IRO 010

What are examples of data needed by RC for real time monitoring?

A
  • Actual system load
  • Generator output
  • Frequency
  • Powerflow in MW and MVAR
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

IRO 010

What are examples of data needed by RC for real time assessment?

A
  • Real time data such as MW

- MVAR flow evaluated under given conditions such as loss of generation, transmission, or load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

IRO 010

What are examples of data needed by RC for operational planning analysis?

A
  • Load forecasts
  • Expected generation output levels
  • Known system constraints (facility outages or limitations)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

IRO 010

What entities may receive a data specification from the RC and what must they do?

A
  • RC, BA, GO, GOP, LSE, TO, T owner, DP.
  • Must satisfy the data obligation using a mutually agreeable format and security protocol, and process for resolving data conflicts
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

IRO 010

What might be included in a data specification from the RC?

A
  • List of required data and info needed
  • Timeframe and periodicity for providing it
  • Provisions for notification of current and special protection system status / degredation
  • deadline for providing it
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

IRO 002

What type of data might be collected by RC?

A

Generation status changes over 50 MW
Transmission status changes (Over 100kV)
Daily/Hourly/Weekly forecasted system loads.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

IRO 002

What are the requirements for RC monitoring capabilities?

A

Detailed real-time monitoring capability in RC area

Sufficient monitoring capability in surrounding RC area.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

IRO-002

What types of information require special emphasis and must be provided over a redundant infrastructure?

A

Alarm management and awareness systems

Automated data transfers, and synchronized information systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

IRO-002

How often must the redundant data exchange functionality be tested?

A

Every 90 days.

(If test is unsuccessful, RC must take action within 2 hours to restore).

The redundant requirement applies only to data exchange needed for real time monitoring and assessment (not operational planning), specified in R2.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

IRO-002 R4

System operators will have authority to approve planned outages of what?

A

Its telecommunication, monitoring, and analysis capabilities.