q

Drake and Freeman, Fire safety works
What other legislation did you consult a aprt from the building regulations?

A

The fire safety bill was another part of relevant legislation, as this was the basis for the fire risk assessment that drove the project.

173
Q

Drake and Freeman, Fire safety works
What other documentation did you reivew?

A

The fire risk assessment.

174
Q

Drake anf Freeman, Fire safety works
Did you recommend to the client to make the rooms non-smoking?

A

I did recommend to the client to make the rooms non-smoking to reuce fire hazards and also prolong decoration quality.

175
Q

Drake and Freeman, Fire Safety works?
Would the bedrooms be classified as workplaces under smoke-free law: guidance on the changes from March 2021

A

No, the dwellings are not workplaces and do not fit into the categories outlined in the guidance. As the dwelling was not a place of work, members of public do not enter for goods /services.

176
Q

During your cladding surveys, why did you need to interpret where compartment junctions were?

A

To determine where cavity barriers should be installed
They should be at edges of cavities including windows and doors
A junction between external cavity wall and compartment floor or wall
A junction between an internal cavity and compartment wall or floor

177
Q

At Drake and Freeman, why were fire doors and clsoers required?

A

The bedrooms within the flats were all accessible from the hallway
Protected entrance hall was required
FD30 doors were required on each habitable room

178
Q

At Drake and Freeman, how did you inspect the ironmongery and doors once they were installed?

A

Used a 5 point checking system:
1: Labels - check for labels or plugs to ensure door was certified
2: Gaps and seals - checked smoke and intumescent seals are intact, gaps around edges no more than 4mm and 8mm at bottom
3: Closer and hinges - check door closes from any angle, check hinges are ce marked and have 3 screws
4: Glass and glazing - make sure bead is continuous and glass is nto damaged
5: Leaf and frame - ensure frame is not damaged and door closes at all anlges

179
Q

At Drake and Freeman, how did you ensure that the doors were third party certified?

A

Requested product infomration from the contractor
Took a photo of the label from the doors
Cross referenced label with manufacturer

180
Q

At Drake and Freeman, why was the specification provided by an electrical consultant?

A

Client had already procured the specification before works began
We were employed to manage the project post contract

181
Q

Explain what funding is being made availble to fix cladding issues by the government?

A

The building safety fund introduced in 2020 to cover cost of unsafe non-acm cladding on high rise buildings over 18m

182
Q

Explain your uderstanding of the Building Safey Act 2022?

A

Brought in to make buildings and residents safer
Building Safety Regulator which will sit within the Health and Safety Executive.
including taking over the building control role for higher-risk buildings, enforcing sanctions for non-compliance, improving the competence of those working on those buildings and overseeing the safety of those buildings in occupation.
Also introducing more measures into preventing leaseholders to paying costs.

183
Q

Explain how the statutoury waterfall will work in relation to remediation costs for historic fire safety defects over 11m tall?

A

Only where developers cannot be traced for the faults in building can they ask for building owners to pay monies
Where building owners have measn and wealth to pay for remedial works they cannot charge leaseholders
Where cladding requires removing they cannot charge leaseholders
Leaseholders will only be charged if building owerns cannot cover the costs of the remediation of the building

184
Q

Warley Hill, Office refurb
What governed your weekly inspections?

A

As contract administrator it was my responsibility to maintain a site presence and ensure that works were being completed as stated in the contract. My weekly inspections were also governed by the works being completed, i.e. before scaffold was struck I ensured I had inspected all areas at high level.

185
Q

Warley Hill, Office refurb
What case law gives you guidance on what to expect and how often?

A

The McGlinn V Waltham Contractors case sets down general principles of how frequently and when contract administrators/project managers should complete inspections to avoid litigation.

186
Q

Warley Hill, Office refurb?
What are the principles of McGlinn and Waltham contractors?

A

a) The frequesncy and duration of inspections should be tailored to the nature of the works going on at the site from time to time.
B) Depending on the importance of the particular element or stage of the works, the inspecting professional can instruct the contractor nto to cover up the relevant elements of the work until they have been inspected.
c) The mere fact that defective work is carried out and covered up between inspection will not automatically amount to a defence an alleged failure to carry out proper inspections.
d)If the element of the work is important because it is going to be repeated throughout the project, the inspecting profesiional should inspect early to form a view on the contractors ability to carry out that particular task.
e) Reasonable examination of the works does not require the inspector to go into every matter indetail.
f) The architect does nto guaruntee that their inspection will reveal or prevent all defective work. It is not apporpariate to judge an architects performance by the result acheived.

187
Q

SBHG Window replacement programme
What guidance did you use when inspecting the works?

A

When inspecting the works, I ensured that I had my specification for the windows and survey data on my person. Allowing me to check the confriguration and iron mongery. I also used a seven step window inspection checklist:
1) Check trickle vents
2) Inspect frame
3) Check glazing
4) Check seals around the external and internal for water tightness
5) Operation
6) Ironmongery and locks
7) Decorations

188
Q

SBHG Window replacement programme
What building regulations do the fensa/certas cover?

A

B, F, L, K, and M

189
Q

On Warley Hill, how often did you visit site?

A

I attended weekly throughoutthe project
Completed site inspection reports and issued them to the client
Commenting on workmanship and material quality
Checking works against programme

190
Q

On Warley Hill, how did you determine that the doors were not as specified?

A

Due to the escape distance at one point being more than 9m, doors were required to be FD30
Contractor installed door closers
Doors has no labels and hinges were not appropriate

191
Q

On Walrey Hill, how did you instruct the contractor to replace the doors?

A

I wrote to the contractor formally
Instructed them to replace the doors
Referring to the material and workmanship clauses

192
Q

On SBHG, how did you ensure that snagging or quality issues were not repeated?

A

Carried out inspections weekly with site manager
Identified snags early to prevent repeats
Recorded in a snagging document that was updated weekly and issues to the client and contractor
Revisited to ensure that snags were compelted

193
Q

Carlton Vale Condition survey
What is the RICS guidance on planned maintenance?

A

RICS Guidance note: Planned preventative maintenance of commerical and residential property

194
Q

Carlton Vale Condition Survey
What guide did you use to prioritise the works?

A

I modified the condition rating system that is set out in the RICS condition report to prioritise works:
1) Item has failed and needs to be addressed immediately
2) Item will fail in the next 8 years and should be addressed on the next programme
3) Items do not have any defects.

195
Q

Carlton Vale Condition Survey
What health and safety issues did you find and how did you advise your client?

A

Within one the flats I found there was significant water damage to the ceiling and the wall. This presented a ahealth and safety risk of falling plasterboard and air quality for the resident. I adivsed the client to issue a responsive maintenance repair to remove all water daamge elements and also complete a leak detection in inviestgation.

196
Q

Carlton Vale Condition Survey
What dcoumentation did you request a part from the FRA and why?

A

I requested the following information:
- Any O&M manuals or H&S files
- Guaruntees or warranties of works
- Any properties with resident complaints
- Recent repair information
- Asbestos sruveys
This would allow have a hollistic view of the condition of the property before visitign site.

197
Q

Carlton Vale Condition Survey
What advice did you give your client about your survey and the fire risk assessment?

A

I advised that the items within the fire risk assessment were identified as immediate remedial measures. I would include them within the report and budget, but these items should be addressed outside of the mainteance programme to meet the requirements of the notice.

198
Q

Carlton Vale Condition Survey
Over what period did you format the plan for and why?

A

My brief was to complete a condition survey and to determine works that would need to be included on the next cyclical programme and those that could make it to the next in 10 years. Items included in my report for replacement were those that were due to fail within the next 8 years, and thereofer should be included in the next programme.

199
Q

Carlton Vale Condition Survey
Why were your inspections influenced by the FRA?

A

The client had advised me that FRA works were to be procured before the cyclical and did not need to be included on the report. I therefore knew I did not need to include the items within my report.

200
Q

Carlton Vale Condition Survey
What is the current RICS guidance on the period of a long term mainteance plan?

A

Within RICS’s guidance note of planned preventative maintenance, it advises that a report should be for the period between 5-10 years.

201
Q

Carlton Vale Condition Survey
How did you deal with the M&E services?

A

As M&E elements of the building are out of my expertise, I appointed a specialist consultant to prepare condition reports and budgets for the M&E services.

202
Q

Carlton Vale Condition Survey
How did you deal with inflation/increase in cost from the date you did the survey to the last year on your plan?

A

My appointment was not to develop a mainteance plan, but give advice on what works should be included on the next cyclcial programme.

203
Q

Carlton Vale Condition Survey
Were there any lease conditions you had to consider?

A

No, all residents were tenants at the block.

204
Q

Carlton Vale Condition Survey
What environmental conditions did you include in your report?

A

I advised the client that all of their dwellings should be meeting the MEES standards before new tenancies were beginning. EPC surveys should be compelted to all dwellings as part of the mainteance programme. The flat roofs to the property were beginning to fail and I reocmmended they were replaced and that thermal performance of the roof would be required to meet Part L of building regulations.

205
Q

Carlton Vale Condition Survey
Did you check to see if your recommendations contravened any service charge conditions?

A

Service charge was not applicable as there were no leaseholders in the block.

206
Q

Cartlon Vale Condition Survey
Following the case of Rybe V Conway Cartered surveyors, did you look at the grounds?

A

I completed inspections and took records of all groudns as it was part of my appoitnments.

207
Q

For Carlton Vale, how did you determine whether items should be included on the next mainteance programme?

A

The client briefed that the cyclical programme was 8 years, with the next being in 2
Used a three stage rating system
1) Whether the item has failed and needs to be addressed immediately
2) Whether item is going ot fail fail before the second programme in 10 years
3) Whether item is in good condition and can be addressed in the next programme

208
Q

For Carlton Vale, what information did you request before completing the condition survey?

A

Any fire risk assessment data
Previous mainteance works
Any outstanding legal disputes with residents

209
Q

On Carlton Vale, what were repairs that you reocmmended for the next planned mainteance?

A

Replacement of steel single glazed windows, due signifcant draughts
Repair to ashphalt coverings to walkways
Repairs to failing flat roof coverings