Lecture 1 wordy ones Flashcards
1
Q
Agency Costs (DB)
A
- specimen design
- laborious tender
- consultant costs
- lower number of bids
2
Q
Agency Benefits (DB)
A
- control over design
- best value
- best design
- DB advantages (less claims, less costs, schedule, contractor leads designer)
3
Q
Contractor Costs (DB)
A
- tender costs (1.5%)
- less control
- best design no guarantee
4
Q
Contractor Benefits (DB)
A
- ability to add value
- paid for tender no matter whether they win
- no non-conforming bids